Approved Document B is the statutory guidance on meeting the fire safety requirements of the Building Regulations 2010 in England. It is approved under section 6 of the Building Act 1984 and shows one way to comply, not the only way. Volume 1 covers dwellings, including blocks of flats. Volume 2 covers all other buildings.

Last reviewed
Reading time
13 minutes
Related service
Fire Strategy Reports
A white concrete spiral staircase seen from above

What is Approved Document B?

Approved Document B (opens in a new tab) is the government's guidance on meeting the fire safety requirements of the Building Regulations 2010 in England. In its own words, approved documents "are approved by the Secretary of State and give practical guidance on common building situations" about how to meet those requirements. The GOV.UK page says it applies to England and every amendment booklet carries the words "For use in England".

The legal requirements sit in Part B of Schedule 1 to the Building Regulations 2010. Approved Document B reproduces them in a green box at the start of each section and then gives guidance on one way to meet them. In the words of the introduction, each approved document contains legal requirements that you must follow and guidance that you may or may not choose to follow.

Requirement B1 shows the difference. The law is one sentence requiring appropriate provisions for the early warning of fire and appropriate means of escape to a place of safety outside the building. The pages on alarms, escape routes and stairs that follow are guidance on how to achieve it.

Most of our fire strategy reports start from Approved Document B and record where a design follows it and where it departs from it. That record matters because compliance or non-compliance with an approved document can be relied on in legal proceedings, as explained below.

Is Approved Document B law?

It is not law in itself. It is guidance approved under section 6 of the Building Act 1984 (opens in a new tab), which lets the appropriate national authority approve and issue documents giving practical guidance on the requirements of building regulations. A notice under the same section sets the date an approval takes effect and can contain transitional provision.

Section 7 (opens in a new tab) sets out what the approval means in practice. A failure to comply with an approved document "does not of itself render him liable to any civil or criminal proceedings". In proceedings about a contravention of building regulations, though, a failure to comply may be relied upon as tending to establish liability. Proof of compliance may be relied on as tending to negative liability.

The introduction says the approved documents set out what, in ordinary circumstances, may be accepted as one way to comply. Following them does not guarantee compliance. Anyone who prefers another way should seek to agree it with the relevant building control body at an early stage.

Paragraph 0.9 of both volumes sets the test for any alternative. The overall level of safety should not be lower than the approved document provides and it is the responsibility of those undertaking the work to demonstrate compliance. Our guide to fire engineered solutions explains how that case is made.

Volume 1 or Volume 2: which one applies?

Paragraph 0.1 splits the guidance by building type. "Volume 1 deals solely with dwellings, including blocks of flats, while Volume 2 deals with all other types of building covered by the Building Regulations." A house, a loft conversion and a block of flats are Volume 1 work. Offices, shops, schools, care homes and warehouses are Volume 2 work.

Both volumes classify buildings into purpose groups that represent different levels of hazard, set out in Table 0.1. Where it is unclear which purpose group applies, the more onerous guidance should be applied.

Purpose groups in Approved Document B Table 0.1
Purpose groupUseVolume
1(a)FlatVolume 1
1(b)Dwellinghouse with a habitable storey at least 4.5m above ground, up to a maximum of 18mVolume 1
1(c)Dwellinghouse without a habitable storey 4.5m or more above groundVolume 1
2(a) and 2(b)Residential (institutional) and residential (other)Volume 2
3OfficeVolume 2
4Shop and commercialVolume 2
5Assembly and recreationVolume 2
6IndustrialVolume 2
7(a)Storage and other non-residentialVolume 2
7(b)Car parks for light vehicles (maximum 2500kg gross)Volume 2

Mixed use buildings often need both. Volume 1 paragraph 0.18 says Volume 2 should also be consulted. Volume 2 paragraph 0.24 says it could be necessary to use guidance from both volumes, apply other guidance such as HTM 05-02 or Building Bulletin 100 or apply special measures to reduce the risk.

Note 3 to Table 0.1 adds that for very large dwellinghouses (over 18m in height or with a 10m deep basement) or unusual ones, some of the guidance for buildings other than dwellings may be needed.

How B1 to B5 are set out

Part B has five requirements, numbered B1 to B5. Paragraph 0.3 of each volume states the aim of each one and the sections are grouped under them.

Requirements B1 to B5 and their sections
RequirementAim in paragraph 0.3Volume 1 sectionsVolume 2 sections
B1Means of sounding an alarm and means of escape1 Fire detection and alarm systems. 2 Means of escape from dwellinghouses. 3 Means of escape from flats.1 Fire detection and alarm systems. 2 Design for horizontal escape. 3 Design for vertical escape. 4 Small premises. 5 General provisions.
B2Inhibit the spread of fire over internal linings of buildings4 Wall and ceiling linings.6 Wall and ceiling linings.
B3Avoid premature collapse, provide fire separation and suppression where necessary and restrict unseen spread in cavities5 Internal fire spread in dwellinghouses. 6 Loadbearing elements of structure in flats. 7 Compartmentation and sprinklers in flats. 8 Cavities in flats. 9 Protection of openings and firestopping.7 Loadbearing elements of structure. 8 Compartmentation and sprinklers. 9 Cavities. 10 Protection of openings and firestopping. 11 Special provisions for car parks.
B4Restrict fire spread over external walls and roofs and from one building to another10 External walls. 11 Spread from one building to another. 12 Roof coverings.12 External walls. 13 Spread from one building to another. 14 Roof coverings.
B5Access and facilities for the fire service13 Vehicle access. 14 Fire mains and hydrants. 15 Access for firefighting personnel. 16 Venting of heat and smoke from basements.15 Vehicle access. 16 Fire mains and hydrants. 17 Access for firefighting personnel. 18 Venting of heat and smoke from basements.
Regulation 38Provide fire safety information to building owners17 Fire safety information.19 Fire safety information.

The B4 guidance also covers regulation 7(2), the ban on combustible materials in the external walls of certain buildings, which our external walls guide covers.

Both volumes end with appendices A to G, from key terms and methods of measurement to fire doorsets, sprinklers and the standards referred to. Our guide to Regulation 38 covers the final section of each volume.

Paragraph 0.4 says the document should be considered as a whole. Particular attention should be given where one part of the guidance is not fully followed, as this could have a negative effect on other provisions. A longer escape route, for example, can change what the alarm or the smoke control has to achieve.

Other guidance Approved Document B points to

For some buildings, Section 0 of Volume 2 sends the reader to another document.

  • Health care: the Department of Health Firecode guidance should be followed (paragraph 0.10). Our HTM 05-02 guide covers it.
  • Shopping complexes: a suitable approach is given in Annex E of BS 9999 (paragraph 0.12).
  • Assembly buildings: Annex D of BS 9999 (paragraph 0.13).
  • Schools: Building Bulletin 100 should be used (paragraph 0.14). Our BB100 guide covers it.
  • Prisons: the HMPPS fire safety design guide (paragraph 0.15).
  • Atria: Annexes B and C of BS 9999 (paragraph 0.16).

Fire safety engineering is the other recognised route. Volume 1 paragraph 0.12 and Volume 2 paragraph 0.18 say it may be the only practical way to achieve a satisfactory standard of fire safety in some complex buildings, with BS 7974 providing a framework.

Where another code is adopted, paragraph 0.9 says its fire safety recommendations should be followed in their entirety. Our guide to BS 9991, BS 9999 or Approved Document B covers that choice.

Paragraph 0.7 sets a limit on scope. The Building Regulations are intended to ensure a reasonable standard of life safety in a fire and protecting property, including the building itself, often requires additional measures.

For historic buildings, Volume 1 paragraph 0.10 and Volume 2 paragraph 0.17 say some variation of the provisions may be appropriate, assessing the hazard and risk in the particular case. Our guide to fire upgrades in listed buildings covers it.

Amendment history and effective dates

The GOV.UK page for Approved Document B was first published on 7th December 2010 and was last updated on 16th September 2026. Each set of amendments is published first as a booklet with its own date of effect.

The current volumes are the 2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments. They are collated with the 2029 amendments, which are published but do not take effect until 2nd September 2029.

Approved Document B amendments as GOV.UK records them (England)
AmendmentsPublishedTake effectMain changes
2020 amendmentsMay 202026th November 2020Sprinkler trigger height in blocks of flats lowered from 30m to 11m. Floor and flat signage in blocks of flats with storeys over 11m.
2022 amendmentsJune 20221st December 2022Changes for the combustible materials ban. Secure information boxes in blocks of flats with storeys over 11m. Evacuation alert systems in blocks of flats with storeys over 18m.
2025 amendmentsSeptember 20242nd March 2025Regulation 38 and fire safety information. Removal of national classes for reaction to fire and roofs. New provisions for sprinklers in care homes.
2026 amendmentsMarch 2024, updated September 202430th September 2026More than one common stair in blocks of flats with a storey 18m or more in height. Building design provisions to support evacuation lifts in blocks of flats.
2029 amendmentsSeptember 20242nd September 2029A published booklet that is not yet in force. Withdraws the national classes for fire resistance (BS 476 fire tests) by replacing Appendix B and Appendix C (fire doorsets) in both volumes and deleting BS 476 from Appendix F.

GOV.UK says the 2025, 2026 and 2029 amendments flow from one consultation, on sprinklers in care homes, removal of national classes and second staircases in residential buildings, which ran from December 2022 to March 2023. It says withdrawing the national classes ends a long period of dual specification and the European standard, BS EN 13501, remains in place. The 2029 amendments are not part of the 2026 review described below.

Our guides to sprinklers in blocks of flats and second staircases cover two of these changes in detail.

Each booklet has transitional arrangements for work where notice or plans were given before the date of effect. The 2020 amendments let the earlier text apply where work started before 29th January 2021. The 2022 amendments gave a six month window for work to start.

The 2025, 2026 and 2029 amendments use a different test. The earlier text applies where the work has started and is sufficiently progressed before the date of effect or within a set period beginning on that day. That period is six months for the 2025 and 2029 amendments and 18 months for the 2026 amendments.

For a new building, sufficiently progressed means the pouring of concrete for the permanent placement of the trench, pad or raft foundations has started or the permanent placement of piling has started. A project that straddles a date of effect needs its transitional position recorded early in the fire strategy.

The review of Approved Document B

Since April 2023 the Building Safety Regulator (BSR) has had a duty under the Building Safety Act 2022 to keep the safety and standards of all buildings in England under review, including advising government on updates to the approved documents. BSR's continuous review collection (opens in a new tab), published on 22nd December 2025, says it keeps Approved Document B under continuous review.

The Review of Approved Document B (opens in a new tab) is the Building Safety Regulator's consultation, published with MHCLG. It applies to England, opened on 25th March 2026 and closed at 11:59pm on 1st July 2026 after an extension recorded on 9th April 2026. It responds to Grenfell Tower Inquiry Phase 2 recommendation 5, that the statutory guidance generally and Approved Document B in particular be reviewed and a revised version published as soon as possible.

As at 23rd November 2026 the page says the feedback is being analysed and no outcome has been published. None of the following has been adopted. They are proposals only.

  • Consolidated guidance for work on existing buildings
  • An 11m threshold above which Approved Document B could not be used with combustible structural elements (the preferred option)
  • Revised external wall and balcony guidance and a review of the scope of the combustible materials ban
  • Clearer guidance for external balcony approach to flats, removing the only reference to BS 9991
  • A minimum of two stairs and two evacuation lifts in all new residential buildings above 18m
  • Specialised housing replacing the term sheltered housing
  • Roof guidance including solar PV
  • Higher fire resistance for open-sided car parks

Keep these proposals apart from the 2029 amendments in the table above. That booklet was published in September 2024 after an earlier consultation and states its own date of effect of 2nd September 2029. Until a government response is published, designs should follow the published text and its transitional rules.

Mistakes that cost time

Most problems come from how Approved Document B is read rather than from what it says. The official text warns against each of these.

  • Part of the guidance is followed and part is not. Paragraph 0.4 warns this could have a negative effect on other provisions.
  • Guidance written for existing buildings is used on new work. Paragraph 0.9 says such documents often include less onerous provisions and are unlikely to be appropriate for work controlled by the Building Regulations.
  • The design relies on management that will not happen. Paragraph 0.6 says reliance on an unrealistic or unsustainable management regime cannot be considered to have met the requirements.
  • An old copy is used. The booklets say earlier versions need to be read alongside the amendments and the online version should always be checked.
  • A complex building is treated as a common one. The introduction says an approved document may not provide appropriate guidance for very large or very tall buildings or large timber buildings. FAQ 23 says that in tall, large or complex buildings where the structure can contribute fuel to a fire, following Approved Document B may not be sufficient.

Anyone using the approved documents should have sufficient knowledge and skills to understand the guidance and apply it correctly, the introduction adds. Our fire strategy review service checks a strategy against the version that applies to the project.

Wales and Scotland

Wales has its own Approved Document B (opens in a new tab), with revisions approved by Welsh Ministers under the same section 6 power. Volume 1 covers dwellinghouses and Volume 2 covers buildings other than dwellinghouses, which puts flats in the Welsh Volume 2.

The Welsh volumes are the 2006 edition with later amendments. An amendment slip that took effect on 20th December 2025 adds evacuation alert systems at Volume 2 paragraph 18.20 and secure information boxes at paragraphs 18.21 to 18.22. The Welsh Volume 2 still allows a single common stair in some cases at paragraph 3.32. Our guide to fire strategy in Wales covers the differences.

Scotland does not use approved documents. Fire is Section 2 of the Domestic and Non-domestic Technical Handbooks, whose April 2026 editions apply to building warrants submitted on or after 6th April 2026. Our guide to Scottish Section 2 covers the standards.

In every nation the first question is which version of which document applies. Our fire strategy reports record that at the outset. See our Wales and Scotland pages for projects there.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

The requirements in Part B of the Building Regulations are law. Approved Document B is guidance approved under section 6 of the Building Act 1984 on one way to meet them. Under section 7, failing to follow it does not of itself create liability, though compliance or non-compliance can be relied on in proceedings.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.