Knowledge hub
Everything we are asked about fire strategies, fire engineering and the Building Safety Act, grouped by service. If your question is not here, ask and we will answer it directly.
Jump to
- 01Fire strategy basics
- 02Fire Strategy Reports
- 03Retrospective Fire Strategy
- 04Fire Strategy Plans and Drawings
- 05Planning Fire Statements and Gateway 1
- 06Fire Engineering
- 07Smoke Control and Evacuation Modelling
- 08Gateway 2 and Gateway 3 Support
- 09Building Safety Case Reports
- 10Regulation 38 Fire Safety Information
- 11Fire Strategy Review and Peer Review
Fire strategy basics
A fire strategy report is a technical document that sets out how a building is designed, built and managed to be safe from fire. It covers the means of escape, compartmentation, structural fire protection, detection and alarm, smoke control, firefighting access and the management arrangements the building relies on. It is written at the design stage and updated whenever the building changes.
Fire Strategy Reports
Service pageIdeally from RIBA Stage 2 so fire safety shapes the design rather than fighting it later. The strategy then develops through Stage 3 and Stage 4 and is finalised as an as-built document at handover. On higher-risk buildings a fire statement is also needed at planning for Gateway 1.
Retrospective Fire Strategy
Service pageFor an occupied higher-risk building in England the Accountable Person needs a safety case and the fire strategy is normally its foundation. For other buildings there is no explicit duty to produce one but the Responsible Person must have the information to manage fire safety and a fire risk assessor will expect to see the design intent. In practice many existing buildings need one.
Fire Strategy Plans and Drawings
Service pageYes. Where a strategy already exists we can produce or update the plans as a standalone deliverable, for example for coordination during construction or to complete a Regulation 38 pack. We will tell you if the existing strategy itself needs revisiting first.
Planning Fire Statements and Gateway 1
Service pageNo. The national requirement applies to relevant buildings, meaning two or more dwellings or educational accommodation at 18 metres or more or seven or more storeys. In London, Policy D12(B) separately applies to all major development whatever the height. We check the threshold for you at the start.
Fire Engineering
Service pageFire engineering applies science, data and engineering principles to design buildings that achieve an equal or better level of fire safety than standard code guidance would give. It allows safe, flexible and cost efficient solutions for complex designs where a simple code comparison does not fit.
Smoke Control and Evacuation Modelling
Service pageWhen the geometry, the ventilation interaction or the design fire cannot be resolved by hand calculation or a zone model. Atria, complex car parks and unusual smoke shaft arrangements are the common cases. Where a simpler calculation gives a defensible answer, CFD adds cost and programme without adding certainty. We will say so.
Gateway 2 and Gateway 3 Support
Service pageBuilding work on the higher-risk building cannot start until the application is approved. This is a hard stop. Some enabling activity may fall outside the definition of building work. That has to be assessed case by case rather than assumed, which we do with you before anyone mobilises.
Building Safety Case Reports
Service pageOccupied higher-risk buildings, meaning those at least 18 metres tall or with at least seven storeys, containing at least two residential units, in England. Care homes, hospitals, hotels, secure residential institutions and military barracks are excluded from this in-occupation regime.
Regulation 38 Fire Safety Information
Service pageNo. It does not apply to a single private dwellinghouse because the Fire Safety Order does not apply to domestic premises occupied as a private dwelling. Everything else the Order touches is in scope, including the common parts of blocks of flats.
Fire Strategy Review and Peer Review
Service pageIf you want us to. Often the most efficient route is for the original author to address the findings. Where that is not possible we can revise the strategy or issue an addendum and where the strategy is beyond saving we can produce a new one.
Still have a question?
Ask an engineer directly
Describe the building and the sticking point. We will tell you plainly what it needs and what it does not.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply