Does the combustible materials ban apply to structural timber?
It does wherever the timber forms part of the external wall of a relevant building. Regulation 7(2) (opens in a new tab) requires materials which become part of an external wall or specified attachment of a relevant building to be of European Classification A2-s1, d0 or A1. In England a relevant building has a storey at least 18 metres above ground level and contains dwellings, an institution or a room for residential purposes.
Timber is a material for this purpose. The 2018 regulations FAQ (opens in a new tab) notes that Approved Document 7 defines materials to include naturally occurring materials such as stone, timber and thatch. The external wall also includes anything located within any space forming part of the wall. The same FAQ says internal plasterboard and sheathing boards are included in the definition of an external wall.
The government put it plainly in 2022. Its response to the review of the ban (opens in a new tab) says combustible materials, including timber, have been banned in and on the external walls of new high-rise blocks of flats more than 18 metres in height and of hospitals, care premises and student accommodation meeting that height. A CLT or timber frame external wall in a relevant building is therefore caught by the ban.
The ban is about external walls and specified attachments. Timber elsewhere in the structure is governed by the functional requirements of Part B and by the guidance discussed below. The full scope of the ban, its exemptions and the 11 metre guidance are in our guide to external walls and the combustible materials ban. Our fire engineering team works on the timber questions the guidance does not settle.
What the government has said about mass timber
The 2022 response is the clearest official statement on structural timber in tall buildings. It says the case for exempting structural timber from the ban in the highest risk buildings had been made by some respondents. It also says the government is not yet satisfied that the case is strong enough to justify an exemption at this time. The department had commissioned research on the issue and on how modern methods of construction would inform the development of building regulations.
Below 18 metres the response is supportive. It says the approach will allow the continued use of structural timber in the external walls of residential buildings below 18 metres, if these materials are used safely in accordance with the Building Regulations. It says the government is committed, through the England Tree Action Plan, to increase the use of timber in construction and is working across government to identify opportunities for the safe growth of timber use in low-rise buildings.
Consultation responses had pushed in both directions. A large number considered that any ban should not hinder innovation in the use of cross laminated timber and similar engineered timber structural products. There was strong concern that an 11 metre trigger height would affect traditional timber framed buildings.
The Timber in Construction Roadmap 2025 (opens in a new tab), a Defra policy paper updated on 3rd March 2025, states the risk directly. It says timber is combustible and can contribute to fire spread with impacts on structural stability that can inhibit evacuation and fire response. It adds that smouldering combustion and the potential delamination of engineered mass timber can make fires less predictable. It expects the benefits of timber to be seen in low-rise buildings, with some opportunity in mid-rise construction where safety and durability are properly accounted for.
Approved Document B and large timber buildings
Approved Document B Volume 2 says approved documents may not provide appropriate guidance if the case is unusual. Its examples of non-standard conditions include very large or very tall buildings, large timber buildings and some buildings that incorporate modern construction methods. It also warns that simply following the guidance does not guarantee that the building work will comply with the legal requirements.
FAQ 23 on the Approved Document B frequently asked questions (opens in a new tab) page, published by MHCLG and the Building Safety Regulator, deals with combustible structures. It says tall, large or complex buildings where the structure can contribute as a source of fuel during a fire are not common building situations. Following the guidance, including the minimum fire resistance periods and the standard test methods, may not be sufficient to meet the requirements of the building regulations. That applies particularly where the consequences of fire spread and fire induced structural failure are more significant.
The FAQ says the designer should consider the type of construction alongside factors such as height, size and use of the building. Alternative methods are likely to require a detailed, evidence-based understanding of fire performance for the specific design. That understanding has to show how each building regulation requirement will be addressed directly. Designers should discuss and agree the design intent and the necessary evidence with the building control body before starting building work.
In practice that is a fire engineered solution with its own evidence base. Leaving that conversation until after the structural system is fixed risks redesign. The FAQ also reminds everyone responsible for building work, including the owner, designers, builders and installers, that the functional requirements must be met.
Structural fire resistance for timber elements
Approved Document B's structural recommendations apply whatever the material. Volume 2 paragraph 7.1 says elements of structure such as frames, beams, columns, loadbearing walls and floor structures should have, as a minimum, the fire resistance given in Appendix B, Table B1. Paragraph 7.2a points to the Appendix B provisions that make sure a supporting element has no less fire resistance than the element it supports. The minimum periods are set out in Table B2.
| Building | Height of top floor | Minimum period |
|---|---|---|
| Block of flats with sprinklers | Up to 18 metres | 60 minutes |
| Block of flats with sprinklers | Up to 30 metres | 90 minutes |
| Block of flats with sprinklers | More than 30 metres | 120 minutes |
| Dwellinghouse | Up to 5 metres | 30 minutes |
| Dwellinghouse | Up to 11 metres and up to 18 metres | 60 minutes, with a minimum of 30 minutes for a three storey dwellinghouse |
Note 2 to the table says blocks of flats with a top storey more than 11 metres above ground should be fitted with a sprinkler system. The periods are minimums under standard tests. The BSR research described below found that standard tests cannot account for smouldering and later reignition.
Another Approved Document B FAQ, added on 14th March 2024, covers fire exposure. Some parts of a building, such as internal floors within multi-level flats, load-bearing walls internal to a flat or parts of external load-bearing walls above openings, may see fire exposures not covered by single sided standard testing. Designers should apply the most credible individual provisions for R, E, I and type of exposure.
Cavities and cavity barriers in timber construction
Timber frame and panelised construction create many concealed spaces. Approved Document B Volume 2 paragraph 9.1 says cavities provide a ready route for the spread of smoke and flame, which can present a greater danger as any spread is concealed. A cavity is any concealed space. Paragraph 9.2 says cavity barriers should be provided to divide cavities and to close their edges. Paragraph 9.3 lists locations including the junction between an external cavity wall and every compartment floor and compartment wall.
For buildings other than dwellings, Table 9.1 sets a maximum undivided cavity of 20 metres in any direction. It falls to 10 metres between a roof and ceiling where the exposed surface is worse than class C-s3, d2. The relaxation for cavities behind cladding with a masonry or concrete inner leaf applies only in a building not put to residential or institutional use and only where the cavity does not contain materials of class B-s3, d2 or worse.
Volume 1 paragraph 5.20 says cavity barriers should provide 30 minutes' integrity (E 30) and 15 minutes' insulation (I 15). Paragraph 5.21 allows barriers in a stud wall or around openings to be formed of timber at least 38mm thick, among other materials. It notes these do not necessarily achieve that performance. Paragraph 5.23 says cavity barriers should be fixed so their performance is unlikely to be made ineffective by movement such as shrinkage or, during a fire, by failure of their fixings. That matters in timber, which moves as it dries.
Volume 2 paragraph 8.16 allows timber beams, joists, purlins and rafters to be built into or carried through a masonry or concrete compartment wall if the openings are as small as practicable and fire-stopped. The BSR structural fire resistance research recommends that the correct specification and installation of cavity barriers should be widely disseminated, along with the impact of gaps and discontinuities. Our guide to compartmentation and fire stopping covers barriers and fire stopping in more depth.
What the Building Safety Regulator's research found
On 22nd December 2025 the Building Safety Regulator published two research reports that bear on timber. They are research reports, not changes to the guidance. Fire safety: Structural fire resistance (opens in a new tab) was carried out by BRE Global, Design Fire Consultants, Buro Happold and the University of Edinburgh. GOV.UK says its findings and recommendations do not represent government policy. It ran five large-scale fire experiments, including panellised cross laminated timber walls and floors and a timber frame, both under 18 metres with 60 minutes' fire resistance.
The report (opens in a new tab) says the 60 minute CLT compartment survived complete burn out of the moveable fire load while maintaining overall stability. Some hours after the experiment ended, localised smouldering led to reignition of the CLT in places. The smouldering continued over several days, with damage extending to three wall panels and through to the roof panel.
Its conclusion is that surviving burn out does not guarantee there will be no reignition later. The report says smouldering combustion and potential reignition cannot be accounted for in standard fire resistance tests. It also recommends considering mandatory checks of life-safety critical aspects of construction, such as the correct installation of cavity barriers.
The second report, on timber cladding (opens in a new tab), was prompted by the Samuel Garside House fire in Barking on 9th June 2019. It found that slatted timber cladding gives a greater external fire spread hazard than flat or lapped timber cladding. It recommends that footnote 3 to Table 12.1, which accepts timber cladding at least 9mm thick, should be removed. It also observes that general material reaction to fire classifications do not exist outside EU Committee decisions, although industry and even building control bodies can assume they do.
The proposed 11 metre threshold for combustible structure
The Building Safety Regulator's consultation Review of Approved Document B: Fire safety (opens in a new tab), published with MHCLG, covered England and ran from 25th March 2026 to 1st July 2026. It proposed a threshold above which the guidance in Approved Document B should not be applied when combustible elements of structure are used. The threshold proposed is 11 metres. BSR plans to bring FAQ 23 into the guidance and state a clear 11 metre threshold for both residential and non-residential buildings.
Two options were offered. Option 1, the preferred option, is 11 metres for all buildings. Option 2 is 11 metres for residential buildings and 18 metres for non-residential buildings. The consultation says the new threshold still allows timber above 11 metres by ensuring a full fire engineered approach is taken. It also says BSR continues to support the use of timber in both residential and non-residential low-rise buildings.
The proposed Volume 2 text (opens in a new tab) includes a draft paragraph 7.i. It says that in buildings with a storey more than 11 metres above ground, loadbearing elements of structure should be constructed using materials or products achieving a minimum classification of A2-s3, d2 or better. Draft paragraph 7.ii says that in other buildings loadbearing elements below A2-s3, d2 should not be exposed. The exceptions are single storey industrial buildings and buildings with occupied storeys up to 4.5 metres, where the exposed area is no more than 50 percent of the room's floor area and no more than 20 square metres.
These are proposals and not law. The September 2026 Grenfell progress report says more than 500 responses were received and recommendations are expected by March 2027. A timber scheme above 11 metres starting design now should plan on the basis that a full fire engineered approach may be needed.
Insurers, lenders and competence
Building regulations are not the only test. The Timber in Construction Roadmap says new developments involving mass timber need to engage with insurers, lenders and warranty providers as early as possible. It notes the Mass Timber Insurance Playbook and says insurer and warranty provider concerns go beyond the life-safety objectives considered in the Building Regulations.
The roadmap's priority theme 5 commits government and industry to work with academia and the Building Safety Regulator on outstanding safety, durability and competency questions for engineered mass timber over the next five years. Its actions include supporting the Fire Safety Hub web platform, sharing best practice from demonstrator projects that meet the functional building regulations and exploring the feasibility of a risk register of anonymised mass timber data by 2028. It also calls for better timber competency among fire risk assessors, fire engineers, building control officers and insurance, warranty and lending professionals.
The roadmap gives a sense of scale. Only 9 percent of English new build homes were timber framed in 2019, against 92 percent in Scotland.
Timber buildings in Wales and Scotland
Wales has its own regulation 7(2) with the same A2-s1, d0 or A1 requirement for the external walls of relevant buildings with a storey at least 18 metres above ground. It has applied there since 13th January 2020, with hotels, hostels and boarding houses added from 20th December 2025. Structural timber in the external wall of such a building is caught in Wales as it is in England.
Scotland takes a different approach. Its ban applies from 11 metres but covers the external wall cladding system, not the load-bearing structure. Clause 2.7.1 of the Non-domestic Technical Handbook (opens in a new tab) says external wall cladding systems "mean non load-bearing components attached to the buildings structure", with examples including timber panels and weather boarding. It says sheathing or backing board "attached to and forming part of the elements of structure of the building are not considered to form part of the external wall cladding system". It adds that "where combustible sheathing or backing board is proposed in any building with a storey 11 m or more above the ground, a large scale facade fire test should be carried out". That applies whether or not the board contributes to the structural performance of the building.
Clause 2.0.7 on alternative approaches deals with engineered timber directly. Where the elements of structure are engineered timber, including cross laminated timber, the structure should maintain stability during the fire growth and fully developed post flashover phases without reliance on intervention from the fire and rescue services. Encapsulation of combustible elements of structure may require to be provided. Where encapsulation is not provided or does not protect against ignition and charring for the duration of the fire, the structural fire engineer should consider the extra fire load from the exposed timber and assess stability against both delamination and failure of fixings at elevated temperatures.
For a timber scheme in any of the three nations, our fire engineering service can set out the evidence building control will need. Contact us early, before the structural system is fixed.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Building Regulations 2010, regulation 7 (official source, opens in a new tab)
- Building Regulations 2010, regulation 2 (official source, opens in a new tab)
- Building (Amendment) Regulations 2018: Frequently Asked Questions (official source, opens in a new tab)
- Government Response: Review of the Ban on the Use of Combustible Materials (official source, opens in a new tab)
- Approved Document B Fire Safety: Frequently Asked Questions (official source, opens in a new tab)
- Approved Document B Volume 2: Buildings Other Than Dwellings (official source, opens in a new tab)
- Approved Document B Volume 1: Dwellings (official source, opens in a new tab)
- Timber in Construction Roadmap 2025 (official source, opens in a new tab)
- Fire Safety: Structural Fire Resistance (Building Safety Regulator) (official source, opens in a new tab)
- Fire Safety: Fire Hazards of Timber Cladding, Summary and Recommendations (official source, opens in a new tab)
- Review of Approved Document B: Fire Safety (consultation) (official source, opens in a new tab)
- Grenfell Tower Inquiry: Government Progress Report, September 2026 (official source, opens in a new tab)
- Building Standards Technical Handbook April 2026: Non-domestic (official source, opens in a new tab)