Is there an official fire strategy template?
We have found no template or required format for a fire strategy report published by the government, the Building Safety Regulator or the National Fire Chiefs Council. In its Grenfell Tower Inquiry progress report (opens in a new tab), updated on 2nd October 2026, the government said it is working with industry and regulatory partners to understand what should be included in a fire safety strategy. A statutory content list may follow. For now the content is set by the official lists described below.
People often ask about PAS 911. BSI's own catalogue lists PAS 911:2007 as withdrawn on 5th June 2020. None of the official documents we checked for this guide refer to it.
What does exist is a set of official lists that say what information the authorities and the building owner need. Approved Document B lists the fire safety information to hand over at completion. The higher-risk buildings regulations say what a Gateway 2 fire and emergency file must set out. The fire service consultation pro forma lists what the fire service is told about a scheme. A good report is built so that each of those lists can be answered from it. If you need the background first, read what a fire strategy is.
A real example published on GOV.UK
The best public example we know of is a fire safety strategy published by the Ministry of Housing, Communities and Local Government as part of the Urgent Crown Development application for MOD Bicester (Site A) (opens in a new tab). The application page was published on 2nd September 2026 and last updated on 16th November 2026, shows the application as approved and applies to England. The fire strategy report (opens in a new tab) is a 22 page PDF titled RIBA 2 Fire Safety Strategy and dated May 2026. It was prepared by consultants appointed by the Home Office.
Treat it as an example of a real deliverable, not as a government template. The application page says some of its documents were published with redactions because they contain sensitive information. Its contents page is a useful model of what a RIBA Stage 2 strategy covers.
- Section 1: General, Objectives / Limitations, Design Guidance, The Construction (Design and Management) Regulations, The Regulatory Reform (Fire Safety) Order 2005, Sources of Information
- Section 2: Project Description
- Section 3: Risk Profiles, with Cluster Accommodation
- Section 4: Fire Safety Systems, covering fire detection and alarm (system category and fire alarm panel), emergency lighting and escape signage
- Section 5: Means of Escape, covering the evacuation strategy, horizontal means of escape (travel distances and minimum number of exits), vertical means of escape (external stairs), evacuation of disabled people and the assembly point
- Section 6: Internal Fire Spread (Linings)
- Section 7: Internal Fire Spread (Structure), covering elements of structure and a fire resistance summary
- Section 8: External Fire Spread, covering reaction to fire classification and space separation
- Section 9: Access and Facilities for Firefighting, covering fire vehicle access for non-residential and residential buildings, access routes and water supplies
- Section 10: Design Risks
A few features are worth copying. The objectives section lists requirements B1 to B5 and says any non-compliant aspects will be justified by a qualitative or quantitative appraisal where appropriate. Otherwise an alternative code compliant solution will be suggested. It names its principal guidance as BS 9999:2017 and BS 9991:2024. It states that it is subject to formal approval by building control and consultation with other authorities. It also says it deals only with the life safety of occupants and does not include property protection, which is the kind of limitation every strategy should state plainly.
A contents page for a good fire strategy report
The contents below are our model for a design stage fire strategy. Each heading exists because an official list asks for the information in it. A small building will need a few pages under each heading. A complex one will need many more, with annexes for calculations and modelling.
- 1 Introduction: the building, the work, the client, the RIBA stage, the revision history and what the report does not cover
- 2 Design guidance and route to compliance: the documents followed, why they were chosen and any departures
- 3 Building description and risk profile: use, purpose group, height to the top storey, number of storeys and basements, floor areas and occupant numbers
- 4 Means of warning and escape (B1): detection and alarm, evacuation strategy, exit capacity for each storey, travel distances, stairs, provision for disabled people and assembly points
- 5 Internal fire spread, linings (B2)
- 6 Internal fire spread, structure (B3): fire resistance of elements of structure, compartmentation, fire-separating elements, cavity barriers, fire doorsets, dampers, fire shutters and any suppression
- 7 External fire spread (B4): external wall construction, whether regulation 7(2) applies, space separation and roofs
- 8 Access and facilities for the fire service (B5): vehicle access, water supplies, fire mains, firefighting shafts and the secure information box
- 9 Active systems: sprinklers, smoke control and its mode of operation, emergency lighting, signage and an outline cause and effect matrix
- 10 Management assumptions: staffing, evacuation procedures, maintenance and anything else the design relies on
- 11 Fire engineered solutions and compensatory features: what was analysed, how and who reviewed it
- 12 Design risks and open items: what is still to be resolved and by whom
- 13 Handover: the fire safety information to be given under Regulation 38
- Appendices: annotated fire strategy drawings, calculations, modelling reports and the drawing schedule
| Contents heading | Official list that asks for it |
|---|---|
| Design guidance and route | Building Safety Regulator compliance statement guidance (the standards followed and why) and the fire service pro forma (principal design documents used) |
| Building description and risk profile | Fire service pro forma project fields (purpose group or risk profile, height, storeys, basements, occupant numbers) |
| Means of warning and escape | Approved Document B records list (escape routes, occupant load, escape strategy, assembly points) and pro forma section 4.0 |
| Internal and external fire spread | Approved Document B records list (passive measures) and the pro forma questions on structure, passive protection and cladding |
| Access and facilities for the fire service | Fire and emergency file plan of fire service access and water supply and pro forma section 5.0 |
| Active systems | Approved Document B records list (sprinkler and smoke control design) and pro forma section 3.0 |
| Management assumptions | Approved Document B essential information and the fire and emergency file management measures |
| Fire engineered solutions | Pro forma questions on any fire engineered solution, quantitative analysis and who reviewed it |
| Handover | Approved Document B Volume 2 Section 19 and Volume 1 Section 17 |
The table links the model contents to the official lists behind them. It is a useful check before issue. If a list asks for something the report does not cover, the gap will be found by someone else later.
Sections 4 to 8 follow the five Part B requirements in the same order as the Building Regulations and Approved Document B. That makes the report quicker to check against both. The drawings matter as much as the text. Our fire strategy plans service produces the annotated plans that sit behind each section.
What Approved Document B asks for at handover
The most detailed official list is the Regulation 38 guidance in Approved Document B Volume 2 (opens in a new tab), Section 19, with the same text in Volume 1, Section 17. It applies in England. It says it is a guide and not exhaustive and that the level of detail should be considered case by case. A strategy written with this list in mind is much easier to turn into a handover pack.
As essential information it asks for an as-built plan showing escape routes with exit capacity for each storey and the building, fire resisting construction and fire-separating elements including cavity barriers in walk-in spaces, fire doorsets, detection, alarm and firefighting equipment, sprinklers, smoke control, high risk areas, power supplies and the location of secure information boxes. It also asks for equipment specifications and maintenance schedules, the management assumptions behind the design and the provision for evacuating disabled people. Volume 2 adds that care homes should include the assessment of the number of beds in a compartment.
For complex buildings it asks for a detailed record of the fire safety strategy and the procedures for operating and maintaining fire protection measures, including an outline cause and effect matrix. The records should include all assumptions in the design of the fire safety systems, such as fire load, any risk assessments, the escape strategy, all passive and active measures, as-built plans and commissioning test records. Our guide to Regulation 38 sets out the full pack and the handover duties.
The government's Approved Document B FAQ (opens in a new tab) adds one more point. Where a material relies on an additive or treatment with a specific maintenance requirement, such as a fire retardant coating, that limitation should be highlighted in the Regulation 38 information. The strategy is the right place to record it first.
What the fire service is told at consultation
Fire services ask building control bodies to send a completed standard pro forma with each consultation. It is Appendix J of the Building Regulations and Fire Safety Procedural Guidance of July 2020 and fire services publish copies, such as the Merseyside Fire and Rescue Service pro forma (opens in a new tab). The guidance predates the move of the consultation duty from the Fire Safety Order into the Building Regulations, which happened on 1st October 2023 in England and 1st July 2026 in Wales. Read the pro forma as a description of what the fire service wants to know rather than as a statement of the current law. Its sections are listed below.
- 1.0 Project Details
- 2.0 Project Information
- 3.0 Fire Suppression, Smoke Control, Fire Detection and other fire safety systems
- 4.0 Evacuation Strategy
- 5.0 Access and Facilities for Firefighting
- 6.0 Building Control Body Assessment
- 7.0 Comments from the Building Control Body
- 8.0 List of Supplied Information, including a document and drawing schedule
The detail inside those sections tells you what a strategy must state clearly. The form asks for the purpose group or risk profile in the standard designed to, the height to the top storey, the number of storeys and basements and the total proposed number of occupants. It asks how the structure achieves its fire resistance, whether regulation 7(2) applies to any part of the proposal and which suppression, detection, smoke control and emergency lighting is provided, with any areas of deviation from the code.
It asks for the evacuation strategy, choosing from simultaneous, phased, staged, stay put and progressive horizontal. Our guide to progressive horizontal evacuation covers the last of these. It also asks which design documents were used, whether a fire engineered solution has been adopted, whether quantitative analysis has been reviewed and by whom. Any compensatory features have to be listed. The first example it gives under supplied information is the fire strategy itself.
Gateway 2 and the fire and emergency file
For a new higher-risk building in England and for category A work to an existing one, the Gateway 2 application must include a fire and emergency file. The Building Safety Regulator says this file is often known as a fire strategy. Schedule 1 of the Higher-Risk Buildings Procedures Regulations 2023 (opens in a new tab) requires it to set out the matters considered when assessing the building safety risks, the design approach taken to comply and the measures the owner should adopt to manage the building so everyone can be evacuated safely, with assumptions about the occupiers and their behaviour. It must include a plan of the fire service's access and water supply requirements and a report showing how compliance will be achieved. The plans given to the fire service at consultation must include it.
The Building Safety Regulator's application guidance (opens in a new tab) adds that the compliance statement must explain the guidance or standards followed for each element and the reasoning for choosing them. Drawings should be clearly labelled, with a reference file so the Regulator can find the parts referred to. Our Gateway support service prepares these submissions.
Its own analysis of a selection of rejected applications shows why this matters. It found that 73 percent of new higher-risk building applications did not contain sufficient detail and 45 percent set out work that would breach building regulations, including longstanding functional requirements. For existing buildings, 89 percent did not contain sufficient detail. Once the building is occupied the same information feeds the safety case, which our safety case report example describes.
Hospitals, schools and university estates
Some clients publish their own lists. NHS England's HTM 05-02 (2015) (opens in a new tab) says healthcare premises need a detailed record of the fire safety strategy, evacuation procedures, patient dependency and staffing levels. It lists the Regulation 38 information for healthcare, starting with the emergency evacuation plan and its assumptions about trained staff. It recommends a Qualitative Design Review for very large and complex projects and says the evacuation strategy should be agreed with the client user group, the design team, the fire service and building control.
For schools and colleges in England, the Department for Education's Technical Manual, revision C01 of 12th January 2026, structures its fire safety section to mirror Approved Document B Volume 2. It requires a planned maintenance plan for fire safety installations as part of the handover information. For modern methods of construction it requires a Fire Safety Strategy Report and drawings that identify every element of structure, explain how each achieves its fire resistance and identify where fire protection is not applied directly to elements of structure, with any specific maintenance requirements. Our BB100 guide covers school design in more detail.
University estates teams show what a building owner asks for. The University of Manchester's guidance for new projects, last revised on 1st December 2018, describes three levels of design approach, Approved Document B, BS 9999 and BS 7974. It says the fire strategy should be dynamic through design and construction and will form the basis of future fire risk assessments. Imperial College London lists the typical headings of a design strategy and says an as-built strategy confirms what has actually been provided and supports the digital golden thread.
Mistakes that get a strategy sent back
The Building Safety Regulator has been direct about what fails. It says referencing Part B and attaching hundreds of pages of drawings without context is no longer acceptable, that critical information is too often buried in technical reports with no signposting and that too many submissions rely on technical documents to speak for themselves. Presentation quality, meaning how well an application is signposted, is one of its rejection principles.
- Naming a standard without explaining why it applies and how it was used
- Mixing clauses from different codes instead of following one in its entirety, which Approved Document B warns against
- Relying on management that the owner cannot sustain, which Approved Document B says does not meet the requirements
- Leaving a fire service concern unresolved and hoping to settle it later, which the Regulator says should not be deferred
- Drawings that do not match the text and text that refers to drawings nobody can find
- No statement of what the strategy excludes, such as property protection
Requests for information also need planning. The Regulator expects missing information to take no more than 2 working weeks to produce and a response to each request within 48 hours, even if only a holding reply. A request not answered within 1 working week is treated as a nil response and an application is likely to be rejected after a second unmet request. An independent fire strategy review before submission is the cheapest way to find these gaps.
Wales and Scotland
In Wales the Welsh Government's Approved Document B Volume 2 has its own Appendix G on fire safety information. It is split into simple buildings and complex buildings. For simple buildings it lists an as-built plan of escape routes, compartmentation, fire doors, detection and firefighting equipment, suppression, smoke control, high risk areas, equipment specifications, management assumptions and provision for evacuating disabled people. For complex buildings it asks for a more detailed record of the fire safety strategy and cites the fire safety manual annex of BS 5588-12:2004. The fire service pro forma cites the Welsh Approved Document B diagrams alongside the England ones. The same form is set up for use in both nations.
Scotland does not use Regulation 38. Instead a Fire Safety Design Summary records key information about the design and construction of the building to assist its operation and maintenance for fire safety purposes. Since October 2013 it has been required with the completion certificate for a new non-domestic building or a conversion to one. A strategy written for a Scottish project should be organised so that summary can be compiled from it.
Whatever the nation, the report should be written for the people who will rely on it, from the building control officer to the person who runs the building in twenty years. If you would like a strategy built this way, our fire strategy reports team can scope one from your drawings.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Grenfell Tower Inquiry: government progress report, September 2026, the construction industry (official source, opens in a new tab)
- PAS 911:2007 Fire strategies, guidance and framework for their formulation (BSI catalogue) (official source, opens in a new tab)
- Urgent Crown Development application: MOD Bicester (Site A) (official source, opens in a new tab)
- MOD Bicester (Site A) fire strategy report (PDF) (official source, opens in a new tab)
- Approved Document B Volume 2, 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments (official source, opens in a new tab)
- Approved Document B Volume 1, 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments (official source, opens in a new tab)
- Approved Document B: fire safety frequently asked questions (official source, opens in a new tab)
- Fire and rescue service consultation pro forma (Merseyside Fire and Rescue Service copy) (official source, opens in a new tab)
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, Schedule 1 (official source, opens in a new tab)
- Building (Higher-Risk Buildings Procedures) (England) Regulations 2023, regulation 6 (official source, opens in a new tab)
- Preparing information for a building control approval application (Building Safety Regulator) (official source, opens in a new tab)
- Getting building control applications right (Building Safety Regulator) (official source, opens in a new tab)
- Criteria for validating, approving or rejecting building control applications (Building Safety Regulator) (official source, opens in a new tab)
- HTM 05-02: Firecode, guidance in support of functional provisions (2015) (official source, opens in a new tab)
- DfE Technical Manual, revision C01, January 2026 (official source, opens in a new tab)
- Approved Document B Volume 2, buildings other than dwellinghouses (Wales) (official source, opens in a new tab)
- Fire Safety Design Summary (Scottish Government) (official source, opens in a new tab)
- EPM HS32 Guidance for New Projects, Fire Strategies (University of Manchester estates) (official source, opens in a new tab)
- Fire strategy, Imperial College London contractor portal (official source, opens in a new tab)