New build, fit out and refurbishment
Office buildings want open plan floors, generous atria and flexible tenancies. The fire strategy makes that possible by setting the risk profile, the travel distances and the compartmentation the building can live with through decades of fit outs.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- BS 9999:2017, Approved Document B Volume 2, BS 5839-1 and BS 5839-8
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
What makes this sector different
What a fire strategy for offices has to answer.
Open plan and long travel
Open floorplates and extended travel distances justified through BS 9999 risk profiles or engineered analysis.
Atria
Smoke control and the use of atria as part of the escape or the firefighting strategy.
Phased evacuation
Tall offices often evacuate in phases, which needs a voice alarm, a firefighting core and a management plan.
Fit out
Every tenant fit out changes the building. The base build strategy has to set the rules the fit outs follow.
Evacuation strategy
How evacuation works in an office building
Low and medium rise offices evacuate simultaneously. Everyone leaves when the alarm sounds and the stairs are sized to take the whole building. Tall offices usually move to phased evacuation. The fire floor and the floor above leave first while the rest of the building is put on alert and then released two floors at a time.
Phased evacuation lets the stairs be narrower and returns lettable floor area. It comes with conditions. The building needs a voice alarm, compartment floors, protected lobbies to the stairs, sprinklers in taller buildings and a fire control point. The strategy has to state those conditions clearly because a tenant fit out that breaks one of them undermines the whole building.
Our approach
How we write a fire strategy for offices.
We produce base build strategies that set out the fit out rules and tenant strategies that show a fit out complies with them. Where the building needs an engineered case, for an atrium or an extended travel distance, we produce it in-house.
Typical deliverables
- Base build fire strategy and plans
- Fit out guide and tenant strategy reviews
- Phased evacuation strategy
- Smoke control design intent for atria
Standards and guidance
Fire safety guidance for offices
- BS 9999:2017
- Assigns each space a risk profile from its occupancy and fire growth rate. The profile sets travel distances, exit widths and fire resistance.
- Approved Document B Volume 2 (official source, opens in a new tab)
- The statutory guidance for non residential buildings and the simplest route for conventional office layouts.
- BS 5839-1 and BS 5839-8
- Cover fire detection and alarm systems and voice alarm systems, which phased evacuation depends on.
- Fire Safety Order 2005 (official source, opens in a new tab)
- Applies to every workplace. In a multi let building the landlord and each tenant are Responsible Persons and have to cooperate.
Common questions
Fire strategy questions on offices, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsIt needs to demonstrate it complies with the base build strategy and the Building Regulations. That is usually a short fit out strategy or an addendum rather than a new document, unless the fit out changes the escape or compartmentation fundamentally.
Guides
Guides for offices.
What we deliver
Services for offices.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreOther sectors
All sectorsFire strategy for offices
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply