Higher-risk buildings, BSR submissions, UK wide
On a higher-risk building the Building Safety Regulator decides when you may start on site and when anyone may move in, which makes a thin application the most expensive delay in the programme. We prepare, submit and defend Gateway 2 and Gateway 3 applications and run the change control between them.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Building Safety Act 2022, HRB Procedures Regulations 2023, Building Regulations 2010
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
Overview
What is Gateway 2 and Gateway 3 support?
Getting the application right the first time, not the third
The gateways are the three statutory control points the Building Safety Act 2022 placed around higher-risk buildings. Gateway 1 sits at planning, Gateway 2 before construction, Gateway 3 at completion. At Gateway 2 and Gateway 3 the Building Safety Regulator is the building control authority. There is no private building control route and no negotiating your way onto site.
Gateway support means assembling the technical case, testing it against what the regulator actually asks for, submitting it and answering the requests for information that follow. Most refusals are not caused by unsafe design. They are caused by incomplete or inconsistent information across the design package, which is solvable before you submit.
Standards and legislation
- Building Safety Act 2022
- Created the regime and the three gateways.
- HRB Procedures Regulations 2023
- Set out the Gateway 2 and Gateway 3 procedures and the change control categories.
- Building Regulations 2010, regs 11A to 11Q
- The dutyholder and competence requirements for the client, principal designer and principal contractor.
- Fire Safety Order 2005
- Keeps the Responsible Person answerable for the systems the design relied upon once the building is occupied.
Who
Who needs Gateway 2 and Gateway 3 support
Which buildings and which works are caught
Higher-risk buildings under construction
At least 18 metres or at least seven storeys, containing at least two residential units, in England. Height is measured to the floor surface of the top storey, excluding rooftop plant.
Care homes and hospitals meeting the height test
In scope for the design and construction gateways even though they are excluded from the in-occupation duties.
Conversions and change of use
Works that create a higher-risk building where there was not one before.
Works to existing higher-risk buildings
Internal alterations and external wall remediation where building control approval is required.
The change control period
Every project between Gateway 2 approval and the Gateway 3 completion certificate.
Scope
What Gateway 2 and Gateway 3 support covers
Everything between a design package and an approval
- 01A pre submission readiness review scored package by package
- 02Preparation and assembly of the Gateway 2 building control approval application
- 03The fire and emergency file and the construction control plan, written consistently with the design
- 04Fire strategy interrogation covering escape, compartmentation, external walls and firefighting provision
- 05Consistency checking between architectural, structural, mechanical and fire packages
- 06Management of requests for information with tracked responses
- 07Change control from approval onwards, with categorisation and audit trail
- 08The Gateway 3 completion certificate application with as-built evidence
Our process
How the work runs.
- 01
Gap review
We assess the current design package against the application requirements and issue a written list of what is missing, inconsistent or unevidenced.
- 02
Package build
We work with your design team to close the gaps and write the compliance narrative.
- 03
Submission and management
We submit, log the case and handle every request for information with a tracked response.
- 04
Change control
After approval we categorise every proposed change, route it correctly and keep the record straight through construction.
- 05
Gateway 3
We assemble the completion evidence, confirm the as-built position matches the approval and submit the completion certificate application.
What you get
- A pre submission readiness report with a recommended submission date
- The complete Gateway 2 application in a version controlled index
- A requests for information log
- A change control register
- The Gateway 3 completion certificate application pack
- Sheet
- FS-07
- Fee
- Fixed, agreed first
Why us
Engineered in-house, not subcontracted.
Accountable
If the package is not ready, we tell you before submission rather than after a refusal. A postponed submission is cheaper than a rejected one.
One team, three disciplines
Fire engineering, fire safety and health and safety in-house. The fire strategy, the escape modelling and the compliance narrative are written by people who talk daily.
Current standards
Every submission is written to the standards and legislation in force on the day it is issued, with the reasoning set out for the regulator.
UK wide
Higher-risk building projects across the UK.
Need gateway 2 and 3 support for a project?
Send us the drawings and we will tell you what the project needs the same day.
Common questions
Gateway 2 and 3 support: your questions, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsBuilding work on the higher-risk building cannot start until the application is approved. This is a hard stop. Some enabling activity may fall outside the definition of building work. That has to be assessed case by case rather than assumed, which we do with you before anyone mobilises.
Gateway 2 and 3 support by sector
All sectorsGuides
Guides on this topic.
Keep reading
Related services

Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Building Safety Case Reports
Building Safety Act 2022, England
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Regulation 38 Fire Safety Information
Building Regulations 2010 regulation 38, England and Wales
Read moreStart your gateway 2 and 3 support
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote