What are the three routes?
Fire safety design for a building in England usually starts from one of three documents. Approved Document B (opens in a new tab) is the statutory guidance, approved under section 6 of the Building Act 1984 (opens in a new tab). BS 9991 and BS 9999 are British Standard codes of practice. Approved Document B lists them by title as fire safety in the design, management and use of residential buildings and fire safety in the design, management and use of buildings.
The difference is legal weight. Under section 7 of the Building Act 1984 (opens in a new tab), a failure to comply with an approved document may be relied upon as tending to establish liability and proof of compliance may be relied on as tending to negative it. The Approved Document B FAQ says following other guidance would not provide that legal protection.
The Building Safety Regulator set out its view in a letter of 14th March 2025 on BS 9991:2024 (opens in a new tab), a BSR document hosted by RICS. It says compliance with British Standards for the purpose of the Building Regulations is voluntary with some notable exceptions. It describes British Standards as good practice produced by the industry. It adds that BS 9991 is commonly used in the design of residential buildings, particularly high-rise residential buildings, as an alternative to statutory guidance or other design approaches.
A fourth route is fire safety engineering, for which Approved Document B says BS 7974 and its supporting published documents provide a framework. Our fire engineering service works across all four and our guide to fire engineered solutions covers the engineered route in detail.
What Approved Document B says about using other standards
Paragraph 0.9 of both volumes governs the choice. It says approved documents provide guidance for some common building situations and there may be alternative methods of complying with the Building Regulation requirements. It continues as follows.
"If other standards or guidance documents are adopted, the relevant fire safety recommendations in those publications should be followed in their entirety. However, in some circumstances it may be necessary to use one publication to supplement another. Care must be taken when using supplementary guidance to ensure that an integrated approach is used in any one building."
Two points follow from that text. The adopted document should be followed as a whole for the fire safety recommendations it contains. Where a second document fills a gap, the two have to work together in the building rather than being used as a menu from which the easiest answer to each question is picked.
Paragraph 0.4 says the same of Approved Document B itself. The document should be considered as a whole and particular attention should be given where one part is not fully followed. That could have a negative effect on other provisions.
Paragraph 0.9 also sets the bar for any alternative. The overall level of safety should not be lower than the approved document provides. It is the responsibility of those undertaking the work to demonstrate compliance.
Where Approved Document B cites BS 9991 and BS 9999
Approved Document B refers to both standards at specific points only. The Volume 1 index lists BS 9991 once, at paragraph 3.33 on flats with balcony or deck access, which says paragraph 3.27 may be modified using the guidance in clause 7.3 of BS 9991. BS 9999 appears more often, mostly for atria, firefighting shafts, assembly buildings and fire safety information.
| Volume and paragraph | Topic | What Approved Document B says |
|---|---|---|
| Volume 1, 3.33 | Flats with balcony or deck access | Paragraph 3.27 may be modified using clause 7.3 of BS 9991 |
| Volume 1, 7.20d | Openings in compartmentation | May include atria designed in accordance with Annexes B and C of BS 9999 |
| Volume 1, Section 15 | Firefighting shafts | Venting refers to clause 27.1 of BS 9999 and the lift shaft should be constructed in accordance with Section 6 of BS 9999 |
| Volume 1, 17.6 and Volume 2, 19.6 | Fire safety information | Further guidance in clause 9 and Annex H of BS 9999 |
| Volume 2, 0.12 | Shopping complexes | A suitable approach is given in Annex E of BS 9999 |
| Volume 2, 0.13 and 2.20 | Assembly buildings and fixed seating | Annex D of BS 9999 |
| Volume 2, 0.16 and 8.13 | Atria | Annexes B and C of BS 9999, which apply only where the atrium breaches a compartment |
| Volume 2, 1.14 | Alarms in buildings with atria | BS 9999 provides guidance for fire detection and alarm systems |
| Volume 2, 3.16 | Simultaneous evacuation | Annexes B and C of BS 9999 include designs based on simultaneous evacuation |
| Volume 2, 5.32 | Evacuation lifts | Guidance on design and use is given in Annex G to BS 9999 |
The Approved Document B FAQ (opens in a new tab) explains what those references carry. When an approved document names a standard, the relevant version is listed at the end. Until the approved document is amended, those references are part of the guidance approved under section 6. Appendix F lists BS 9991 in its 2015 version and BS 9999 in its 2017 version.
If the issuing body has since revised a standard, the FAQ says the new version may be used as a source of guidance provided it continues to address the relevant requirements of the Building Regulations. It also says that if work complies with the guidance referred to in the approved document, that makes it likely the work conforms with the requirements.
BSR's letter adds a limit. It says references to a British Standard in Approved Document B are largely to a specific section or provision and should not be seen as a wide-ranging endorsement of the standard. It gives BS 9991 as the example, where only specific sections are referred to and not the entirety of the guidance.
BSR's position on BS 9991:2024
BSR's letter of 14th March 2025 came from its Building Safety Division. It notes that a new version of BS 9991 was published in November 2024, while Approved Document B still names the 2015 version.
The letter says there are parts of BS 9991:2015 that would clearly now be unacceptable. Its example is that the 2015 version does not address the ban on combustible materials, which came into force later, in 2018. It also says BSR does not expect schemes sufficiently progressed in design, under construction or sufficiently progressed on site to undertake a fundamental redesign on the basis of the updated publication. When reviewing applications for new higher-risk buildings, BSR will take into consideration the timing of the application and changes to guidance or standards made while the design was developed.
The benchmark matters more than the label on the standard. BSR expects building work to demonstrate, for common buildings including common higher-risk buildings, a level of safety at least comparable to the one provided in the version of Approved Document B that applies when the application is deposited. It says not following the Approved Document shifts the burden of proof to demonstrate compliance. Nothing in the regulations or approved documents prevents higher standards or compliance by other means.
The letter also warns that compliance with a British Standard does not always itself confer immunity from legal obligations. It says building control providers for other types of building are not bound by BSR's approach and may set their own policies and processes when considering applications.
How to justify the route you choose
For a higher-risk building in England, BSR's guidance on preparing a building control approval application (opens in a new tab), last updated on 1st October 2026, asks the compliance statement to cover each element of the work. For each one it asks for the guidance, standards or design codes you intend to follow, why you have chosen them and your reasoning for how following that approach means the work will comply. BSR's letter says the application should give clear reasons for the approach and explain how and why it ensures compliance with the functional requirements.
BSR's page on getting building control applications right (opens in a new tab) sets out three steps, Identify, Clarify and Justify. At the clarify step, applicants must say which standards, codes or methodologies have been applied and why they were selected for the specific project. The page says simply listing a standard is not enough. It suggests imagining explaining to a colleague why a particular fire safety code was used for a complex mixed-use development.
The justify step asks for a clear, evidence-based narrative that connects the elements and the standards into a cohesive compliance story. Where more than one document is used, that narrative is where the integrated approach in paragraph 0.9 is shown rather than asserted. Our guide to the Gateway 2 fire strategy covers the rest of the application.
The choice is recorded even earlier for relevant buildings in England. The Gateway 1 fire statement form asks which standard the design follows, offering Approved Document B Volume 1, BS 9991, Approved Document B Volume 2, BS 9999, a fire engineered approach, BB100, HTM 05-02 and BS 7974. For other buildings, the introduction to the approved documents says alternatives should be agreed with the building control body at an early stage.
When each route tends to fit
No official source ranks the routes. What the sources do say gives a fair picture of where each tends to sit and the table summarises it.
| Route | Tends to suit | What official sources say |
|---|---|---|
| Approved Document B Volume 1 | Houses and blocks of flats in common building situations | Guidance for common building situations. May not be appropriate where a case is unusual in design, setting, use, scale or technology. |
| Approved Document B Volume 2 | Buildings other than dwellings in common building situations | Points to other guidance for health care, schools, prisons, shopping complexes, assembly buildings and atria. |
| BS 9991 | Residential buildings, particularly high-rise | BSR says it is commonly used for residential buildings as an alternative to statutory guidance. Approved Document B cites it once. |
| BS 9999 | Shopping complexes, assembly buildings and buildings with atria, where Approved Document B itself points to it | Approved Document B refers to its annexes for these topics and for evacuation lift design. |
| Fire safety engineering (BS 7974) | Complex buildings and buildings that contain different uses | May be the only practical way to achieve a satisfactory standard of fire safety in some complex buildings. |
Take a hypothetical building with shops on the ground floor and flats above. Volume 1 paragraph 0.18 says Volume 2 should also be consulted for mixed use buildings. Volume 2 paragraph 0.24 says guidance from both volumes, other guidance or special measures may be needed. If BS 9991 were adopted for the flats, paragraph 0.9 would expect its fire safety recommendations to be followed in their entirety and any guidance used alongside it to form an integrated approach.
Some buildings need more than any code on its own. The FAQ says tall, large or complex buildings where the structure can contribute fuel to a fire are not common building situations and following Approved Document B may not be sufficient. Paragraph 0.9 adds that guidance written for assessing existing buildings is unlikely to be appropriate for new building work.
Because BSR compares the level of safety with the applicable version of Approved Document B, the recent additions to it matter whichever route is chosen for a higher-risk building. They include sprinklers in blocks of flats over 11m, evacuation alert systems where the top storey is over 18m and, from 30th September 2026, more than one common stair where the top storey is 18m or more. Our guide to open plan flats covers flat layouts that fall outside the Volume 1 arrangements.
Mistakes that cost time
The official sources point to the same few errors. Most are avoidable if the route is chosen and recorded at the start.
- Codes are mixed without showing an integrated approach. Paragraph 0.9 expects adopted recommendations to be followed in their entirety and any supplementary guidance to be integrated.
- A standard is listed but not justified. BSR says simply listing a standard is not enough and that this is often where applications fall short.
- Safety elements are assumed. BSR says initial submissions have often fallen short because critical fire and structural safety elements were unclear, undocumented or assumed rather than substantiated.
- Compliance is claimed in vague terms. BSR says statements such as compliant with Part A are no longer acceptable.
- A cross-reference is read as an endorsement. BSR says Approved Document B refers only to specific sections of BS 9991, not the entirety of the guidance.
- An outdated version is relied on. BSR says parts of BS 9991:2015 would clearly now be unacceptable because it does not address the combustible materials ban.
- A British Standard is treated as a shield. BSR says compliance with one does not always itself confer immunity from legal obligations.
Our fire strategy review service checks an existing strategy for these points before it goes to building control.
Changes proposed in the Approved Document B review
The Review of Approved Document B (opens in a new tab) is the Building Safety Regulator's consultation for England, published with MHCLG. It opened on 25th March 2026 and closed at 11:59pm on 1st July 2026. As at 23rd November 2026 GOV.UK says the feedback is being analysed. Two proposals bear directly on the choice of route.
- Clearer guidance for external balcony approach to flats. The consultation says this removes the only reference to BS 9991 in Approved Document B, at Volume 1 paragraph 3.33.
- A threshold of 11m above which Approved Document B cannot be used when combustible structural elements are used. This is the preferred option and above the threshold an alternative approach is expected.
These are proposals only. Until Approved Document B is amended, the FAQ position stands and the document still names BS 9991 in its 2015 version and BS 9999 in its 2017 version. Our guide to Approved Document B covers the review and the published amendments.
Wales and Scotland
Wales has its own Approved Document B with the same principle in older words. Welsh Volume 2 (opens in a new tab) paragraph 0.19 says that if other codes or guides are adopted, the relevant fire safety recommendations in that publication should be followed rather than a mixture of the publication and the Approved Document. It accepts there may be circumstances where it is necessary to use one publication to supplement another.
The Welsh Volume 2 still cites parts of BS 5588 where the England volumes cite BS 9999. Its examples include BS 5588-10:1991 for shopping complexes, BS 5588-6:1991 for assembly buildings, BS 5588-7:1997 for atria and clause 13 of BS 5588-1:1990 for balcony or deck access flats. See our Wales page for projects there.
Scotland uses the Technical Handbooks. Clause 2.0.7 of the Domestic Technical Handbook (opens in a new tab) says the guidance indicates one or sometimes more than one means of complying with the mandatory standards 2.1 to 2.15. For fire safety engineering, the fire engineer, the building standards verifier and the fire and rescue service should be consulted early in the design process. In large and complex buildings it says a holistic approach from first principles is desirable, using a qualitative design review.
The position is similar in every nation. Choose a route early, follow it as a whole and explain any supplementary guidance element by element. Our fire engineering team sets out the route and its justification before the design is fixed. See our Scotland page for projects there.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Approved Document B (fire safety) volumes 1 and 2, GOV.UK (official source, opens in a new tab)
- Approved Document B Volume 1: Dwellings (England) (official source, opens in a new tab)
- Approved Document B Volume 2: Buildings other than dwellings (England) (official source, opens in a new tab)
- Approved Document B: frequently asked questions (official source, opens in a new tab)
- Building Act 1984, section 6 (official source, opens in a new tab)
- Building Act 1984, section 7 (official source, opens in a new tab)
- BSR letter on BS 9991:2024, 14th March 2025 (hosted by RICS) (official source, opens in a new tab)
- Preparing information for a building control approval application (BSR) (official source, opens in a new tab)
- Getting building control applications right (BSR) (official source, opens in a new tab)
- Review of Approved Document B: fire safety guidance (consultation) (official source, opens in a new tab)
- Approved Document B Volume 2, Wales: buildings other than dwellinghouses (official source, opens in a new tab)
- Building Standards Technical Handbook, domestic, April 2026 (Scottish Government) (official source, opens in a new tab)