Skip to content

Blocks of flats, new build and existing

Residential buildings carry the most sleeping risk and the most scrutiny. We produce fire strategies for new and existing blocks of flats that settle the evacuation strategy, the compartmentation and the protected routes clearly enough for residents, managers and regulators to rely on.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
BS 9991:2024, Approved Document B Volume 1, Fire Safety Order 2005
Signed off by
A Chartered Engineer (CEng)
Scroll

What makes this sector different

What a fire strategy for blocks of flats has to answer.

01

Stay put or evacuate

The evacuation strategy drives everything else. We set it out, justify it and record the compartmentation and management the building needs to support it.

02

Single stair buildings

Travel distances, lobby arrangements and smoke control for single stair blocks need careful justification, especially with the 2026 second staircase guidance for taller buildings.

03

Flat entrance doors and compartmentation

The fire resistance of every flat as a compartment, the doors onto the common parts and the services that pass through them.

04

Existing stock

Older blocks altered many times often have no usable strategy. A retrospective strategy restores the baseline.

Evacuation strategy

How evacuation works in a block of flats

Most purpose built blocks of flats are designed for stay put. Each flat is a fire resisting compartment. A fire should be contained in the flat where it starts while everyone else remains safely where they are. That only holds if the compartmentation, the flat entrance doors and the smoke control in the common parts are actually in place, which is why the strategy records them rather than assuming them.

Where the compartmentation cannot be relied on, for example in a block with defective external walls or missing fire stopping, the strategy may move to simultaneous evacuation with a common alarm system until the defects are put right. We set out which strategy applies, what it depends on and what would cause it to change.

Our approach

How we write a fire strategy for blocks of flats.

We write residential strategies to BS 9991:2024 or Approved Document B depending on what suits the building and we say which and why. Where a layout departs from the guidance we engineer the justification in-house rather than hope the approver does not notice.

For existing buildings we survey first. The strategy describes the block as it is, including the flat entrance doors, the compartment lines and the state of the protected routes so the fire risk assessment and any remediation programme start from a solid baseline.

Typical deliverables

  • Fire strategy report and plans for every storey
  • Evacuation strategy statement for residents and managers
  • Retrospective strategy and gap analysis for existing blocks
  • Regulation 38 handover pack

Standards and guidance

Fire safety guidance for blocks of flats

BS 9991:2024
The code of practice for fire safety in residential buildings. It sets travel distances, lobby arrangements and smoke control for the common parts.
Approved Document B Volume 1 (official source, opens in a new tab)
The statutory guidance for dwellings, including blocks of flats. Following it is the most common way of showing the Building Regulations are met.
Fire Safety Order 2005 (official source, opens in a new tab)
Applies to the common parts of every block and, since the Fire Safety Act 2021, to the structure, external walls and flat entrance doors.
Fire Safety (England) Regulations 2022 (official source, opens in a new tab)
Add duties for the Responsible Person in multi occupied residential buildings, including fire door checks and fire safety information for residents.

Common questions

Fire strategy questions on blocks of flats, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

It depends on the compartmentation, the fire alarm provision and the condition of the building. A purpose built block with sound compartmentation is usually designed for stay put. Where compartmentation is compromised, a temporary or permanent change to simultaneous evacuation may be needed. The strategy sets this out and justifies it.

Guides

Guides for blocks of flats.

Other sectors

All sectors

Fire strategy for blocks of flats

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.