Building Regulations 2010 regulation 38, England and Wales

Regulation 38 is the point where a building's fire design is handed to the people who have to live with it. It is also the duty most often skipped, which is why so many Responsible Persons manage a building they have never been told how to operate. We compile, review and reconstruct Regulation 38 fire safety information.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
Building Regulations 2010, Approved Document B, Fire Safety Order 2005
Signed off by
A Chartered Engineer (CEng)
Scroll

Overview

What is Regulation 38 fire safety information?

The building explaining itself to whoever runs it next

Regulation 38 of the Building Regulations 2010 requires the person carrying out building work to give the Responsible Person information about the fire safety design of the building. The regulation defines it as information relating to the design and construction of the building and to the services, fittings and equipment in it, which will assist the Responsible Person to operate and maintain the building with reasonable safety.

In practice that is a pack. As-built plans marked with escape routes and compartment lines, the fire strategy and its assumptions, equipment specifications and commissioning records and the management arrangements the design relied upon. It is the difference between running a building and guessing at one.

The England version was amended with effect from 1st October 2023. The Responsible Person must now give a notice acknowledging receipt and confirming the information is sufficient. The person carrying out the work must then notify building control, usually within 5 days of handover. The handover now has to be evidenced as well as made. Approved Document B was updated to match from 2nd March 2025. Wales has had the same acknowledgement and notice since 1st July 2026.

Standards and legislation

Building Regulations 2010, regulation 38
Applies where work consists of or includes the erection or extension of a relevant building or a relevant change of use.
Approved Document B, Volume 1 Section 17 and Volume 2 Section 19
England guidance on the fire safety information to hand over, revised from 2nd March 2025. In Wales the equivalent guidance is Appendix G of the Welsh Approved Document B Volume 2.
Fire Safety Order 2005
Defines the Responsible Person who must receive the information and who must then manage the building with it.
Building Safety Act 2022
For higher-risk buildings the pack feeds the golden thread and the safety case.

Who

Who needs Regulation 38 information

Anyone completing work on a building the Fire Safety Order touches

01

New build

Any relevant building, meaning one the Regulatory Reform (Fire Safety) Order 2005 applies to or will apply to once the work is finished.

02

Extensions and alterations

Extensions to existing offices, schools, care homes, hotels, retail units and industrial buildings.

03

Blocks of flats

Where the Fire Safety Order reaches the common parts, the structure and the external walls.

04

Change of use

An office converted to residential or a house converted to an HMO, for example.

05

Clients taking handover

Who suspect the pack they were given is a box of operation and maintenance manuals with no fire content.

06

Responsible Persons of existing buildings

Who have discovered at the fire risk assessment stage that no pack exists.

Contents

What a Regulation 38 pack contains

Everything the Responsible Person needs to run the building safely

  1. 01As-built fire strategy plans marked with escape routes and compartment lines
  2. 02The fire strategy and the assumptions it relies on
  3. 03Specifications for fire doors, dampers, fire stopping and fire resisting construction
  4. 04Detection, alarm, emergency lighting, suppression and smoke control specifications
  5. 05Commissioning certificates and cause and effect records
  6. 06The management arrangements the design depends on
  7. 07The acknowledgement and notification required in England since 1st October 2023 and in Wales since 1st July 2026

Our process

How the work runs.

  1. 01

    Scope

    We agree what the pack must contain for this building and this handover.

  2. 02

    Collect

    We gather drawings, specifications, certificates and records from the design team and contractor.

  3. 03

    Review and fill

    We check the pack against the fire strategy, flag what is missing and reconstruct what can be reconstructed from survey.

  4. 04

    Hand over

    We issue a structured, indexed pack and the acknowledgement record that proves it was given.

What you get

  • A structured, indexed Regulation 38 pack
  • As-built fire strategy plans
  • A completeness statement listing anything that could not be recovered
  • The acknowledgement and notification record
Sheet
FS-09
Fee
Fixed, agreed first

Why us

Engineered in-house, not subcontracted.

01

Written by the strategy author

Where we produced the fire strategy, the handover pack is a natural continuation of it rather than a separate exercise.

02

Reconstruction from survey

Where the pack never existed, our surveyors can rebuild the fire content from the building itself.

03

Honest about gaps

Where information cannot be recovered we say so in writing rather than leave a hole in the record.

04

England and Wales

Any relevant building in England or Wales. Scotland uses the Fire Safety Design Summary instead.

Need regulation 38 information for a project?

Send us the drawings and we will tell you what the project needs the same day.

Talk to an engineer

Common questions

Regulation 38 information: your questions, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

No. It does not apply to a single private dwellinghouse because the Fire Safety Order does not apply to domestic premises occupied as a private dwelling. Everything else the Order touches is in scope, including the common parts of blocks of flats.

Regulation 38 information by sector

All sectors

Guides

Guides on this topic.

Start your regulation 38 information

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.