On a higher-risk building the Building Safety Regulator decides when you may start on site and when anyone may move in, which makes a thin application the most expensive delay in the programme. We prepare, submit and defend Gateway 2 and Gateway 3 applications and run the change control between them.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
Building Safety Act 2022, HRB Procedures Regulations 2023, Building Regulations 2010
Signed off by
A Chartered Engineer (CEng)
Scroll

Overview

What is Gateway 2 and Gateway 3 support?

Getting the application right the first time, not the third

The gateways are the three statutory control points the Building Safety Act 2022 placed around higher-risk buildings. Gateway 1 sits at planning, Gateway 2 before construction, Gateway 3 at completion. At Gateway 2 and Gateway 3 the Building Safety Regulator is the building control authority. There is no private building control route and no negotiating your way onto site.

Gateway support means assembling the technical case, testing it against what the regulator actually asks for, submitting it and answering the requests for information that follow. Most refusals are not caused by unsafe design. They are caused by incomplete or inconsistent information across the design package, which is solvable before you submit.

Standards and legislation

Building Safety Act 2022
Created the regime and the three gateways.
HRB Procedures Regulations 2023
Set out the Gateway 2 and Gateway 3 procedures and the change control categories.
Building Regulations 2010, regs 11A to 11Q
The dutyholder and competence requirements for the client, principal designer and principal contractor.
Fire Safety Order 2005
Keeps the Responsible Person answerable for the systems the design relied upon once the building is occupied.

Who

Who needs Gateway 2 and Gateway 3 support

Which buildings and which works are caught

01

Higher-risk buildings under construction

At least 18 metres or at least seven storeys, containing at least two residential units, in England. Height is measured to the floor surface of the top storey, excluding rooftop plant.

02

Care homes and hospitals meeting the height test

In scope for the design and construction gateways even though they are excluded from the in-occupation duties.

03

Conversions and change of use

Works that create a higher-risk building where there was not one before.

04

Works to existing higher-risk buildings

Internal alterations and external wall remediation where building control approval is required.

05

The change control period

Every project between Gateway 2 approval and the Gateway 3 completion certificate.

Scope

What Gateway 2 and Gateway 3 support covers

Everything between a design package and an approval

  1. 01A pre submission readiness review scored package by package
  2. 02Preparation and assembly of the Gateway 2 building control approval application
  3. 03The fire and emergency file and the construction control plan, written consistently with the design
  4. 04Fire strategy interrogation covering escape, compartmentation, external walls and firefighting provision
  5. 05Consistency checking between architectural, structural, mechanical and fire packages
  6. 06Management of requests for information with tracked responses
  7. 07Change control from approval onwards, with categorisation and audit trail
  8. 08The Gateway 3 completion certificate application with as-built evidence

Our process

How the work runs.

  1. 01

    Gap review

    We assess the current design package against the application requirements and issue a written list of what is missing, inconsistent or unevidenced.

  2. 02

    Package build

    We work with your design team to close the gaps and write the compliance narrative.

  3. 03

    Submission and management

    We submit, log the case and handle every request for information with a tracked response.

  4. 04

    Change control

    After approval we categorise every proposed change, route it correctly and keep the record straight through construction.

  5. 05

    Gateway 3

    We assemble the completion evidence, confirm the as-built position matches the approval and submit the completion certificate application.

What you get

  • A pre submission readiness report with a recommended submission date
  • The complete Gateway 2 application in a version controlled index
  • A requests for information log
  • A change control register
  • The Gateway 3 completion certificate application pack
Sheet
FS-07
Fee
Fixed, agreed first

Why us

Engineered in-house, not subcontracted.

01

Accountable

If the package is not ready, we tell you before submission rather than after a refusal. A postponed submission is cheaper than a rejected one.

02

One team, three disciplines

Fire engineering, fire safety and health and safety in-house. The fire strategy, the escape modelling and the compliance narrative are written by people who talk daily.

03

Current standards

Every submission is written to the standards and legislation in force on the day it is issued, with the reasoning set out for the regulator.

04

UK wide

Higher-risk building projects across the UK.

Need gateway 2 and 3 support for a project?

Send us the drawings and we will tell you what the project needs the same day.

Talk to an engineer

Common questions

Gateway 2 and 3 support: your questions, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Building work on the higher-risk building cannot start until the application is approved. This is a hard stop. Some enabling activity may fall outside the definition of building work. That has to be assessed case by case rather than assumed, which we do with you before anyone mobilises.

Gateway 2 and 3 support by sector

All sectors

Guides

Guides on this topic.

Start your gateway 2 and 3 support

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you