The documents side by side
Seven documents cover fire safety over a building's life in England. They have different legal bases, authors and audiences. Most of them draw on the same design thinking. The table sets them out and the sections below hand off to the detailed guides.
| Document | Legal basis | Who writes it | Who receives it | Stage | Buildings in scope | Nation |
|---|---|---|---|---|---|---|
| Fire strategy | None by name. It is the usual way to show Part B compliance and it feeds Regulation 38 handover | The designer or fire engineer. No profession is named in law. Designers must be competent under regulation 11F | The building control body, which consults the fire service on Fire Safety Order buildings | Design, then handover | Any building. Usual for Fire Safety Order buildings and complex schemes | Used across the UK. The legal hooks differ by nation |
| Gateway 1 fire statement | Development Management Procedure Order 2015, article 9A, from 1st August 2021 | The applicant. A suitably qualified engineer is recommended | The local planning authority, with the Building Safety Regulator as statutory consultee | Planning application | 18 metres or 7 storeys with two or more dwellings or educational accommodation | England |
| London Plan D12(A) and D12(B) statements | London Plan 2021 Policy D12, which is planning policy | For D12(B), a third party independent, suitably qualified assessor | The borough planning department, which the plan says could be assisted by borough building control or the London Fire Brigade | Planning application | D12(A) all development proposals. D12(B) major development | Greater London |
| Fire and emergency file or fire compliance statement | Higher-Risk Buildings Procedures Regulations 2023, regulations 4 and 12 and Schedule 1 | The client's design team, submitted by the client as applicant | The Building Safety Regulator, after consulting the fire authority for 15 working days | Gateway 2, before building work starts | Higher-risk buildings: 18 metres or 7 storeys with at least 2 residential units, a hospital or a care home | England, with a separate Welsh regime from 1st July 2026 |
| Regulation 38 fire safety information | Building Regulations 2010, regulation 38 | The person carrying out the work | The Responsible Person, who acknowledges it. Building control is usually told within 5 days | By completion or by occupation if earlier | Fire Safety Order buildings: erection, extension or a relevant change of use | England and Wales, in separate versions |
| Fire risk assessment | Regulatory Reform (Fire Safety) Order 2005, article 9 | The Responsible Person, with help from a competent person if needed | Article 9 sets no approval or submission step. The Responsible Person keeps the record | Occupation, reviewed regularly | Non-domestic premises and the common parts of blocks of flats | England and Wales. Scotland uses Part 3 of the Fire (Scotland) Act 2005 |
| Safety case report | Building Safety Act 2022, section 85, from 16th January 2024 | The Principal Accountable Person | The Building Safety Regulator, which is notified when it is prepared or revised and gets a copy when it asks. Residents receive a summary | Occupation | Occupied higher-risk buildings: 18 metres or 7 storeys with at least 2 residential units | England, with a Welsh equivalent enacted but not yet in force |
The fire strategy is the only one of the seven with no statutory basis by name. In practice the others draw on it. The planning statements summarise its principles, the fire and emergency file is often known by its name and the Regulation 38 pack hands it over. Our fire strategy reports service writes the strategy that the other documents build on.
The fire strategy
No law in England defines a fire strategy. The government's Grenfell Tower Inquiry progress report (opens in a new tab), updated on 2nd October 2026, says a fire safety strategy is not a required document to be submitted as part of an application. It adds that the higher-risk regime does already require extensive information on fire safety.
It is still the usual way to make the Part B case. Buildings the Fire Safety Order covers need a full plans application and building control consults the fire service, whose consultation pro forma gives a fire strategy as the first example of supplied information. Building control approves the building work, not the strategy as a document.
No profession is named as author. In England regulation 11F of the Building Regulations requires anyone carrying out design work to have the skills, knowledge, experience and behaviours needed. Inquiry Recommendation 10 would require a registered fire engineer to produce the strategy for higher-risk buildings at Gateways 2 and 3. The government listed it as In progress on 2nd October 2026. Our guides to what a fire strategy is and whether you need one go further.
Planning fire statements: Gateway 1 and Policy D12
The Gateway 1 fire statement is required by article 9A of the Development Management Procedure Order 2015 (opens in a new tab) for planning applications made on or after 1st August 2021. It applies in England to relevant buildings of 18 metres or more or 7 or more storeys that contain two or more dwellings or educational accommodation. It is a statement about the fire safety design principles, concepts and standards applied, made on a form published by the Secretary of State.
The form guidance (opens in a new tab) recommends a suitably qualified engineer with relevant experience in fire safety or a suitably qualified and competent professional. The local planning authority receives the statement and consults the Building Safety Regulator, which replaced HSE as statutory consultee on 27th January 2026. The authority decides what weight to give the Regulator's advice. Our guide to the Gateway 1 fire statement covers the form.
It is not a building control document. Planning practice guidance (opens in a new tab) says the statement should not contain the breadth and depth of fire safety information submitted at building control stage and that planning authorities will not be responsible for building regulation matters.
In Greater London the London Plan 2021 (opens in a new tab) adds Policy D12, which is planning policy, not regulation. D12(A) says all development proposals must achieve the highest standards of fire safety. D12(B) says all major development proposals should be submitted with a Fire Statement, described as an independent fire strategy produced by a third party, suitably qualified assessor.
Major development means 10 or more dwellings or a residential site of 0.5 hectares. For other uses it means 1,000 square metres or a 1 hectare site. There is no height threshold. A tall London residential scheme can need both the national form and a D12(B) statement. Our guide to London Plan Policy D12 covers the London requirements and our planning fire statements service prepares both.
The Gateway 2 fire and emergency file
For higher-risk buildings in England the design fire case becomes a statutory document. The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 (opens in a new tab), in force since 1st October 2023, require a fire and emergency file with the building control application for a new higher-risk building and for category A work to an existing one. The Building Safety Regulator's guidance (opens in a new tab) says the file is often known as a fire strategy.
For category B work that might affect the spread of fire, the Regulator asks for a fire compliance statement instead and says it may also be known as a fire strategy for the work. The client submits the application. The Regulator consults the fire authority with plans that must include the fire and emergency file and waits 15 working days before deciding. It must decide within 12 weeks for a new higher-risk building or 8 weeks for work to an existing one.
The Regulator's guidance describes plans showing means of escape and warning, measures to inhibit fire spread inside and outside the building and access and facilities for the fire service. The file should also show how the owner will manage and maintain the building so it can be evacuated in an emergency. Before construction starts, the golden thread for the building must include a copy of the planning fire statement. Our guide to the Gateway 2 fire strategy covers the file in detail and our guide to Gateway 3 covers completion.
Regulation 38 fire safety information
Regulation 38 (opens in a new tab) of the Building Regulations 2010 makes the person carrying out the work give fire safety information to the Responsible Person by completion or by occupation if earlier. It applies to erecting or extending a building the Fire Safety Order applies to and to work connected with a relevant change of use, where Part B imposes a requirement.
In England the Responsible Person acknowledges receipt and the person carrying out the work usually notifies building control within 5 days. Building control must be satisfied on Regulation 38 before it gives a completion certificate. Approved Document B says that where a fire safety strategy has been prepared it should be made available to the relevant dutyholder.
Higher-risk buildings in England use a different handover, in which the client gives the fire safety information and golden thread information to the Accountable Person and the Responsible Person. Our guide to Regulation 38 sets out what the pack should contain.
Fire risk assessment
The fire risk assessment is the duty for occupied premises. Article 9 of the Fire Safety Order (opens in a new tab) requires the Responsible Person to make a suitable and sufficient assessment of the risks to relevant persons in order to identify the general fire precautions needed. The assessment must be reviewed regularly and recorded. The Order extends to England and Wales.
The Responsible Person is the employer, the person in control of the premises or the owner. GOV.UK says that anyone without the expertise or time to do the assessment needs to appoint a competent person to help, such as a professional risk assessor. Article 9 contains no requirement to submit the assessment for approval.
In a block of flats the Order covers the structure, the external walls, the common parts and the flat entrance doors. That scope has applied since 16th May 2022 in England and 1st October 2021 in Wales. Approved Document B links the two documents by saying the Regulation 38 information should let the Responsible Person carry out an effective fire risk assessment. Our guide to fire strategy and fire risk assessment explains how each uses the other.
High-rise residential buildings in England carry extra duties under the Fire Safety (England) Regulations 2022 (opens in a new tab), in force since 23rd January 2023. For buildings of at least 18 metres or 7 storeys with two or more sets of domestic premises, the Responsible Person must provide a secure information box, an external wall record, floor plans and a single-page building plan. Fire door checks apply in blocks of flats above 11 metres.
The building safety case and safety case report
The safety case report belongs to occupation, not design. Section 85 of the Building Safety Act 2022 (opens in a new tab), in force since 16th January 2024, requires the Principal Accountable Person to prepare it as soon as reasonably practicable. It contains the assessments of building safety risks and a brief description of any steps taken under section 84. It applies to occupied higher-risk buildings in England of at least 18 metres or 7 storeys with at least 2 residential units.
The Principal Accountable Person is usually an organisation and accountable persons cannot delegate the legal duty. It must notify the Building Safety Regulator after preparing or revising the report and give a copy when asked. Residents receive a summary of it. Hospitals and care homes are in the Gateway 2 test but are not registered or covered in occupation.
The report is supported by the wider safety case, which holds the detailed building information and the assessments of risks and measures. The Regulator warns not to assume the fire risk assessment will be all that is needed to meet the duty under section 83. Where the Accountable Person is not also the Responsible Person, the government's guidance (opens in a new tab) says building safety information must be shared across the roles.
Our guide to the building safety case explains the duties in full. Our building safety case reports service prepares the report itself.
Which documents a project needs
Two hypothetical projects show how the documents stack up. Take a four storey office building outside London. It needs a full plans application with a fire strategy that shows Part B compliance, fire service consultation through building control, Regulation 38 information at completion and a fire risk assessment once occupied. No planning fire statement, Gateway 2 file or safety case applies.
Now take a twenty storey block of flats in a London borough with more than 10 dwellings. At planning it needs a Gateway 1 fire statement and a D12(B) Fire Statement, with D12(A) applying as well. Building control approval comes from the Building Safety Regulator on a fire and emergency file before work starts, followed by Gateway 3 at completion. In occupation it needs registration, a safety case report, a fire risk assessment and the records the Fire Safety (England) Regulations 2022 require.
The mistakes that cost time usually come from using one document for another document's job:
- A planning fire statement is not building control evidence. Planning authorities are not responsible for building regulation matters.
- A fire risk assessment does not meet the safety case duty on its own. The Regulator says to demonstrate, rather than just list, the measures in place.
- Excerpts copied from Approved Document B do not make a D12 statement. A GLA draft guidance sheet, which was never adopted, said excerpts without specific context and references to the development do not demonstrate compliance with the policy.
- Listing standards is not enough at Gateway 2. The Regulator says the application must explain their relevance and how they have been applied to the design.
- Strategies go missing at handover. In audits of 15 London developments in the first quarter of 2020, London Fire Brigade recorded a 50 percent failure rate, core by core, on whether the Responsible Person had a copy of the fire strategy. The figure comes from its quarterly fire engineering reports for January 2020 to March 2021, a series that stopped after March 2021.
Wales and Scotland
Wales uses several of the same documents under its own law. A fire strategy supports the full plans application for Fire Safety Order buildings and the fire authority is consulted under regulation 15B from 1st July 2026. Regulation 38 applies in its Welsh version and the fire risk assessment duty under the Fire Safety Order applies as in England.
There is no planning fire statement in Wales. Fire and rescue authorities have instead been statutory planning consultees on listed application types validated on or after 25th April 2022. Higher-risk buildings have needed a fire and emergency file since 1st July 2026 under the Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 (opens in a new tab), approved by the local authority. Safety case reports are enacted in Wales under section 37 of the Building Safety (Wales) Act 2026 but not yet in force. They would go to the local authority rather than the Building Safety Regulator. Our guide to higher-risk buildings in Wales covers the regime.
Scotland has different documents. There is no planning fire statement. The Building Safety Act gateways and safety case reports do not apply there because section 169 of the Act says it extends to England and Wales only, with listed exceptions. The statutory design document is the Fire Safety Design Summary, which the Procedural Handbook (opens in a new tab) says has been required with the completion certificate for a new non-domestic building since October 2013. In occupation a fire safety risk assessment is required under Part 3 of the Fire (Scotland) Act 2005. Our guide to fire strategy in Scotland covers building warrants.
If you are not sure which documents your project needs, send us the drawings and the stage you have reached. Our fire strategy reports team prepares the strategy and the planning, Gateway and handover documents that draw on it.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Grenfell Tower Inquiry: government progress report, September 2026, the construction industry (official source, opens in a new tab)
- Town and Country Planning (Development Management Procedure) (England) Order 2015, article 9A (official source, opens in a new tab)
- Fire statement form: guidance (official source, opens in a new tab)
- Fire safety and high-rise residential buildings from 1st August 2021 (planning practice guidance) (official source, opens in a new tab)
- The London Plan 2021, Policy D12 (official source, opens in a new tab)
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, Schedule 1 (official source, opens in a new tab)
- Preparing information for a building control approval application (Building Safety Regulator) (official source, opens in a new tab)
- Building Regulations 2010, regulation 38 (official source, opens in a new tab)
- Regulatory Reform (Fire Safety) Order 2005, article 9 (official source, opens in a new tab)
- Fire Safety (England) Regulations 2022, regulation 6 (official source, opens in a new tab)
- Building Safety Act 2022, section 85 (official source, opens in a new tab)
- Safety in high-rise residential buildings: accountable persons (GOV.UK) (official source, opens in a new tab)
- Building (Higher-Risk Buildings Procedures) (Wales) Regulations 2025 (official source, opens in a new tab)
- Building Standards Procedural Handbook, third edition (Scottish Government) (official source, opens in a new tab)