A building safety case is the Accountable Persons' assessment and management of fire and structural risks in an occupied higher-risk building in England, one at least 18 metres or seven storeys tall with at least two residential units. The safety case report summarises it. The Principal Accountable Person prepares it and gives it to the Building Safety Regulator when asked.

Last reviewed
Reading time
14 minutes
A tall white apartment building with glass balconies

What a building safety case is

The Building Safety Act 2022 (opens in a new tab) puts a duty on the people responsible for an occupied higher-risk building to understand two kinds of risk and to manage them. Section 62 (opens in a new tab) defines a building safety risk as a risk to the safety of people in or about a building arising from the spread of fire or from structural failure. Guidance from the Building Safety Regulator (BSR) describes the fire risk as the spread of fire or smoke in the building.

"Building safety case" is the name for all of that work taken together. The Act itself defines only the safety case report, in section 85 (opens in a new tab). The government's consultation response (opens in a new tab) of 17th August 2023 explains the difference. It says the report "will be supported by the wider safety case, which includes detailed information about the building and assessments of building safety risks and measures in place to manage those risks."

Put simply, the safety case is the evidence and the safety case report is the summary of it that the Principal Accountable Person prepares and gives to BSR when asked. The consultation response gives both the same purpose. They exist "to provide documented assurance that the building and building safety risks within have been understood and assessed" and that proportionate measures are in place to manage those risks on an ongoing basis.

The idea came from the Independent Review of Building Regulations and Fire Safety, which recommended a safety case regime for major fire and structural safety risks in high-rise residential buildings. The consultation response says the approach requires Accountable Persons to understand their buildings as a system. Our building safety case reports service is built around that idea, with the fire evidence produced in-house.

Which buildings need a safety case?

The duties apply to occupied higher-risk buildings in England. Under section 65 (opens in a new tab) a higher-risk building is a building in England that is at least 18 metres in height or has at least seven storeys and contains at least two residential units. A building can therefore fall in through its storey count even when it is under 18 metres.

A higher-risk building is occupied once there are residents of more than one residential unit in it (section 71 (opens in a new tab)). From that point the safety case duties apply. BSR's registration guidance (opens in a new tab) sets out how to count storeys and measure height.

  • Count every floor from ground level to the top floor.
  • Count a mezzanine if its area is 50 percent or more of another floor's area.
  • Do not count the roof.
  • Do not count floors below ground unless the whole ceiling is above ground.
  • Measure height from ground level to the top of the floor surface of the top storey, to two decimal places.
  • Take ground level as the lowest part of the land immediately next to the building.

Buildings used entirely as a hospital, care home, secure residential institution, hotel, military premises or prison are not registered. Every other higher-risk building must be registered with BSR by its Principal Accountable Person. Under section 77 (opens in a new tab) the Principal Accountable Person commits an offence if the building is occupied but not registered. The 2026 to 2027 charging scheme (opens in a new tab) sets the registration application charge at £251 per building.

For a new building the safety case follows the design and construction regime. BSR has been the building control authority for higher-risk buildings in England since October 2023. It approves construction at Gateway 2 and completion at Gateway 3 before occupation. If a unit in a new higher-risk building is occupied before the completion certificate is issued, the relevant Accountable Person commits an offence under section 76 (opens in a new tab). Our building safety gateway support covers those stages. Our guides to the Gateway 1 fire statement and Regulation 38 cover fire information produced earlier in a building's life.

Who is responsible for it?

The duties sit with the Accountable Persons (APs). Under section 72 (opens in a new tab) an AP is a person who holds a legal estate in possession in any part of the common parts. A person without an estate who has a relevant repairing obligation for any part of the common parts is also an AP. Common parts include the structure and exterior of the building and areas provided for the residents of more than one unit. On commonhold land the commonhold association is the AP.

Where there is only one AP, that person is the Principal Accountable Person (PAP). Where there are several, the PAP is the AP who holds the estate in the relevant parts of the structure and exterior or has the repairing obligation for them (section 73 (opens in a new tab)). BSR's guidance for accountable persons (opens in a new tab) notes the PAP is usually an organisation. It might be a freeholder, landlord, management company, resident management company, right to manage company or commonhold association.

The duties cannot be handed over. BSR says APs and the PAP cannot delegate their legal obligations to others. They can employ a managing agent. Accountability and liability for the building's safety still stay with the APs and the PAP. If there is a dispute over who is an AP or the PAP, an interested party, including BSR, can apply to the First-tier Tribunal.

The Responsible Person under the Regulatory Reform (Fire Safety) Order 2005 is a separate role. In some buildings the AP or PAP is also the Responsible Person. Where they are different people, BSR expects building safety information to be shared between the roles. A gap opens when the fire risk assessment is commissioned by one party and the safety case is prepared by another who never sees it.

The duties that make up the safety case

Part 4 of the Act turns the safety case into a set of specific duties. The central ones came into force on 16th January 2024, at the same time as the Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023 (opens in a new tab), which fill in the detail.

Building Safety Act 2022 duties for occupied higher-risk buildings in England
DutySectionWhoWhat it requires
Assess building safety risks83Each APA suitable and sufficient assessment of the risks in their part of the building, repeated at regular intervals, when it may no longer be valid and when BSR directs
Manage building safety risks84Each APAll reasonable steps to prevent a risk materialising and to reduce the severity of any incident, taken promptly and following prescribed principles
Prepare the safety case report85PAPA report containing each AP's risk assessment and a brief description of the steps taken, revised when the PAP considers it necessary or appropriate
Notify BSR86PAPTell BSR after preparing or revising the report and give BSR a copy when asked
Mandatory occurrence reporting87PAP and APsAn effective reporting system for the building and prescribed reports to BSR
Keep information88Each APPrescribed information kept to prescribed standards and up to date, with missing information obtained where practicable
Residents' engagement strategy91PAPA strategy for involving residents in building safety decisions, reviewed, consulted on and followed

The assessment, the management of risk and the report are the core of the safety case. The other duties give it evidence and feedback from the building in the form of occurrence reports, kept records and residents' views.

The safety case report is itself part of the golden thread. Schedule 1 of the 2024 Regulations (opens in a new tab) lists the safety case report as a prescribed document that APs must keep. BSR's golden thread guidance (opens in a new tab) says the rest of the building information kept digitally will help support the report. A report that cites information the golden thread cannot produce is weak evidence.

Residents see a version of it. Under Schedule 2 of the same Regulations (opens in a new tab) APs must give residents a summary of the safety case report. That summary describes the risk assessments and the steps taken or planned. It also evaluates how effectively each identified risk is being or will be managed.

How the risk assessment works

Each AP must assess the building safety risks for their part of the building as soon as reasonably practicable after the building becomes occupied or after they become an AP, whichever is later. The assessment must be suitable and sufficient. It must be repeated at regular intervals, whenever the AP has reason to suspect it is no longer valid and whenever BSR directs (section 83 (opens in a new tab)).

The Act sets no fixed interval for repeating the assessment. Setting a frequency that suits the building and recording the reason for it is sensible practice. A change to the building, an incident or new information about how it was built are the obvious points at which the current assessment may stop being valid.

The Act does not require any particular method. BSR's detailed guide to assessing safety risks (opens in a new tab) does not recommend a specific methodology. It says HAZID (hazard identification) is relatively straightforward and may be suitable. The team should include people with knowledge of safety management systems, fire safety and structural safety. BSR adds that the team does not have to include consultants or other specialists.

A fire risk assessment is not the whole answer. BSR warns APs not to assume the fire risk assessment will be all they need to meet the section 83 duty. A fire risk assessment is about fire. The section 83 assessment has to cover every building safety risk. Structural failure is one of them.

What managing the risk involves

Once the risks are identified, section 84 (opens in a new tab) requires each AP to take all reasonable steps to prevent a building safety risk materialising and to reduce the severity of any incident if one does. Steps may include building works. They must be taken promptly. The AP must also have arrangements for the effective planning, organisation, control, monitoring and review of those steps.

Regulation 4 (opens in a new tab) of the 2023 Regulations sets the principles the steps must follow.

  • Avoid building safety risks.
  • Evaluate the risks that cannot be avoided.
  • Combat risks at source.
  • Ensure suitable and proportionate systems of inspection, testing and maintenance.
  • Give collective protective measures priority over individual ones.
  • Adapt to technical progress.
  • Replace the dangerous with the non-dangerous or less dangerous where reasonable.
  • Consider the impact on residents and engage with them.
  • Give instructions and information to employees and people working in the building.
  • Make sure anyone helping with the Part 4 duties has the relevant competence.

For an individual, competence means the skills, knowledge, experience and behaviours needed for the work. For an organisation it means organisational capability. A trainee counts as competent if adequately supervised.

Two of the principles point the same way. Risks are combated at source and collective protective measures take priority over individual ones. Reinstating a missing fire stop deals with the risk at source and protects everyone in that part of the building at once.

When is the safety case report due?

The duty to prepare a safety case report has been in force since 16th January 2024. The PAP must prepare it as soon as reasonably practicable after the building becomes occupied or after they become the PAP. They must also notify BSR after preparing or revising it (section 86 (opens in a new tab)). BSR said on 9th July 2026 that PAPs "must not wait for any future assessments before preparing safety case reports".

BSR asks for the report at two points. The first is when it directs the PAP to apply for a building assessment certificate. The second is any other time it asks for a copy. A direction under section 79 (opens in a new tab) gives the PAP 28 days to apply. Under section 80 (opens in a new tab) the application includes the most recent safety case report, information about the mandatory occurrence reporting system, information showing compliance with the section 89 information duties and a copy of any residents' engagement strategy.

BSR then assesses whether the relevant duties are being complied with and may inspect the building. It must give a certificate if satisfied that they are (section 81 (opens in a new tab)). A building does not need a certificate before people can live in it. BSR aims to reassess each certificate every five years. It may do so sooner after significant changes, management issues, incidents or improvement works.

The 2026 to 2027 charging scheme sets the certificate application charge at £312, plus £156 per hour of BSR staff time spent assessing the application. GOV.UK's page on how to apply for a building assessment certificate (opens in a new tab) gives the same £312 charge. Charges are set each year. Check the current scheme before budgeting.

On 9th July 2026 BSR announced a more targeted approach (opens in a new tab). It will only call in new applications when necessary until improved processes are agreed. Our safety case report example covers what the report contains and how BSR assesses it.

What happens if the duties are not met?

There is no offence attached to section 85 itself. Enforcement comes through the wider regime. Under section 99 (opens in a new tab) BSR can give a compliance notice to an AP who has contravened, is contravening or is likely to contravene a relevant requirement. Breaching a compliance notice is an offence carrying up to two years' imprisonment, a fine or both on indictment.

Section 101 (opens in a new tab) creates a separate offence where an AP contravenes a relevant requirement without reasonable excuse and that places people in or about the building at critical risk. Critical risk means a significant risk of death or serious injury arising from a building safety risk. Failing without reasonable excuse to apply for a building assessment certificate within 28 days of a direction is also an offence.

After a serious failure to comply with a duty or at least two failures under the Act, BSR can apply to the First-tier Tribunal for a special measures order. A special measures manager is then appointed to the building.

A refused certificate is not a finding that the building is unsafe. BSR describes a certificate as a snapshot of compliance at the time of assessment. If a problem can be remedied promptly BSR may set a period to fix it and then issue the certificate. Otherwise it sends a contravention letter or compliance notice. The PAP can ask for a review and then appeal to the First-tier Tribunal.

Does the same apply in Wales and Scotland?

The Building Safety Act 2022 safety case regime covers buildings in England. Section 65 limits a higher-risk building to a building in England. The 2023 and 2024 Regulations apply to England only.

Wales has passed its own law. The Building Safety (Wales) Act 2026 (opens in a new tab) passed the Senedd on 10th March 2026 and received Royal Assent on 27th April 2026. It regulates the assessment and ongoing management of building safety risks in multi-occupied residential buildings during occupation. Section 6 (opens in a new tab), in force since 28th April 2026, places buildings in three categories.

Once commenced, section 37 (opens in a new tab) will require the PAP for an occupied category 1 building to prepare a safety case report covering the current fire risk assessment, fire safety management steps, the current structural risk assessment and structural safety steps. The report goes to the local authority acting as building safety authority rather than to BSR. Section 37 was not in force at Royal Assent and needs a commencement order from the Welsh Ministers. The regulations that will set its content had not been made when this guide was reviewed on 23rd November 2026. Our Wales page covers work there.

Safety case reports in England and Wales at 23rd November 2026
PointEnglandWales
LawBuilding Safety Act 2022, Part 4Building Safety (Wales) Act 2026, section 37
BuildingsOccupied higher-risk buildings at least 18 metres or seven storeys with at least two residential unitsOccupied category 1 buildings at least 18 metres or at least seven storeys
Report goes toBuilding Safety RegulatorThe local authority acting as building safety authority
StatusIn force since 16th January 2024Not yet in force and content regulations not made

Part 4 of the 2022 Act applies only to buildings in England. It does not apply in Scotland. The Scottish Government's published work on high risk buildings is a construction-phase Compliance Plan Approach (opens in a new tab) for building warrants rather than an occupation-phase safety case. Our Scotland page covers work there.

If you hold a building in England and are unsure where to begin, our building safety case reports service starts with the evidence you already have. Where the fire strategy itself is in doubt, a fire strategy review is usually the first step.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

They are related but different. The safety case is the full body of information and assessments about the building's fire and structural risks and how they are managed. The safety case report is the summary of it that the Principal Accountable Person prepares and gives to BSR when asked.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.