Guides
The questions we are asked before a project starts, answered from the legislation and official guidance. Each guide lists the sources it was written from.
Fire strategy basics
What a fire strategy is, what goes in one and when you need it.
What Is a Fire Strategy? A Plain English Guide
A fire strategy explains how a building meets the fire safety requirements of the Building Regulations and how its fire safety measures work together. No law in England defines one or makes it a required application document. It is still expected because building control must be satisfied on Part B and Regulation 38 handover draws on it.
Reviewed 23rd November 2026
Fire Strategy Report Example: What a Good One Contains
England has no official fire strategy template. A good report follows the five Part B requirements, states the design guidance used and why, records every assumption about management and lists the systems that Approved Document B says should be handed over. A 22 page RIBA Stage 2 strategy prepared for the Home Office was published on GOV.UK in 2026.
Reviewed 23rd November 2026
Do I Need a Fire Strategy? When One Is Required in the UK
Most buildings the Fire Safety Order covers need one in practice, even though no law in England requires a document called a fire strategy. A full plans application, the Gateway 2 fire and emergency file, planning fire statements and Regulation 38 handover all call for its content. A single private house usually needs none of them.
Reviewed 23rd November 2026
How Much Does a Fire Strategy Report Cost?
No official source publishes a fire strategy fee. The fee is agreed privately and depends on the building's size, height, use, design stage, route to compliance and any modelling. Statutory fees sit on top: building control charges and, for higher-risk buildings in England, Building Safety Regulator charges such as £195 with a Gateway 2 application plus £156 an hour.
Reviewed 23rd November 2026
Fire Strategy vs Fire Risk Assessment: What Is the Difference?
A fire strategy is a design document explaining how a building meets the fire safety requirements of the Building Regulations. A fire risk assessment is the Responsible Person's continuing legal duty under article 9 of the Fire Safety Order for premises in England and Wales. The strategy says what should be there. The assessment checks what is there.
Reviewed 23rd November 2026
Who Writes a Fire Strategy Report?
No law in England or Wales says who may write a fire strategy. The law requires competence: anyone doing design work must have the skills, knowledge, experience and behaviours to make it comply. Clients must take all reasonable steps to check this before appointing. The government plans to make preparing the strategy a function reserved for registered fire engineers.
Reviewed 23rd November 2026
When Should a Fire Strategy Be Written? Fire Safety at Each RIBA Stage
No law ties a fire strategy to a RIBA stage. RIBA's Plan of Work 2020 makes fire safety a core strategy from Stage 0. The fixed points come from law. In England they are the planning fire statement for relevant buildings, Gateway 2 approval before work starts on a higher-risk building and the Regulation 38 handover no later than completion.
Reviewed 23rd November 2026
Fire Strategy Drawings Explained: What They Show and What Building Control Expects
Fire strategy drawings are plans marked up to show how a building meets the fire safety requirements: escape routes, compartment lines, fire doors, fire safety systems and fire service access. No law defines the term. Building control, the Building Safety Regulator at Gateway 2, the fire service and the Regulation 38 handover all ask for plans showing this information.
Reviewed 23rd November 2026
What Does Building Control Look For in a Fire Strategy?
Building control checks that the plans and fire strategy show the work will meet Part B. An English local authority must grant full plans unless the application is incomplete, lacks the detail needed or shows a contravention. The fire service is consulted on buildings the Fire Safety Order covers. Queries range from missing information to concern with the design approach.
Reviewed 23rd November 2026
Fire Strategy, Fire Statement or Safety Case: Which Document Do You Need?
Each document belongs to a different stage. A fire strategy supports building control and handover. A fire statement goes with some planning applications in England and London. The Gateway 2 fire and emergency file goes to the Building Safety Regulator. Regulation 38 information passes to the Responsible Person. The fire risk assessment and safety case report cover occupied buildings.
Reviewed 23rd November 2026
Existing buildings and handover
Fire safety information at completion and for buildings already in use.
What Is a Retrospective Fire Strategy and When Do You Need One?
A retrospective fire strategy is a fire strategy for an existing building that never had one or has lost it. It records how the building protects people from fire today. No law names it or requires one. It is a practical way to meet fire risk assessment duties and, for higher-risk buildings in England, information and safety case duties.
Reviewed 26th November 2026
Keeping a Fire Strategy Up to Date After Alterations
Outside the higher-risk building regime, no law says in terms that a fire strategy must be updated. Alterations still force a revision through the Building Regulations rules on material alterations and change of use, Regulation 38, Building Safety Regulator approval and change control for higher-risk buildings in England and the Fire Safety Order review of the fire risk assessment.
Reviewed 23rd November 2026
Fire Strategy for a Change of Use
A material change of use, such as offices converted to flats, brings the Building Regulations 2010 into play. In England and Wales the work must make the building meet requirements B1, B2, B3, B4(2) and B5, with B4(1) on external walls above eleven metres. A fire strategy is the usual way to show how the existing building will meet them.
Reviewed 23rd November 2026
What Is Regulation 38 and What Should Be in the Pack?
Regulation 38 of the Building Regulations 2010 makes the person carrying out building work give fire safety information to the Responsible Person by completion or by occupation if earlier. In England and Wales the Responsible Person must acknowledge it and building control is usually told within five days. The pack normally includes the fire strategy, as-built plans and system records.
Reviewed 23rd November 2026
Regulations and design guidance
The guidance a fire strategy is written to, and when engineering takes over.
Approved Document B Explained: Volume 1 and Volume 2
Approved Document B is the statutory guidance on meeting the fire safety requirements of the Building Regulations 2010 in England. It is approved under section 6 of the Building Act 1984 and shows one way to comply, not the only way. Volume 1 covers dwellings, including blocks of flats. Volume 2 covers all other buildings.
Reviewed 23rd November 2026
BS 9991, BS 9999 or Approved Document B: Which Route Fits Your Building?
Approved Document B is the statutory fire safety guidance in England. BS 9991 and BS 9999 are British Standard codes of practice that can be adopted instead, BS 9991 for residential buildings. If you adopt one, Approved Document B says its fire safety recommendations should be followed in their entirety, with any supplementary guidance forming an integrated approach.
Reviewed 23rd November 2026
What Is a Fire Engineered Solution?
A fire engineered solution is a fire safety design justified by engineering analysis instead of the standard provisions of guidance such as Approved Document B in England. It is a recognised alternative route to meeting the Building Regulations. The overall level of safety must be no lower than the guidance provides and those doing the work must demonstrate it.
Reviewed 23rd November 2026
Open Plan Flats and Fire Safety: When You Need a Fire Engineer's Report
In England, Approved Document B gives three layouts for a single storey flat more than 4.5 metres above ground. They are a protected entrance hall, an alternative exit or a plan with a 9 metre maximum travel distance and cooking away from the entrance. Those doing the work are responsible for showing that any other layout is no less safe.
Reviewed 23rd November 2026
Evacuation Strategies Explained: Stay Put, Simultaneous and Phased
An evacuation strategy says who leaves a building in a fire and when. Stay put, used for blocks of flats, relies on each flat containing a fire so other residents can remain. Simultaneous evacuation empties every storey at once. Phased evacuation moves the fire floor and people with reduced mobility first, then others two floors at a time if needed.
Reviewed 23rd November 2026
Progressive Horizontal Evacuation Explained
Progressive horizontal evacuation moves people away from a fire through a fire-resisting barrier into an adjoining protected area on the same floor. They wait there or move on to another area or a stair. It is the standard design basis for most healthcare premises under HTM 05-02 and for care homes for the elderly under Approved Document B in England.
Reviewed 23rd November 2026
Compartmentation and Fire Stopping Explained
Compartmentation divides a building into fire resisting cells so a fire is held where it starts. In England it is one of the ways requirement B3 of the Building Regulations is met. Fire stopping seals joints and service openings and cavity barriers close concealed spaces. English blocks of flats above 11 metres also need regular fire door checks.
Reviewed 23rd November 2026
Smoke Control in Buildings: AOVs, Shafts and Pressurisation
In England, Approved Document B recommends ventilating the common corridor or lobby outside each stair in a block of flats to control smoke and protect the stair. It allows external wall vents, natural smoke shafts or mechanical systems, pointing to BS EN 12101-6 for pressurisation. In England and Wales responsible persons must keep the systems maintained once occupied.
Reviewed 23rd November 2026
Car Park Ventilation and Smoke Clearance: What the Guidance Requires
In England, Approved Document B gives three ventilation routes for car parks. An open-sided car park has permanent openings of at least 1/20 of each level's floor area. Other car parks should have natural openings of at least 1/40 or mechanical ventilation designed to operate at 10 air changes per hour during a fire, in two independently powered parts.
Reviewed 23rd November 2026
Sprinklers in New Blocks of Flats: The 11 Metre Rule in England
In England, Approved Document B says new blocks of flats with a top storey more than 11 metres above ground should have a sprinkler system throughout, provided within the flats, to BS 9251. The threshold fell from 30 metres in an amendment that took effect on 26th November 2020, which also added wayfinding signage for the fire service.
Reviewed 23rd November 2026
Second Staircases in Residential Buildings Over 18 Metres
In England, Approved Document B says blocks of flats with a top storey of 18 metres or more should have more than one common stair. Published on 29th March 2024, the amendment took effect on 30th September 2026. Work under earlier applications keeps the old guidance if sufficiently progressed by then or within 18 months beginning on that day.
Reviewed 23rd November 2026
External Walls and the Combustible Materials Ban Explained
Regulation 7(2) of the Building Regulations 2010 requires materials in the external wall or specified attachments of a relevant building to be class A2-s1, d0 or A1, with listed exemptions. In England and Wales a relevant building has a storey at least 18 metres above ground and contains dwellings, an institution or residential rooms. Scotland's ban starts at 11 metres.
Reviewed 26th November 2026
Fire Safety in Timber Buildings: Mass Timber, CLT and the Rules
In England and Wales structural timber cannot form part of the external wall of a relevant building, one with a storey at least 18 metres above ground. Regulation 7(2) requires class A2-s1, d0 or A1 there. Elsewhere timber can be used where the Building Regulations are met. Official guidance says standard provisions may not suffice for tall timber buildings.
Reviewed 23rd November 2026
Building Safety Act and higher-risk buildings
The gateways, the Building Safety Regulator and the duties that follow occupation.
What Is a Higher-Risk Building? The 18 Metre and 7 Storey Test
A higher-risk building in England is at least 18 metres tall or has at least 7 storeys. During design and construction it must also contain at least two residential units or be a hospital or care home. Once occupied, only buildings with at least two residential units count. SI 2023/275 sets how height and storeys are measured.
Reviewed 23rd November 2026
Building Safety Act Gateways Explained: Gateway 1, 2 and 3
The Building Safety Act gateways are three control points for higher-risk buildings in England. Gateway 1 is the fire statement sent with the planning application. Gateway 2 is building control approval from the Building Safety Regulator before work starts. Gateway 3 is the completion certificate that must be issued before residents move in.
Reviewed 26th November 2026
What Is a Gateway 1 Fire Statement?
A Gateway 1 fire statement must accompany a planning application in England for a building of 18 metres or more or seven or more storeys with two or more dwellings or educational accommodation. Required since 1st August 2021, it sets out the fire safety principles and standards applied. Since 27th January 2026 the Building Safety Regulator has been statutory consultee.
Reviewed 23rd November 2026
Gateway 2 Fire Strategy: What the Building Safety Regulator Expects
At Gateway 2 in England the application to the Building Safety Regulator must include a fire and emergency file, which BSR says is often known as a fire strategy. It must show how the design meets the building regulations on fire spread and structural failure and how the owner will manage evacuation. BSR consults the fire service before it decides.
Reviewed 23rd November 2026
Why Gateway 2 Applications Are Rejected and How to Avoid It
In England the Building Safety Regulator can reject a Gateway 2 application that lacks detail to show compliance, shows a building regulations breach or sets out inadequate plans for managing compliance. Invalid is a separate outcome for missing documents. In the 12 weeks to 1st November 2026 BSR approved 95 percent of new build decisions, excluding invalid and withdrawn cases.
Reviewed 23rd November 2026
Gateway 3: The Evidence You Need Before Occupation
Gateway 3 is the Building Safety Regulator's completion certificate for higher-risk buildings in England. The client applies at completion with the as-built fire and emergency file, change control log and signed declarations. BSR consults the fire service, inspects and must decide within 8 weeks unless longer is agreed. Occupying new units before the certificate is issued is an offence.
Reviewed 23rd November 2026
What Is a Building Safety Case?
A building safety case is the Accountable Persons' assessment and management of fire and structural risks in an occupied higher-risk building in England, one at least 18 metres or seven storeys tall with at least two residential units. The safety case report summarises it. The Principal Accountable Person prepares it and gives it to the Building Safety Regulator when asked.
Reviewed 23rd November 2026
Building Safety Case Report Example: Structure and Contents
There is no official template or worked example of a building safety case report. The government said in 2023 there would be no set template. The practical model is the Building Safety Regulator's guidance, which expects sections on the building, the people responsible, construction, structure, past works, fire safety, risk assessments, the emergency plan and safety management systems.
Reviewed 23rd November 2026
Accountable Persons and the Golden Thread Explained
An Accountable Person owns or must repair common parts of an occupied higher-risk building in England. The Principal Accountable Person is the one holding or repairing the structure and exterior. The golden thread is the building information they must keep digitally to legal standards. The client starts it during design and construction and hands it over at completion.
Reviewed 23rd November 2026
London and planning
Fire statements at the planning stage, in London and for higher-risk buildings elsewhere in England.
London Plan Policy D12 Explained: D12(A) and D12(B) Fire Statements
Policy D12 is the fire safety policy of the London Plan 2021 for Greater London. Part A says all development proposals must achieve the highest standards of fire safety and meet six criteria. Part B says all major development proposals, whatever their height, should be submitted with a Fire Statement by a third party, suitably qualified assessor.
Reviewed 23rd November 2026
London Plan Policy D5(B5): Evacuation Lifts Explained
London Plan Policy D5(B5) says that in all developments in Greater London where lifts are installed, at least one lift per core should be a suitably sized fire evacuation lift for people who require level access. Capacity assessments may show more are needed. There is no height threshold. Carry-down devices that rely on manual handling are not considered appropriate.
Reviewed 23rd November 2026
Does My Planning Application Need a Fire Statement?
In England, an application needs a Gateway 1 fire statement if it involves a building of 18 metres or more or seven or more storeys with two or more dwellings or educational accommodation. Outline and section 73 applications are exempt. London major development should have a D12(B) Fire Statement, whatever its height. Wales and Scotland have no planning fire statement.
Reviewed 23rd November 2026
Building types
The design guidance written for particular kinds of building.
BB100 Explained: Fire Safety Design for Schools
BB100 is the government design guide for fire safety in schools, published in September 2007 and still the only edition. Approved Document B in England says it should be used for schools. The DfE Technical Manual of January 2026 says it is no longer required on projects using the DfE employer's requirements, which follow the manual's own fire rules instead.
Reviewed 23rd November 2026
HTM 05-02 Explained: Fire Safety in Hospital Design
HTM 05-02 is the Firecode guidance on fire safety in healthcare design, published by NHS England. Its 2015 edition was current in November 2026. It applies in England to new healthcare buildings, extensions, alterations and changes of use. It gives the minimum standards expected to meet Part B of the Building Regulations 2010 and accepts fire engineered alternatives.
Reviewed 23rd November 2026
Data Centre Fire Safety: Building Regulations, Suppression and Planning
Approved Document B does not name data centres and no official source gives them a purpose group. The designer has to decide which purpose group applies and justify it. Where in doubt, the more onerous guidance should be applied. Since 8th January 2026 large data centres in England can also be directed into the NSIP regime.
Reviewed 23rd November 2026
Battery Energy Storage Systems: Fire Safety and Planning
Grid scale battery energy storage sites are approved through planning, not the Building Regulations. Fire and rescue services are not statutory consultees in England or Scotland. Planning practice guidance in England encourages applicants and councils to involve the fire service for systems of 1 MWh or more. NFCC guidance approved in December 2025 sets out what fire services look for.
Reviewed 23rd November 2026
Warehouse Fire Safety: Compartment Size, Sprinklers and Fire Service Access
In England, Approved Document B treats a warehouse as purpose group 7(a), storage and other non-residential. Without sprinklers a single storey compartment can be up to 20,000 square metres and 18 metres high. Beyond the unsprinklered limits a sprinkler system should be provided. The Approved Document has no smoke or roof vent rule for warehouses.
Reviewed 23rd November 2026
Loft Conversion Fire Safety: Escape Routes, Doors and Alarms
In England, Approved Document B Volume 1 paragraph 2.21 says a loft conversion that creates a storey above 4.5 metres should address the full extent of the escape route, with E 20 fire resisting doors and REI 30 partitions. A fire detection and alarm system with mains operated smoke alarms should be fitted. Building regulations approval is required.
Reviewed 23rd November 2026
Fire Upgrades in Listed Buildings Without Losing Historic Fabric
In England, fire safety works that would affect a listed building's special character need listed building consent before they start. Historic England says that can include alarms, emergency lighting and replacement fire doors. Approved Document B says some variation of its provisions may be appropriate in historic buildings, based on the hazard and risk in each case.
Reviewed 23rd November 2026
Wales and Scotland
Where the rules differ from England.
Fire Strategy in Wales: How the Rules Differ From England
Wales makes its own building regulations and Approved Document B, which a fire strategy for a Welsh building should cite. New and converted homes need sprinklers under regulation 37A. Building control must consult the fire safety enforcing authority on full plans applications for Fire Safety Order buildings. Regulation 38 and the 18 metre combustible materials ban have Welsh versions.
Reviewed 23rd November 2026
Higher-Risk Buildings in Wales: The New Regime From 1st July 2026
Since 1st July 2026 higher-risk building work in Wales has needed building control approval from the local authority before it starts, under SI 2025/1321. A Welsh higher-risk building is at least 18 metres high or has at least 7 storeys and contains at least one residential unit, a hospital with overnight beds, a care home or a children's home.
Reviewed 23rd November 2026
Fire Strategy in Scotland: Building Warrants and the Technical Handbooks
In Scotland a fire strategy is used to show the council verifier how a design meets Section 2 (Fire) of the Technical Handbooks before a building warrant is granted. No provision specific to domestic buildings mandates a strategy. A Fire Safety Design Summary must accompany the completion certificate for a new non-domestic building or a conversion to one.
Reviewed 26th November 2026
Scottish Building Standards Section 2: Fire Explained
Section 2 (Fire) is the set of 15 mandatory fire standards, numbered 2.1 to 2.15, in Schedule 5 to the Building (Scotland) Regulations 2004. The Domestic and Non-domestic Technical Handbooks give the guidance on meeting them. The Scottish Government describes Section 2 of the domestic handbook as the Scottish equivalent of Approved Document B in England.
Reviewed 23rd November 2026
Need an answer for your own building?
Send us the drawings and we will tell you what the project needs the same day.
Start your fire strategy
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK