Wales makes its own building regulations and Approved Document B, which a fire strategy for a Welsh building should cite. New and converted homes need sprinklers under regulation 37A. Building control must consult the fire safety enforcing authority on full plans applications for Fire Safety Order buildings. Regulation 38 and the 18 metre combustible materials ban have Welsh versions.

Last reviewed
Reading time
13 minutes
Related service
Fire Strategy Reports
The Pierhead building and Cardiff Bay

Who makes the rules in Wales and who checks them?

Building regulations for Wales are made by the Welsh Ministers. Functions under the Building Act 1984 were transferred to them in relation to Wales by SI 2009/3019 (opens in a new tab), in force from 31st December 2011. The Welsh Ministers also publish the Approved Documents for Wales.

The Building Regulations 2010 still apply in Wales but are amended for Wales separately. Several regulations, including regulations 7 and 38, now have a separate Wales version on legislation.gov.uk. A Welsh building needs the Welsh guidance, paragraph numbers and procedures, which is how our fire strategy reports for Welsh projects are written.

Building control in Wales is carried out by local authorities or by private businesses registered as building control approvers. The Welsh Government (opens in a new tab) says only local authorities can oversee new higher-risk building work. The Building Safety Regulator regulates registered building inspectors and registered building control approvers in Wales on behalf of the Welsh Ministers. It does not regulate local authority building control or oversee building work in Wales.

The register of building control approvers for Wales (opens in a new tab) is separate from the register for England. It shows the type of work each approver is registered to do.

The main Welsh fire safety rules for building work at 23rd November 2026
RuleWhere it sitsIn force
Approved Document B for Wales, two volumesGuidance approved by the Welsh Ministers under section 6 of the Building Act 1984Volume 1 text from 31st December 2020, amendment slip from 20th December 2025
Sprinklers in new and converted homesRegulation 37A30th April 2014 for care homes and certain rooms for residential purposes, 1st January 2016 for houses and flats
Fire service consultation on full plans applicationsRegulation 15B1st July 2026, with a 15 day period from 20th July 2026
Fire safety information at handoverRegulation 38, Wales versionHandover paragraphs substituted from 1st July 2026
Combustible materials ban at 18 metresRegulation 7(2), Wales version13th January 2020, extended on 20th December 2025
Metal composite material ban at any heightRegulation 7(1A), Wales version20th December 2025
Higher-risk building proceduresSI 2025/13211st July 2026

From 1st July 2026 SI 2025/1320 added dutyholder and competence duties for the client, principal designer and principal contractor on building work generally in Wales. It replaced the deposit of plans with applications for building control approval. The Welsh Government's transitional guidance (opens in a new tab) says approval now lapses automatically after 3 years if the work has not reached commencement.

Higher-risk buildings in Wales have their own procedures from the same date, with the council as the building control authority. Our guide to higher-risk buildings in Wales covers that regime.

Approved Document B in Wales

The Welsh Government publishes Approved Document B: fire safety (opens in a new tab) in two volumes, for dwellinghouses and for buildings other than dwellinghouses. The page says readers must also refer to the amendments and lists four amendment slips. The latest applies from 20th December 2025.

The cover of Volume 1 (opens in a new tab) describes a 2006 edition incorporating the 2010, 2016 and 2020 amendments, for use in Wales. It took effect on 31st December 2020 and gives practical guidance on Schedule 1 and regulations 7 and 37A of the Building Regulations 2010 for Wales. Volume 2 (opens in a new tab) is also a 2006 edition, incorporating amendments from 2010, 2013, 2016, 2017 and 2020.

England's Approved Document B is a different and later base document with different paragraph numbers and section titles. Citing English paragraphs for a Welsh building gives the reviewer the wrong references and invites queries. Our guide to Approved Document B explains the English volumes.

The Volume 1 file on the Welsh Government page was re-issued in August 2026, yet its text is still the 2020 text without the December 2025 changes. The December 2025 amendment slip therefore has to be read alongside both volumes.

The volumes are guidance on ways to meet the requirements, which sit in the Building Regulations 2010 as they apply in Wales. A design can depart from the guidance where a fire engineered case shows the requirements are still met, which is the work of our fire engineering service.

What the December 2025 amendment slip changed

The amendment slip (opens in a new tab) records that the Welsh Ministers approved the revisions under section 6 of the Building Act 1984. The amendments took effect on 20th December 2025. These are the main changes.

  • A ban on relevant metal composite material in external walls and specified attachments at any height, explained in new paragraphs in Volume 1 Section 9 and Volume 2 Section 13.
  • Volume 2 Section 13 on the construction of external walls replaced in full, with a new Table 13.1 on the reaction to fire of external surfaces.
  • Insulation and filler materials of class A2-s1, d0 or better for residential purpose groups 1 and 2 with a storey of 11 metres or more, with new balcony guidance for residential buildings at the same height.
  • Floor wayfinding signs in blocks of flats with a top storey more than 11 metres above ground level, with floor identification text at least 50mm high and floor numerals at least 75mm high, mounted 1.7m to 2m above floor level.
  • Secure information boxes in blocks of flats with a top storey more than 11 metres above ground level.
  • Evacuation alert systems in accordance with BS 8629 in blocks of flats (purpose group 1(a)) with a top storey over 18 metres above ground level.

The amendments do not apply where a building notice, an initial notice or full plans went to a local authority before 20th December 2025 and the work started before that day or within the six months beginning with it. Check those dates and state in the strategy which version of the guidance the design follows.

The Building (Amendment) (Wales) Regulations 2025 (opens in a new tab) behind the slip came into force on the same day. They also cut from 15 metres to 11 metres the height at which a material change of use of a whole building triggers requirement B4(1) on external fire spread.

Sprinklers in new and converted homes

Regulation 37A (opens in a new tab) applies where building work is the erection or material change of use of a building in relation to care homes, care homes for children, rooms for residential purposes and dwelling-houses and flats. Rooms in hotels, hospitals, prisons, young offender institutions and hostels providing temporary accommodation to people ordinarily resident elsewhere are outside the rooms for residential purposes limb. Such a building must be provided with an automatic fire suppression system installed and operating in accordance with regulation 37B.

Part 7A was inserted by SI 2013/2730. Its explanatory note says the requirements apply to care homes and certain rooms for residential purposes from 30th April 2014 and to dwellings from 1st January 2016. Care homes for children were added from 17th December 2024. Because change of use is caught as well as new build, a hypothetical conversion of an office building into flats would bring in the duty.

Listed buildings, buildings in conservation areas and scheduled monuments are exempt where installing a system would unacceptably alter their character or appearance. Temporary buildings with a planned time of use of two years or less are also exempt.

Older documents often trace the duty to the Domestic Fire Safety (Wales) Measure 2011. That Measure was repealed on 10th September 2025 by the Legislation (Procedure, Publication and Repeals) (Wales) Act 2025 (opens in a new tab). The duty now rests on regulation 37A alone. A strategy or specification that still cites the Measure as current law should be corrected.

Section 2 of Welsh Volume 1 refers to an appropriate technical standard such as BS 9251:2014 or an equivalent. It adds that suppression can sometimes be used as a compensatory feature where the provisions of the Approved Document are varied. England's rule is in our guide to sprinklers in new blocks of flats.

Fire service consultation under regulation 15B

Since 1st July 2026 the duty to consult on building regulations applications in Wales has sat in regulation 15B (opens in a new tab). It applies to a full plans application for building control approval where it is proposed to erect, extend, materially alter or change the use of a building to which the Fire Safety Order applies or will apply after the work.

The building control authority must consult the enforcing authority before determining the application. It must not grant approval until 15 days have passed from the date of consultation, unless the enforcing authority has given its views sooner. There is no duty where the building control authority is itself the enforcing authority.

The period was 15 working days when regulation 15B came in. W.S.I. 2026/112 (opens in a new tab), made on 14th July 2026 and in force from 20th July 2026, removed the word working from regulation 15B(4) and regulation 38(2C) among other corrections of minor and technical errors. The consultation period is now 15 days.

Regulation 15B replaced article 45 of the Fire Safety Order (opens in a new tab), which was omitted in England on 1st October 2023 and in Wales on 1st July 2026. The Welsh Government's building regulations and fire safety procedural guidance (opens in a new tab), first published on 21st July 2020, predates regulation 15B and still refers to article 45.

Mid and West Wales Fire and Rescue Service (opens in a new tab) says it responds within the 15-day statutory requirement. Clear plans of escape routes, compartmentation and fire service access help it do so.

Regulation 38 in Wales

Regulation 38 (opens in a new tab) applies in Wales in its own Wales version. Its handover paragraphs were substituted from 1st July 2026 by SI 2025/1320. It covers the erection or extension of a building the Fire Safety Order applies to or will apply to and a relevant change of use, where Part B imposes a requirement.

The person carrying out the work must give fire safety information to the responsible person. Where the building is unoccupied during the work the deadline is completion or occupation, whichever is earlier. Otherwise it is completion. The responsible person must give a notice acknowledging receipt and confirming the information is sufficient to enable them to understand, operate and maintain the building.

The person carrying out the work must then notify the building control authority that the information was given and the acknowledgement received. If no acknowledgement arrives, the notice states the steps taken to get it. The notice is due within 30 days where self-certification under regulation 20 applies and within 5 days in other cases, which were working days until 20th July 2026. The Wales version has no third-party certification paragraphs of the kind England has in regulation 38(2D) to (2G).

Welsh Volume 2 paragraph 0.12 says a more detailed record of the fire safety strategy will be necessary for larger buildings and points to Appendix G. Appendix G predates the 2026 changes and does not mention the acknowledgement notice. Our Regulation 38 fire safety information service prepares packs to the Welsh version and our guide to what Regulation 38 requires covers what goes in them.

The Fire Safety Order extends to England and Wales but the Fire Safety (England) Regulations 2022 apply in England only. The occupation duties in the Building Safety (Wales) Act 2026 were not in force at 23rd November 2026.

The combustible materials ban in Wales

Regulation 7(2) (opens in a new tab) as it applies in Wales requires materials that become part of an external wall or specified attachment of a relevant building to be of European Classification A2-s1, d0 or A1, classified to BS EN 13501-1:2018. A relevant building has a storey at least 18 metres above ground level and contains one or more dwellings, an institution or a room for residential purposes. Roof-top plant areas and plant room storeys are not counted. Height is measured from the lowest ground level adjoining the outside of the building to the top of the floor surface of the storey.

The ban has applied in Wales since 13th January 2020, inserted by SI 2019/1499 with differences from the English text. From 20th December 2025 it also covers rooms in hotels, hostels and boarding houses. The amendment slip's note to paragraph 13.16 says the buildings caught include student accommodation, care homes, sheltered housing, hospitals and boarding school dormitories.

The December 2025 changes added exemptions for fibre optic cables and some solar shading components. They also exempted the top floor layer of a balcony of class A1fl or A2fl-s1 where the whole layer has an imperforate substrate under it. The exemption for insulation and waterproofing below ground level now extends to materials up to 300mm above that level.

Separately, regulation 7(1A) has banned relevant metal composite material in the external walls and specified attachments of any building since 20th December 2025, whatever its height. The slip defines it as a panel or sheet no more than 10mm thick with two or more metal layers and a substantial layer with a gross calorific value over 35MJ/kg.

Our guide to the combustible materials ban explains the ban in England and the wider rules on external walls.

Is there a planning fire statement in Wales?

The planning fire statement created by article 9A of England's development management procedure order applies in England only. The Development Procedure (Consultees) (Wales) (Miscellaneous Amendments) Order 2021 (opens in a new tab) instead made fire and rescue authorities statutory consultees on planning applications in Wales. Its fire and rescue authority provisions came into force on 24th January 2022 and the council's duty to consult does not apply to applications made before 25th April 2022.

Fire and rescue authorities are consultees on applications for development of these kinds.

  • 10 or more dwellinghouses or a site of 0.5 hectares or more
  • 1,000 square metres or more of floor space
  • A site of 1 hectare or more
  • 10 or more flats
  • Residential accommodation of 10 or more rooms
  • 10 or more rooms in a house in multiple occupation
  • Waste development

Fire and rescue authorities are also pre-application consultees for major development. A Welsh Government letter of 1st November 2021 (opens in a new tab) says their responses focus on access for appropriate numbers and types of fire appliance and on an adequate supply of water for firefighting.

A short note on appliance access and water supply from the emerging fire strategy answers both points. Our guide on whether a planning application needs a fire statement covers the rules in England.

Mistakes that cost time on Welsh projects

These follow from the differences set out above.

  • Citing England's Approved Document B, its paragraph numbers or its section titles for a Welsh building.
  • Working from the re-issued Volume 1 file without the December 2025 amendment slip.
  • Leaving sprinklers out of a new or converted house or flat.
  • Citing the repealed Domestic Fire Safety (Wales) Measure 2011 as the source of the sprinkler duty.
  • Assuming England's planning fire statement applies in Wales.
  • Quoting working days or England's third-party certification paragraphs for Regulation 38 notices in Wales.
  • Citing article 45 of the Fire Safety Order for fire service consultation after 1st July 2026, when the duty sits in regulation 15B.
  • Appointing a registered building control approver for higher-risk building work, which only the local authority can oversee.

Scotland is different again. It uses building warrants and its own Technical Handbooks rather than Approved Document B, as our guide to fire strategy in Scotland explains. Our Wales page covers projects across Wales.

If you have drawings for a Welsh building, our fire strategy report service writes the strategy to the Welsh guidance and the regulations as they apply in Wales. We quote a fixed fee once we have seen the drawings. Where an existing strategy cites England's rules, a fire strategy review shows what needs to change before it goes to building control.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

They are different documents. Wales publishes its own Approved Document B in two volumes, built on a 2006 base with amendments up to 2020 and an amendment slip from 20th December 2025. England's document is a later text with different paragraph numbers.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.