Skip to content

Hospitals, clinics and primary care

Healthcare buildings hold patients who may be immobile, sedated or dependent on equipment. The strategy is built on progressive horizontal evacuation, sub compartmentation and staff response and has to work alongside the operational needs of a hospital.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
HTM 05-02 Firecode, Approved Document B Volume 2, BS 9999:2017
Signed off by
A Chartered Engineer (CEng)
Scroll

What makes this sector different

What a fire strategy for hospitals and healthcare buildings has to answer.

01

HTM 05-02

Firecode guidance for healthcare premises in England, with its own compartment and sub compartment rules.

02

Progressive horizontal evacuation

Moving patients to an adjoining compartment, which drives compartment sizes and door provision.

03

Live environments

Refurbishment of a working hospital without compromising the strategy for the rest of the building.

04

Gateways

Hospital buildings meeting the height test go through Gateway 2 and Gateway 3.

Evacuation strategy

How evacuation works in a hospital

Hospitals use progressive horizontal evacuation. Each floor is divided into compartments and sub compartments. When a fire is detected patients are moved on their beds or in wheelchairs through fire doors to the next compartment on the same level. They stay in the building, still under care, with a fire resisting barrier between them and the fire.

Vertical evacuation by stairs or evacuation lifts is the last resort. The design therefore concentrates on containing the fire for long enough that it never comes to that. Operating theatres, intensive care and other departments where patients cannot be moved quickly are given additional protection. The strategy also has to keep working through years of refurbishment in a building that never closes.

Our approach

How we write a fire strategy for hospitals and healthcare buildings.

We write healthcare strategies to HTM 05-02 where it applies and to BS 9999 or Approved Document B where it does not and we set out the interface where a scheme straddles both. For refurbishments we produce the interim strategies that keep the live hospital safe during the works.

Typical deliverables

  • Fire strategy report and plans
  • Progressive horizontal evacuation strategy
  • Interim strategies for live refurbishment
  • Gateway submissions where applicable

Standards and guidance

Fire safety guidance for hospitals and healthcare buildings

HTM 05-02 Firecode
The Department of Health guidance on fire safety in the design of healthcare premises. It sets compartment sizes, sub compartment rules and hospital street provisions.
Approved Document B Volume 2 (official source, opens in a new tab)
Recognises HTM 05-02 as the appropriate guidance for hospitals and similar healthcare premises.
BS 9999:2017
Can be used for non clinical buildings on a healthcare estate such as offices and plant.
Building Safety Act 2022 gateways where applicable (official source, opens in a new tab)
Hospitals that meet the height test are higher-risk buildings during design and construction and go through Gateway 2 and Gateway 3.

Common questions

Fire strategy questions on hospitals and healthcare buildings, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

No. Hospitals are excluded from the in-occupation higher-risk regime. A hospital building meeting the height test does go through the Gateway 2 and Gateway 3 process during design and construction.

Guides

Guides for hospitals and healthcare buildings.

Other sectors

All sectors

Fire strategy for hospitals and healthcare buildings

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.