What are fire strategy drawings?
Fire strategy drawings are plans of a building marked up to show how its fire safety design works. They sit alongside the written fire strategy and show on plan what the report describes in words. A reader should be able to see where people escape, where fire is contained and how firefighters get in and fight a fire. Our fire strategy plans service produces them for new and existing buildings.
The phrase is not a defined legal term. Legislation and Building Safety Regulator guidance speak of plans, floor plans, a building plan and as-built plans. The Department for Education's Technical Manual (opens in a new tab) for schools in England is one official document that does use the words Fire Safety Strategy Drawings.
A set for a typical building would normally show the items below. Most of them match the as-built plan that Approved Document B asks for at handover.
- Escape routes, final exits, protected stairs and lobbies, with travel distances where the guidance limits them
- Compartment walls and floors, fire-separating elements and cavity barriers, with their fire resistance periods
- Fire doorsets and which of them are fitted with self-closing devices
- Detection and alarm, emergency lighting, signage, sprinklers and smoke control
- Fire service access, fire mains, firefighting shafts, hydrants and the secure information box
- High risk areas such as plant rooms
Each sheet should carry a key, a scale, a date and a revision. The drawings should agree with the written strategy on every point. Our fire strategy report example shows where they sit in a full report.
What building control needs to see on the drawings
In England, regulation 12 of the Building Regulations 2010 (opens in a new tab) says that anyone intending to carry out building work to a building that the Regulatory Reform (Fire Safety) Order 2005 applies to, now or after completion, must give an application for building control approval with full plans. Regulation 14 (opens in a new tab) says that where Part B imposes a requirement on the work, four copies of the full plans go with the application instead of two. That rule does not apply where the work relates only to the erection, extension or material alteration of a dwelling-house or flat.
Full plans include any other plans necessary to show that the work would comply with the Regulations. That is where fire strategy drawings earn their place. A general arrangement drawing does not show which walls are compartment walls, which doors are fire doorsets or where the escape routes run.
Building control bodies in England consult the fire and rescue authority on work outside the higher-risk regime under regulation 15A (opens in a new tab), in force since 1st October 2023. Cheshire Fire and Rescue Service (opens in a new tab), for example, asks for a legible set of scaled current plans that clearly show the fire safety arrangements, with elevations and site plans showing fire service access. Our guide to what building control looks for covers the rest of the process.
Drawings for a Gateway 2 application
For higher-risk building work in England the Building Safety Regulator (BSR) is the building control authority. Regulation 4 of the Higher-Risk Buildings Procedures Regulations 2023 (opens in a new tab), in force since 1st October 2023, says an application must be accompanied by a site plan to a scale of not less than 1:1250. The application must also include such other plans as are necessary to show that the work would comply with all applicable requirements of the building regulations, along with a fire and emergency file and other documents.
Schedule 1 (opens in a new tab) says the fire and emergency file must include a plan setting out the fire and rescue service's requirements for access to the building and water supply for firefighting. That plan depends on talking to the fire service early.
BSR's application guidance (opens in a new tab) says the fire and emergency file is often known as a fire strategy. It must include plans showing how the work complies with the regulations on means of escape and warning, fire spread inside and outside the building and access and facilities for the fire service. A fire compliance statement for category B work to an existing higher-risk building must provide plans under the same four headings. The guidance also asks applicants to do the following.
- Upload only the drawings and plans that describe the project, explain the scope of the work and show how it complies
- Clearly label them and upload a reference file listing each file with a clear description of what it is
- Refer to the drawings throughout the application and in the compliance statement, directing BSR to the relevant parts
BSR's page on getting building control applications right (opens in a new tab) says it was not uncommon under the previous system for applicants to attach hundreds of pages of plans and drawings without any context. It says that approach is no longer acceptable for higher-risk buildings. In an analysis of a selection of rejected applications, which the page does not date, 73 percent of new build applications and 89 percent of applications for existing buildings did not contain sufficient detail. Our guide to the Gateway 2 fire strategy covers the rest of the file.
As-built plans at handover
When the work is finished, Regulation 38 (opens in a new tab) requires fire safety information to be given to the Responsible Person. In England, Approved Document B Volume 2 (opens in a new tab) Section 19 and Volume 1 Section 17 list an as-built plan as essential information. The plan should show the following.
- Escape routes, including exit capacity for each storey and for the building
- Fire resisting construction and fire-separating elements, including cavity barriers in walk-in spaces
- Fire doorsets, fire doorsets fitted with a self-closing device and other doors relevant to the fire safety strategy
- Fire detector heads, manual call points, alarm equipment, fire safety signage, emergency lighting, extinguishers, fire mains and hydrants outside the building
- Sprinkler systems with their isolating valves and control equipment, plus any smoke control systems
- High risk areas, any power supplies or power generating installations and the location of secure information boxes
For complex buildings the records should also include plans of the building as built. A design stage set that already uses these headings converts to an as-built set with little rework. The as-built version should record what was built, including changes agreed during construction, rather than what was drawn at tender.
Our guide to Regulation 38 covers the rest of the handover pack. Our Regulation 38 fire safety information service compiles and checks it.
Floor plans and the building plan for high-rise residential buildings
The Fire Safety (England) Regulations 2022 (opens in a new tab) put a separate plan duty on the Responsible Person for high-rise residential buildings. They came into force on 23rd January 2023 and apply in England only. A high-rise residential building is one containing two or more sets of domestic premises that is at least 18 metres above ground level or has at least seven storeys.
Regulation 6 requires a plan for each floor. Together the floor plans must identify the location of all lifts and the key fire-fighting equipment in the whole building. They must also show whether each lift is for use by firefighters or is an evacuation lift. Key fire-fighting equipment includes the inlets and outlets of dry and wet rising mains, smoke control systems and suppression systems.
Where two or more floors would be the same in all material respects, one plan may cover them if it clearly shows which floors it relates to. The Responsible Person must also prepare a single-page building plan identifying 15 listed items. They include the environs, use, dimensions and storeys of the building, access for fire appliances, rising main inlets, sprinkler shut-off controls, the secure information box, smoke control and evacuation alert controls and the main stairways.
A hard copy of the plans must be placed in the secure information box. Under regulation 11 (opens in a new tab) they must also be given to the local fire and rescue authority by electronic means. The plans must be updated as soon as reasonably practicable after any change to the layout or to the location of key fire-fighting equipment.
The Home Office fact sheet on regulation 6 (opens in a new tab), last updated on 24th July 2023, says it is information about the Regulations rather than guidance. It says the plans should be simple, to assist quick and critical decisions by firefighters during an incident. They should also be a reasonably accurate reflection of each floor.
The duty sits with the Responsible Person and cannot be delegated. The Home Office guidance on the Regulations (opens in a new tab) says the Responsible Person will normally need to engage others, such as contractors, to help. For a block of flats it names the freeholder, the managing agent or a residents' management company as typical Responsible Persons.
For an existing block with no drawings at all, these plans may be the first record of its fire safety measures. Our guide to retrospective fire strategies covers that situation.
Secure information boxes and wayfinding signs
Regulation 4 (opens in a new tab) requires the Responsible Person for a high-rise residential building in England to install and maintain a secure information box. It must be readily accessible to the fire and rescue authority, reasonably secure from unauthorised access and vandalism and inspected at least annually. It holds the Responsible Person's contact details, details of others permitted to access the building and the documents the Regulations require. Since 6th April 2026 it must also be capable of holding the documents required by the Fire Safety (Residential Evacuation Plans) (England) Regulations 2025.
For new buildings, Approved Document B Volume 1 (opens in a new tab) paragraphs 15.18 to 15.21 say blocks of flats with a top storey more than 11 metres above ground level should be provided with a secure information box. It should be sized for the information needed, easily located, secure but readily accessible to firefighters and protected from the weather. This guidance was added by the 2022 amendments and points to sections 2 to 4 of the Fire Industry Association code for best practice.
Paragraphs 15.13 to 15.16, added by the 2020 amendments, recommend floor identification and flat indicator signs in the same blocks and set their lettering and mounting height. Regulation 8 (opens in a new tab) of the 2022 Regulations requires high-rise residential buildings to contain clear floor and flat identification markings designed and located in line with that guidance. The Home Office says buildings designed after November 2020 should already have this signage for compliance with the Building Regulations. Drawings for a new block should show the box and the sign positions so they are built in rather than added later.
Symbols, colours and the layout fire services expect
No official requirement for particular symbols or line colours on design stage fire strategy drawings was published on GOV.UK or legislation.gov.uk when this guide was reviewed in November 2026. The only fixed scale in the sources above is the 1:1250 minimum for the Gateway 2 site plan. The most detailed conventions come from plans prepared for the fire service.
The Home Office fact sheet points to the Fire Industry Association and National Fire Chiefs Council code of practice for premises information boxes (opens in a new tab) for example plans. The details below come from Version 1 of that code, dated December 2020. The Fire Industry Association published a revised edition on 14th April 2026, which this guide has not reviewed. Check it before drawing to these details.
- Plans at A3 size, encapsulated or in plastic wallets, with two sets of all plans
- Content restricted to what firefighters need, since unnecessary and unclear information could delay the response
- An orientation plan, approximately to scale, showing the building in relation to surrounding buildings, roads and water supplies
- Lines of fire resisting compartmentation marked with distinctive line marking or colour, shown in red in the code
- A clear key on the left-hand side of every plan, using only symbols relevant to the premises
Where a feature has no symbol in the code, Version 1 suggests a suitable standard symbol with reference to BS EN ISO 7010 or BS 5499-10. BSI's catalogue lists BS 1635:1990 as a current standard giving recommendations for graphic symbols and abbreviations for fire protection drawings. Neither Approved Document B nor Version 1 of the code cites it.
Local fire services add their own preferences. Essex County Fire and Rescue Service (opens in a new tab) asks for plans sized to fit A3, printed in colour where necessary and laminated, with at least two copies of each plan in the box. It would also prefer a separate plan for each floor so flat numbers can be identified, even though the law allows one plan for identical floors.
Dorset and Wiltshire Fire and Rescue Service (opens in a new tab) requires a separate plan for each floor regardless of layout and a key whenever plans are annotated with symbols. These are local practice rather than law. Check with the service for the building's area before drawing.
Mistakes that cost time
Most problems with fire strategy drawings are problems of explanation rather than drafting. These are the ones that come up most often.
- Attaching drawings without saying what they show, which BSR says is no longer acceptable for higher-risk buildings
- Burying key information in technical documents with no signposting from the strategy or the compliance statement
- Drawings and text that disagree on a door rating, a compartment line or an escape route
- Sheets with no key, scale, date or revision, which leave nobody sure whether they are current
- Putting design detail on plans meant for firefighters, which the FIA and NFCC code warns could delay the response
- Using one plan for identical floors where the local fire service wants a plan per floor
- Not updating the regulation 6 plans after a layout change or after equipment moves
- Leaving the fire service access and water supply plan out of a Gateway 2 fire and emergency file
BSR offers a simple test. If a colleague can follow the logic of a submission without needing to sift through dense technical drawings, it is likely on the right track. The same test works for any set of fire strategy drawings.
Wales and Scotland
The Fire Safety (England) Regulations 2022 apply in England only. Their floor plan, building plan and secure information box duties do not reach Welsh buildings. Wales covers some of the same ground in its guidance for new work. The Welsh Government's amendment slip (opens in a new tab) to its own Approved Document B was published on 19th June 2025 and took effect on 20th December 2025.
The slip adds guidance on floor identification and flat indicator signs and on secure information boxes to the Welsh Volume 2 for blocks of flats with a top storey more than 11 metres above ground level. The Welsh Volume 2 also lists an as-built plan in its Appendix G on fire safety information. Our Wales page covers projects there.
Scotland takes a different approach. Clause 2.14.10 of the April 2026 domestic Technical Handbook (opens in a new tab), new from 6th April 2026, says an external premises information plate should be fitted to all new and converted high rise domestic buildings. It also applies to existing ones where work to common areas or the envelope is subject to the Section 2 standards. The plate shows the address, the number of storeys, hydrant and dry riser positions and information on lifts and escape stairs.
Clause 2.14.9 of the same handbook covers storey identification and dwelling indicator signs in domestic buildings with a storey at a height of more than 18 metres. Our Scotland page covers work under the Scottish system. If you need a set drawn or checked, our fire strategy plans service works from your current general arrangement drawings.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Fire Safety (England) Regulations 2022, regulation 6 (official source, opens in a new tab)
- Fire Safety (England) Regulations 2022, regulation 4 (official source, opens in a new tab)
- Home Office, Fact sheet: floor plans and building plan (regulation 6) (official source, opens in a new tab)
- Home Office, Check your fire safety responsibilities under the Fire Safety (England) Regulations 2022 (official source, opens in a new tab)
- Approved Document B Volume 1 (2026 online version) (official source, opens in a new tab)
- Approved Document B Volume 2 (2026 online version) (official source, opens in a new tab)
- Building Regulations 2010, regulation 14 (official source, opens in a new tab)
- Higher-Risk Buildings Procedures Regulations 2023, regulation 4 (official source, opens in a new tab)
- Higher-Risk Buildings Procedures Regulations 2023, Schedule 1 (official source, opens in a new tab)
- Building Safety Regulator, Preparing information for a building control approval application (official source, opens in a new tab)
- Building Safety Regulator, Getting building control applications right (official source, opens in a new tab)
- FIA and NFCC, Code of Practice for the Provision of Premises Information Boxes in Residential Buildings (Version 1) (official source, opens in a new tab)
- Welsh Government, Amendment slip: amendments to Approved Document B volumes 1 and 2 (official source, opens in a new tab)
- Scottish Government, Building Standards Technical Handbook April 2026: Domestic (official source, opens in a new tab)