Building Regulations 2010 regulation 38, England and Wales
Regulation 38 is the point where a building's fire design is handed to the people who have to live with it. It is also the duty most often skipped, which is why so many Responsible Persons manage a building they have never been told how to operate. We compile, review and reconstruct Regulation 38 fire safety information.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Building Regulations 2010, Approved Document B, Fire Safety Order 2005
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
Overview
What is Regulation 38 fire safety information?
The building explaining itself to whoever runs it next
Regulation 38 of the Building Regulations 2010 requires the person carrying out building work to give the Responsible Person information about the fire safety design of the building. The regulation defines it as information relating to the design and construction of the building and to the services, fittings and equipment in it, which will assist the Responsible Person to operate and maintain the building with reasonable safety.
In practice that is a pack. As-built plans marked with escape routes and compartment lines, the fire strategy and its assumptions, equipment specifications and commissioning records and the management arrangements the design relied upon. It is the difference between running a building and guessing at one.
The England version was amended with effect from 1st October 2023. The Responsible Person must now give a notice acknowledging receipt and confirming the information is sufficient. The person carrying out the work must then notify building control, usually within 5 days of handover. The handover now has to be evidenced as well as made. Approved Document B was updated to match from 2nd March 2025. Wales has had the same acknowledgement and notice since 1st July 2026.
Standards and legislation
- Building Regulations 2010, regulation 38
- Applies where work consists of or includes the erection or extension of a relevant building or a relevant change of use.
- Approved Document B, Volume 1 Section 17 and Volume 2 Section 19
- England guidance on the fire safety information to hand over, revised from 2nd March 2025. In Wales the equivalent guidance is Appendix G of the Welsh Approved Document B Volume 2.
- Fire Safety Order 2005
- Defines the Responsible Person who must receive the information and who must then manage the building with it.
- Building Safety Act 2022
- For higher-risk buildings the pack feeds the golden thread and the safety case.
Who
Who needs Regulation 38 information
Anyone completing work on a building the Fire Safety Order touches
New build
Any relevant building, meaning one the Regulatory Reform (Fire Safety) Order 2005 applies to or will apply to once the work is finished.
Extensions and alterations
Extensions to existing offices, schools, care homes, hotels, retail units and industrial buildings.
Blocks of flats
Where the Fire Safety Order reaches the common parts, the structure and the external walls.
Change of use
An office converted to residential or a house converted to an HMO, for example.
Clients taking handover
Who suspect the pack they were given is a box of operation and maintenance manuals with no fire content.
Responsible Persons of existing buildings
Who have discovered at the fire risk assessment stage that no pack exists.
Contents
What a Regulation 38 pack contains
Everything the Responsible Person needs to run the building safely
- 01As-built fire strategy plans marked with escape routes and compartment lines
- 02The fire strategy and the assumptions it relies on
- 03Specifications for fire doors, dampers, fire stopping and fire resisting construction
- 04Detection, alarm, emergency lighting, suppression and smoke control specifications
- 05Commissioning certificates and cause and effect records
- 06The management arrangements the design depends on
- 07The acknowledgement and notification required in England since 1st October 2023 and in Wales since 1st July 2026
Our process
How the work runs.
- 01
Scope
We agree what the pack must contain for this building and this handover.
- 02
Collect
We gather drawings, specifications, certificates and records from the design team and contractor.
- 03
Review and fill
We check the pack against the fire strategy, flag what is missing and reconstruct what can be reconstructed from survey.
- 04
Hand over
We issue a structured, indexed pack and the acknowledgement record that proves it was given.
What you get
- A structured, indexed Regulation 38 pack
- As-built fire strategy plans
- A completeness statement listing anything that could not be recovered
- The acknowledgement and notification record
- Sheet
- FS-09
- Fee
- Fixed, agreed first
Why us
Engineered in-house, not subcontracted.
Written by the strategy author
Where we produced the fire strategy, the handover pack is a natural continuation of it rather than a separate exercise.
Reconstruction from survey
Where the pack never existed, our surveyors can rebuild the fire content from the building itself.
Honest about gaps
Where information cannot be recovered we say so in writing rather than leave a hole in the record.
England and Wales
Any relevant building in England or Wales. Scotland uses the Fire Safety Design Summary instead.
Need regulation 38 information for a project?
Send us the drawings and we will tell you what the project needs the same day.
Common questions
Regulation 38 information: your questions, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsNo. It does not apply to a single private dwellinghouse because the Fire Safety Order does not apply to domestic premises occupied as a private dwelling. Everything else the Order touches is in scope, including the common parts of blocks of flats.
Regulation 38 information by sector
All sectorsGuides
Guides on this topic.
Keep reading
Related services

Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Building Safety Case Reports
Building Safety Act 2022, England
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read moreStart your regulation 38 information
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver