Skip to content

Distribution, manufacturing and storage

Warehouses and industrial buildings are big, high and full of fire load. The fire strategy balances the Building Regulations, the insurer's requirements and the operator's need for an uninterrupted floorplate.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
Approved Document B Volume 2, BS 9999:2017, BS EN 12845 for sprinklers
Signed off by
A Chartered Engineer (CEng)
Scroll

What makes this sector different

What a fire strategy for warehouses and industrial buildings has to answer.

01

Compartment size

Approved Document B compartment limits versus the floorplate the operation needs and the sprinkler trade off that bridges them.

02

Travel distances

Long travel through racking aisles and the engineered justification where the guidance runs out.

03

Insurer expectations

Property protection requirements often exceed life safety guidance and have to be reconciled.

04

Hazardous storage

Lithium ion batteries, aerosols and flammables change the strategy.

Evacuation strategy

How evacuation works in a warehouse or factory

Warehouses and factories evacuate simultaneously. They hold few people for their size and those people generally know the building. The difficulty is distance. Racking aisles, mezzanines and conveyor lines lengthen the real route to an exit well beyond the straight line on a plan. The strategy measures travel along the route people will actually walk.

Fire spread is the other half. A high bay warehouse fire grows faster than almost any other building fire and can outrun both the occupants and the fire service. Sprinklers, roof venting and compartment walls are the tools for controlling it. Which combination is right depends on what is stored, how high it is stacked and what the insurer requires.

Our approach

How we write a fire strategy for warehouses and industrial buildings.

We produce strategies that satisfy Building Control and sit comfortably alongside insurer requirements. Where the floorplate exceeds the guidance we justify it through sprinklers, smoke ventilation or engineered analysis and we say plainly which route is cheapest for the building.

Typical deliverables

  • Fire strategy report and plans
  • Compartmentation and sprinkler trade off statement
  • Smoke ventilation design intent
  • Insurer liaison where required

Standards and guidance

Fire safety guidance for warehouses and industrial buildings

Approved Document B Volume 2 (official source, opens in a new tab)
Limits a single storey storage building without sprinklers to 20,000 square metres of floor area and 18 metres in height.
BS 9999:2017
Allows longer travel distances and larger compartments where the risk profile is low or sprinklers are fitted.
BS EN 12845 for sprinklers
The design standard for automatic sprinkler systems, including the hazard classification of stored goods.
Fire Safety Order 2005 (official source, opens in a new tab)
Applies to the building in use. The risk assessment has to keep pace with changes in what is stored.

Common questions

Fire strategy questions on warehouses and industrial buildings, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Not always. In England, Table 8.1 of Approved Document B Volume 2 sets compartment limits for a storage building without sprinklers. A single storey storage building has a limit of 20,000 square metres of floor area and 18 metres of compartment height. With sprinklers there is no limit on either. In a multi-storey storage building sprinklers double the maximum compartment volume. The alternatives are to divide the building with compartment walls or to justify a larger compartment with a fire engineered solution. We assess both.

Guides

Guides for warehouses and industrial buildings.

Other sectors

All sectors

Fire strategy for warehouses and industrial buildings

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.