Independent second opinion, UK wide
A fire strategy is only as good as the thinking behind it. We review strategies written by others, for developers who inherit one, approvers who have to accept one, purchasers and insurers who have to rely on one and design teams who want to know the case will hold before it is submitted.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Approved Document B, BS 7974, Building Safety Act 2022
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
Overview
What is a fire strategy review?
An independent check that the case holds
A review tests an existing fire strategy against the guidance it claims to follow, the building it describes and the way the building is actually going to be used. It finds the gaps between the three. Most strategies fail not because the engineering is wrong but because the building changed, the assumptions were never written down or the document was written for a different code.
We review at any stage: a planning stage strategy before Gateway 2, a technical design strategy before submission, an inherited strategy on a site acquisition or an as-built strategy that has outlived several refurbishments.
Standards and legislation
- Approved Document B, BS 9999, BS 9991
- We check the strategy against the code it adopts and the edition in force at the time.
- BS 7974
- Where the strategy relies on an engineered case we test the method, the inputs and the sensitivity.
- Building Safety Act 2022
- For higher-risk buildings we test readiness for the Building Safety Regulator's scrutiny.
- Fire Safety Order 2005
- We check the management assumptions are ones the Responsible Person can actually deliver.
Who
Who needs a fire strategy review
When a second opinion pays for itself
Before a Gateway 2 submission
A pre submission review catches the inconsistencies that generate requests for information and refusals.
On acquisition
Purchasers and funders inheriting a strategy with a site or a building need to know what they are relying on.
Design change
The architect has changed the layout since the strategy was written and nobody has checked whether it still works.
Insurer or approver query
A building control body, fire and rescue service or insurer has raised a question the original author cannot or will not answer.
Dispute or claim
An independent, defensible view of whether the strategy met the standard of the day.
Checks
What a fire strategy review checks
The strategy, the building and the gap between them
- 01Does the strategy adopt a coherent route to compliance and stick to it
- 02Do the travel distances, exit widths and compartmentation match the current drawings
- 03Are the engineered justifications sound and sensitivity tested
- 04Are the management assumptions realistic for the Responsible Person
- 05Is the evacuation strategy right for the occupants, including those who need help
- 06Are firefighting provisions consistent with the fire and rescue service expectation
- 07Is the document ready for the approver who will read it
Our process
How the work runs.
- 01
Document review
We read the strategy, the drawings it refers to and any approver correspondence.
- 02
Site check
Where the building exists we check the key provisions on site.
- 03
Findings
We issue a review report setting out each finding, its significance and the recommended action.
- 04
Resolution
We help close the gaps, whether by agreeing changes with the author, revising the strategy or engaging the approver.
What you get
- A review report with findings ranked by significance
- A marked up copy of the strategy and plans
- A recommended action list with owners
- Where needed, a revised strategy or an addendum
- Sheet
- FS-10
- Fee
- Fixed, agreed first
Why us
Engineered in-house, not subcontracted.
Independent
We do not install, manufacture or supply fire safety products and we have no stake in the original author's conclusions.
In-house engineering
Engineered cases are reviewed by an engineer who can rerun the analysis, not just read it.
Constructive
A review that tells you how to fix it, not just what is wrong.
UK wide
Any strategy, any building, anywhere in the UK.
Need fire strategy review for a project?
Send us the drawings and we will tell you what the project needs the same day.
Common questions
Fire strategy review: your questions, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsIf you want us to. Often the most efficient route is for the original author to address the findings. Where that is not possible we can revise the strategy or issue an addendum and where the strategy is beyond saving we can produce a new one.
Fire strategy review by sector
All sectorsGuides
Guides on this topic.
Keep reading
Related services

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read moreStart your fire strategy review
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply