What is a retrospective fire strategy?
A retrospective fire strategy is a fire strategy written for a building that is already built and in use. It is prepared where no strategy was ever produced or where the original has been lost or no longer matches the building. It records how the building as it stands protects people from fire and the management it depends on. Our retrospective fire strategy service is built for buildings with no strategy or a lost one.
The term is not a legal one and no statute or official guidance defines it. No law requires an existing building to have a fire strategy. The law imposes duties to assess and manage fire risk, to keep and pass on fire safety information and, for higher-risk buildings in England, to hold and obtain prescribed building information. A retrospective strategy is one practical way of meeting those duties rather than a document the law names.
Many existing buildings have no strategy to find. Fire safety in purpose-built blocks of flats (opens in a new tab), a 2011 guide hosted on GOV.UK, says at paragraph 87.4 that for most existing blocks of flats it is unlikely that the fire safety design information usually held in a fire safety strategy will have been documented. Its cover note says it should be viewed as no longer comprehensive and that the Home Office intended to publish a revised version in 2024. The page still carried the 2011 guide when it was last updated on 2nd December 2024.
Which duties does it help you meet?
None of the duties below names a fire strategy. Each asks for information that a well prepared strategy holds in one place. One document can therefore serve several of them.
| Duty | Where it comes from | Who it falls on | Where it applies |
|---|---|---|---|
| Make, record in full and review a suitable and sufficient fire risk assessment | Fire Safety Order 2005, article 9 | Responsible Person | England and Wales |
| Record the fire safety arrangements | Fire Safety Order 2005, article 11 | Responsible Person | England and Wales |
| Pass relevant fire safety information to a new Responsible Person and keep records of it | Fire Safety Order 2005, article 22A | Outgoing and incoming Responsible Persons | England and Wales |
| Keep prescribed information and obtain missing information except where it is not practicable | Building Safety Act 2022, section 88 | Each Accountable Person | Higher-risk buildings in England |
| Give key building information to BSR | SI 2023/396 | Principal Accountable Person | Higher-risk buildings in England |
| Explain in the safety case report how the fire safety standards are known | BSR guidance on the safety case report | Principal Accountable Person | Higher-risk buildings in England |
| Prepare floor plans, a building plan and an external wall record for the fire service | Fire Safety (England) Regulations 2022 | Responsible Person | England, 18 metres or seven storeys |
Regulation 38 of the Building Regulations 2010 is the handover duty for new work such as an erection, an extension or a relevant change of use. It does not reach back to buildings where no such work has been done. Approved Document B (opens in a new tab) says its aim is achieved when the person responsible has the information to understand and implement the fire safety strategy, maintain the fire safety systems and carry out an effective fire risk assessment. A retrospective strategy fills the same gap where that handover never happened.
The penalties attach to the underlying duties. Under article 32 of the Fire Safety Order (opens in a new tab), failing to comply with articles 8 to 22B is an offence where the failure places one or more relevant persons at risk of death or serious injury in case of fire. On indictment the penalty is a fine, imprisonment for up to two years or both.
When do you need one?
Because no law requires one, there is no legal trigger. A retrospective strategy is worth commissioning when one of the duties above cannot be met from the records you hold. The common situations are these.
- The fire risk assessor cannot establish the original design intent or the standard the building was built to
- A higher-risk building in England needs key building information, golden thread records or a safety case report and the design information is missing
- Building work, a refurbishment or a change of use is planned and there is no baseline to measure it against
- A new Responsible Person or Accountable Person takes over and the outgoing one has little to pass on
- The building relies on a fire engineered design that nobody can now explain
- The evacuation strategy in use may differ from the one the building was designed for
Not every building needs a full document. The 2011 flats guide says at paragraph 87.6 that a record of the fire safety arrangements can often take the form of a simple plan showing the fire safety measures. Such plans are rarely likely to be warranted for low-rise blocks. In many blocks no specific record is needed if the fire risk assessment details the measures sufficiently. For planned work, see our guides to keeping a fire strategy up to date and fire strategy for a change of use.
What the fire risk assessor needs
Article 9 of the Fire Safety Order (opens in a new tab) requires the Responsible Person to make a suitable and sufficient assessment of the risks to relevant persons in order to identify the general fire precautions needed. It must be reviewed regularly and in particular where there is reason to suspect it is no longer valid or there has been a significant change. Since 1st October 2023 the record must include the findings, the measures taken or to be taken and any group identified as especially at risk.
Articles 13, 14 and 17 ask whether escape routes, detection and alarms are adequate for the premises and whether the building and its equipment are maintained. Each judgement is easier when the assessor knows what the building was designed to do. The 2011 flats guide says at paragraph 23.7 that with older blocks it can be difficult to discern the original design intent and the standard achieved, especially for compartmentation.
The duty stays with the Responsible Person. The Home Office guidance on section 156 (opens in a new tab) of the Building Safety Act 2022, last updated on 25th October 2023, says the Responsible Person has a duty to make sure a suitable and sufficient assessment is completed and should record the name of any fire risk assessor they employ. Since 1st October 2023 the Responsible Person must also record the fire safety arrangements under article 11.
Section 156(4) (opens in a new tab) of the Act will insert a new article 9A, which will stop a Responsible Person appointing anyone to help make or review the assessment unless that person is competent. That subsection is not yet in force and the same Home Office guidance says it will be brought into force at a later date. Our guide to fire strategy and fire risk assessment explains how each document uses the other.
Original standards or today's standards?
An existing building is not normally judged as if it were new. The 2011 flats guide says at paragraph 23.8 that it is essential to try to determine the benchmark standards that applied when the block was built and how far they are from what is considered acceptable today. At paragraph 52.2 it says "it is normally inappropriate to retrospectively upgrade existing blocks to meet current benchmarks without justification on the basis of fire risk."
Those lines date from 2011. The principle of proportion appears in current guidance too. MHCLG's 2026 guidance on external wall appraisals says the assessor should only recommend work that is proportionate to the level of risk.
For higher-risk buildings, BSR's guide to managing safety risks (opens in a new tab) says accountable persons should try to find and keep a record of the relevant safety standards in place when the building was built and after any later refurbishments. BSR's safety case report guidance asks the report to state how the building's fire safety standards are known. Its examples are knowing the standards the building was built to, inferring them from build date, height and type of building or knowing the building used a fire-engineered solution agreed with a fire engineer.
A retrospective strategy should make that reasoning visible. It sets out the benchmark the building was built to, how that was established and how the building compares with it today. It then records where the building falls short of current guidance, with the gaps prioritised by risk rather than presented as a list of upgrades.
What a retrospective strategy covers
No official template for a retrospective strategy was published on GOV.UK when this guide was reviewed in November 2026. The content below follows the information that the fire risk assessment, the golden thread and the key building information regime ask for.
- The records found and the steps taken to find missing ones
- The building's use, height, storeys, basements and any change of principal use since construction
- The benchmark standard the building was built to and how it was established
- Escape routes, stairs and the evacuation strategy in place, with any change from the original design intent
- Compartmentation, fire doors and fire stopping as surveyed, with anything that could not be inspected
- Detection, alarm, emergency lighting, smoke control, suppression and firefighting facilities
- The external wall construction and any appraisal of it
- The management assumptions the building depends on
- A prioritised gap analysis against current guidance
- Annotated plans showing the fire safety measures
Records come first. The most useful are usually the original drawings, building control approvals, operation and maintenance manuals, previous fire risk assessments and remediation records. For higher-risk buildings, BSR says accountable persons must keep a record of the steps taken to find missing information and can use it to show BSR what they have done. That record is worth keeping for any building.
Records are rarely enough on their own. In practice compartmentation is often hidden above ceilings and in risers. A survey of the building as it stands confirms what the records say and finds what they miss. Our guide to fire strategy drawings explains the annotated plans that often result.
Higher-risk buildings: registration, key building information and the golden thread
In occupation, a higher-risk building is one in England that is at least 18 metres high or has at least seven storeys and contains at least two residential units (Building Safety Act 2022, section 65 (opens in a new tab)). Occupying an unregistered higher-risk building has been an offence under section 77 since 1st October 2023. Registration (opens in a new tab) costs £251 per building. Key building information is due within 28 days of the registration application.
The Higher-Risk Buildings (Key Building Information etc.) (England) Regulations 2023 (opens in a new tab), in force since 6th April 2023, ask for details of the structure, external walls, staircases and evacuation strategy and a list of the fire and smoke control equipment with where it is located. BSR's key building information guide (opens in a new tab) says you should take all reasonable steps to find the information. It may come from the most recent fire risk assessment, an external wall system appraisal or existing maintenance and inspection records. BSR says you should not need to do a full separate survey.
Section 88 (opens in a new tab) of the Act, in force since 16th January 2024, requires each Accountable Person to keep prescribed information to prescribed standards and to keep it up to date so far as possible. Where an Accountable Person does not hold prescribed information or a copy of a prescribed document, they must obtain it except where it is not practicable to do so. The prescribed information in Schedule 1 of SI 2024/41 (opens in a new tab) includes any design code or standard applied, any description of the design intent and the evacuation strategy.
BSR's golden thread guidance (opens in a new tab) says accountable persons must be able to understand the fire strategy for the parts of the building they are responsible for. A retrospective strategy gives them that where none existed. Our guide to accountable persons and the golden thread covers these duties in full.
The same information feeds the safety case. BSR's safety case report guidance (opens in a new tab) says that if you have not found all the information you need, the report should explain what you did to try to find it. Where the current evacuation strategy differs from the original design intent, each change and its reason should be explained. BSR also warns accountable persons not to assume the fire risk assessment will be all they need to meet the section 83 duty to assess building safety risks, which our guide to the building safety case explains.
External walls and PAS 9980
MHCLG's guidance on understanding fire risk appraisals of external walls (opens in a new tab) (FRAEWs) applies to existing buildings in England and was last updated on 18th November 2026. It says the Fire Safety Act 2021 makes clear that a fire risk assessment must include the structure and external walls, including cladding, insulation, balconies and windows. An FRAEW is a detailed assessment of the risk of fire spreading through the external wall system. It should be carried out by a suitably qualified specialist using the PAS 9980:2026 methodology.
PAS 9980:2026 replaces PAS 9980:2022. MHCLG says the update does not significantly change how risk is assessed and that an FRAEW carried out by a competent assessor using the 2022 method should continue to be valid until it needs to be reviewed or updated.
An FRAEW is usually needed when the fire risk assessor identifies concerns about the external wall, for example combustible materials or a wall construction that is not fully understood. One may be needed for blocks of flats of any height. Buildings with traditional brick or masonry walls are generally unlikely to need a detailed FRAEW, though the construction still has to be confirmed as masonry rather than, for example, brick slip over combustible insulation.
An FRAEW considers only fire risk from external walls. It does not assess fire safety throughout the building, check compliance with building regulations or replace the fire risk assessment. A retrospective strategy should place the external wall findings in the context of the whole building. Our guide to external walls and the combustible materials ban covers the rules for new work.
Wales and Scotland
The Fire Safety Order extends to England and Wales only. Articles 8, 9, 11, 17, 18 and 22A apply in Wales, which means the fire risk assessment and record keeping duties above apply there too. Article 22B, on co-operation with accountable persons, was inserted except in relation to Wales. The Building Safety Act higher-risk building duties, the key building information and golden thread regulations, the Fire Safety (England) Regulations 2022 and the MHCLG external wall guidance apply to England only.
The Building Safety (Wales) Act 2026 sets a Welsh safety regime for occupied buildings with two or more residential units, with most duties commencing by order. Registration covers buildings of at least 11 metres or five storeys and further duties such as safety case reports apply at 18 metres or seven storeys. It also amends the Fire Safety Order in ways that legislation.gov.uk lists as yet to be applied. Our Wales page covers work there.
In Scotland the Fire Safety Order does not apply. Fire safety in existing non-domestic premises falls under Part 3 of the Fire (Scotland) Act 2005 and the Fire Safety (Scotland) Regulations 2006. Section 78 (opens in a new tab) excludes domestic premises, including common stairs and passages used by the occupants of more than one dwelling. Our Scotland page has more.
Whatever the nation, the work starts with the records you hold and a visit to the building. Our retrospective fire strategy service can tell you what is missing and what it will take to fill the gap.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Regulatory Reform (Fire Safety) Order 2005, article 9 (official source, opens in a new tab)
- Regulatory Reform (Fire Safety) Order 2005, article 22A (official source, opens in a new tab)
- Building Safety Act 2022, section 88 (official source, opens in a new tab)
- Building Safety Act 2022, section 156 (official source, opens in a new tab)
- Higher-Risk Buildings (Keeping and Provision of Information etc.) (England) Regulations 2024, Schedule 1 (official source, opens in a new tab)
- Home Office, Fire safety responsibilities under section 156 of the Building Safety Act 2022 (official source, opens in a new tab)
- Fire safety in purpose-built blocks of flats (2011 guide) (official source, opens in a new tab)
- Building Safety Regulator, Applying to register a high-rise residential building (official source, opens in a new tab)
- Building Safety Regulator, Giving us structure and safety information (key building information) (official source, opens in a new tab)
- Building Safety Regulator, Keeping information about a higher-risk building: the golden thread (official source, opens in a new tab)
- Building Safety Regulator, Managing safety risks in high-rise residential buildings: a detailed guide (official source, opens in a new tab)
- Building Safety Regulator, Preparing a safety case report (official source, opens in a new tab)
- MHCLG, Understanding fire risk appraisals of external walls in blocks of flats (official source, opens in a new tab)