How battery storage sites are approved
Grid scale battery energy storage systems (BESS) are approved through the planning system. The National Fire Chiefs Council (NFCC) guidance on grid scale energy storage system planning (opens in a new tab) says that as infrastructure projects they "progress via a planning application route for approval". They are not dealt with through Building Regulations consultations unless there are ancillary buildings on site which may be covered. Building work on control or welfare buildings on a BESS site may therefore need to comply with the Building Regulations.
BESS sites are not nationally significant infrastructure projects. The Infrastructure Planning (Electricity Storage Facilities) Order 2020 (opens in a new tab), in force from 2nd December 2020, removed electricity storage facilities other than pumped hydroelectric storage from the category of generating stations that need development consent. The House of Commons Library, Parliament's research service, said in a briefing published on 23rd June 2025 that decisions on BESS in England and Wales are made by local planning authorities regardless of capacity.
The same briefing notes that no single piece of legislation sets specific requirements for BESS sites and that a framework of relevant legislation applies instead. In England, paragraph 033 of the government's planning practice guidance on renewable and low carbon energy (opens in a new tab) says applications for lithium-ion BESS are subject to the Town and Country Planning (Development Management Procedure) (England) Order 2015. The National Planning Policy Framework, last updated on 29th September 2026, counts BESS as low carbon energy storage. Our fire engineering service prepares the fire safety material that supports a BESS application.
The NFCC guidance on grid scale BESS
The NFCC publishes guidance for fire and rescue services on grid scale BESS planning. Its web page says the current guidance "was approved for publication in December 2025". It replaces the guidance first published in 2023, described as version 1, which the NFCC consulted on during 2024.
The guidance covers BESS "deployed in open air environments, with an energy capacity of one megawatt hour (MWh) or greater using lithium variant batteries". Domestic systems (it names PAS 63100:2024 for those) and mobile and temporary systems are outside its scope. It is written for fire and rescue services across the UK. Services in the devolved administrations are told to consult their own equivalent legislation.
The guidance is not a checklist. It says local planning authorities "should, therefore, not use the guidance as a mandatory set of recommendations" and should prioritise discussions with the local fire and rescue service. The NFCC's October 2025 position statement on BESS (opens in a new tab) says the guidance is often mistakenly seen as prescriptive rather than as a set of initial considerations for fire services.
Its 20 sections run from scope, principles and fire service organisation through the planning process, information requirements, system design, battery chemistry, detection, suppression, explosion control, access, spacing, site conditions, water supplies and signage to the outline battery safety management plan, site plans, environmental impacts, recovery and an incident event database. Its ten principles are adapted from those of the Country Fire Authority in Victoria. They include siting to reduce hazards to responders, safe access, "Provision of adequate water supply and firefighting infrastructure" and site-specific emergency planning.
Is the fire service a statutory consultee on BESS?
In England it is not. The NFCC guidance says "the fire and rescue service are not a statutory consultee in planning applications for BESS sites". The NFCC position statement goes further and says fire and rescue services are not statutory consultees "and are not seeking to become one". It also notes there is no duty on those receiving fire service comments to show how they have addressed the concerns raised.
Planning practice guidance in England fills part of the gap. Paragraph 034 encourages applicants for BESS of 1 MWh or more, other than systems associated with a dwelling, to engage the local fire and rescue service before applying. That lets siting, the prevention of the impact of thermal runaway and emergency services access be considered early. Paragraph 035 encourages the local planning authority to consult the fire and rescue service during the formal period of public consultation. The BESS section was added on 14th August 2023.
In the House of Lords on 26th February 2026 a government minister said the planning practice guidance "has been updated to ensure that developers consult fire services". The minister added that the fire service considers statutory consultee status "would prove enormously bureaucratic". Hansard (opens in a new tab), Parliament's official report, records the exchange. As read on 23rd November 2026, the planning practice guidance page shows no update since 14th August 2023.
A private member's bill, the Battery Energy Storage Systems (Fire Safety) Bill, was presented in the House of Commons in Session 2024-26 and had its first reading on 21st October 2024. Its long title is to make fire and rescue authorities statutory consultees for planning applications relating to BESS. As read on 23rd November 2026, Parliament's bill page (opens in a new tab), last updated on 30th April 2026, lists second reading as the next stage with the date to be announced. A bill does not change the law unless it is passed.
| Nation | Who decides | Fire and rescue service position |
|---|---|---|
| England | The local planning authority, whatever the capacity | Not a statutory consultee. Planning practice guidance encourages early engagement and consultation for systems of 1 MWh or more |
| Wales | The local planning authority, whatever the capacity | A statutory consultee for listed types of development, including sites of 1 hectare or more and buildings creating 1,000 square metres or more of floor space. The list is not specific to BESS |
| Scotland | The planning authority for 50 MW or less. Scottish Ministers under section 36 of the Electricity Act 1989 above 50 MW | The Scottish Fire and Rescue Service is not a statutory consultee for planning or section 36 applications |
In Wales the duty comes from the Development Procedure (Consultees) (Wales) (Miscellaneous Amendments) Order 2021 and applies to applications validated on or after 25th April 2022. Whether a BESS site is caught depends on its site area or floor space. The Welsh Government guidance (opens in a new tab) sets out the full list.
Scotland has its own BESS planning guidance (opens in a new tab), published on 19th March 2026 with input from bodies including the Scottish Fire and Rescue Service. It treats grid scale as more than 1 MW. Our guide to whether a planning application needs a fire statement covers the wider planning tests.
Spacing, stacking and site layout
Section 12 of the NFCC guidance deals with spacing. It proposes "an initial minimum distance of 30m" between occupied buildings and BESS cabinets or associated infrastructure such as transformers and switchgear. That distance applies before any mitigation such as blast walls is considered. It is based on the 100ft distance for remote installations cited in NFPA 855:2023.
Between units, spacing can come down if testing such as UL 9540A shows that fire does not spread between cabinets. In that case the guidance says separation can be reduced to a minimum of 3ft or 0.914m, as set out in NFPA 855. Where containment to the unit of origin cannot be shown, it refers to the NFPA 855 separation distances. It adds that a suppression system "is unlikely to compensate for reduced spacing between BESS".
Other layout points in the guidance are listed here.
- The NFCC does not support vertical stacking of containers or BESS cabinets.
- Areas within 3 metres of BESS cabinets should be kept clear of combustible vegetation.
- Site plans should show ignition sources, which should be a minimum of 6 metres from combustible waste.
- The emergency response plan should assume the fire will not spread beyond the BESS container of origin, with fire and rescue operations limited to boundary cooling of surrounding BESS and monitoring the unit involved.
The last point explains why spacing matters so much. The NFCC position statement says the prevailing view on tactics is a "controlled burn" to minimise run-off while protecting the surrounding area. That approach relies on neighbouring units being far enough apart to be protected by cooling.
Water supplies and fire service access
Section 14 explains why water comes first. A fire appliance carries approximately 1,800 to 2,000 litres, which can be exhausted in under five minutes. The guidance says "an additional on-site water supply must be accessible". Hydrants should achieve a flow rate of no less than 25 litres per second at any hydrant on the site.
Where that flow cannot be achieved, the guidance asks for an equivalent static supply that provides the same flow rate for 120 minutes. It says this equates to approximately 180,000 litres. Static tanks should be at least 10 metres from any BESS container or cabinet, clearly signed and accessible to appliances.
The water need can fall. If the manufacturer's tactic is to boundary cool and let the unit consume itself, the guidance says water and drainage requirements may reduce significantly. Even without water suppression it says local water sources will always be needed for exposure protection.
For access, section 11 says there is "an absence of guidance" on fire service access to BESS sites. It suggests the principles in Approved Document B in support of requirement B5 may assist, as broad principles only. It reproduces Table 15.2 of Approved Document B Volume 2 (opens in a new tab), shown below. It also says vehicles should not reverse more than 20 metres. It prefers either an alternative access point that takes account of wind direction or a perimeter loop road.
| Item | Pump appliance | High reach appliance |
|---|---|---|
| Minimum road width between kerbs | 3.7 metres | 3.7 metres |
| Minimum width of gateways | 3.1 metres | 3.1 metres |
| Minimum turning circle between kerbs | 16.8 metres | 26.0 metres |
| Minimum turning circle between walls | 19.2 metres | 29.0 metres |
| Minimum clearance height | 3.7 metres | 4.0 metres |
| Minimum carrying capacity | 12.5 tonnes | 17.0 tonnes |
Detection, suppression and explosion control
Section 8 asks for early fault detection that allows remote disconnection, for example through a battery management system. It says appropriate automatic detection such as smoke, gas or radiant heat detectors should be provided in all BESS, together with continuous combustible gas monitoring within cabinets and enclosures. Gas detectors should raise an alarm, shut down the BESS and initiate full exhaust ventilation. Off-gas detection should not be relied on alone.
Section 9 is clear about what suppression can and cannot do. Suppression may use inert gas, aerosol or water. The guidance says the type should be dictated by the battery technology used and not by site conditions or constraints. Gaseous suppression should not be used to make up for a lack of available and accessible water supplies.
Suppression "will have little effect on a thermal event within the battery cell". Its function is to help prevent propagation from cell to cell. Gaseous systems have limited cooling ability and cannot suppress thermal runaway. The guidance notes it is becoming increasingly common for BESS to be designed and manufactured without any suppression system. All claims about the performance of a suppression system need appropriate evidence for that specific use case.
Gaseous discharge carries its own risk. The guidance says it can contribute to the formation of an explosive vapour cloud, as in the McMicken incident in Surprise, Arizona in 2019.
Section 10 says BESS containers should be fitted with explosion protection or deflagration venting appropriate to the hazard and battery technology. It names BS EN 16009, BS EN 14373, BS EN 14797, NFPA 68 and NFPA 69 as ways to evidence that protection. Exhaust systems designed to prevent deflagration should keep the environment below 25 percent of the lower explosive limit.
What the fire service will ask for
Section 6 of the guidance lists questions a fire and rescue service may ask before an application is made. It says ultimate responsibility for safe design and running rests with the developer and operator. It is the responsibility of the applicant, developer, designer or manufacturer to provide the information, with appropriate evidence to support any claims made on performance. The answers help the service build an emergency response plan.
The questions cover thermal events and deflagration, including whether equipment has full-scale fire testing or UL 9540A certification. They cover site plans, firefighting assumptions, water supply and run-off, including whether water is intended for boundary cooling, defensive firefighting or active suppression. They also cover BESS design and competence, detection and monitoring and environmental receptors.
Section 16 sets out what an outline battery safety management plan should contain.
- How the fire and rescue service will be alerted.
- A description of the facility.
- A site plan of key infrastructure, including access points, internal roads, water tanks, pumps, hydrants, drainage and neighbouring properties.
- Details of the emergency response coordinator.
- Safe access for emergency vehicles.
- Warning systems and alarm annunciators.
- The hazards and how they are managed.
- The role of the fire and rescue service at incidents.
- Where emergency shutoffs or isolators are located.
Section 17 asks site plans to show the layout, hazardous material storage, separation distances, access routes, hydrants, water supplies, drainage and fire water containment. They should also show "all sensitive receptors within a 1km radius of the site" and a compass rose showing north and the prevailing wind direction.
Sections 18 and 19 cover the containment of water run-off, flood mitigation for sites in flood zones and a post-incident recovery plan. The recovery plan deals with re-ignition, de-energising and the disposal of damaged equipment and contaminated fire water. The guidance says any incident may last several hours. The NFCC position statement records that a fire in Liverpool in 2020 lasted 3 days. In the Lords on 26th February 2026 the minister said there had been four grid scale battery fires in Great Britain in the last five years.
Health and safety law, permits and what may change
Health and safety law applies whatever the planning position. The Health and Safety Executive (opens in a new tab) says anyone who designs, installs or operates BESS has a legal responsibility to comply with health and safety legislation, including the laws listed here. The page applies in Great Britain.
- The Health and Safety at Work Act.
- The Dangerous Substances and Explosive Atmospheres Regulations, which set minimum requirements for protecting workers and others from fire and explosion risks.
- The Electricity at Work Regulations.
- The Management of Health and Safety at Work Regulations.
- The Construction (Design and Management) Regulations.
- The Dangerous Substances (Notification and Marking of Sites) Regulations.
Under the last of these, HSE says the operator of a BESS site holding 25 tonnes or more of dangerous substances must notify the local fire and rescue service and display signs. HSE describes its own role in planning as limited to proposals within known consultation zones around major hazard establishments, major accident hazard pipelines and licensed explosives sites. Environmental permits are a matter for Defra in England and for the Scottish and Welsh Governments.
The Department for Energy Security and Net Zero published guidance on health and safety in grid scale electrical energy storage systems (opens in a new tab) on 18th April 2024. It is non-exhaustive good practice guidance for systems rated at 1 MW and greater. It says the local fire and rescue service should be consulted primarily at the design and planning stage to understand emergency response requirements. The emergency response plan should be made available to the service for review and stored in a clearly marked location on site.
Change is planned in England. Defra's government response on modernising environmental permitting (opens in a new tab), updated on 15th April 2026, says it will proceed with further detailed policy work on including BESS as an activity in the Environmental Permitting Regulations. It plans a consultation covering BESS among other priority policies in early 2027. That is a plan and not a rule in force.
Our fire engineering service prepares fire safety strategies for BESS sites and the buildings around them. Our guide to data centre fire safety covers battery rooms and plant inside buildings.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- NFCC: Grid scale energy storage system planning, guidance for fire and rescue services (official source, opens in a new tab)
- NFCC Position Statement: Battery Energy Storage Systems (official source, opens in a new tab)
- Planning practice guidance: Renewable and low carbon energy (GOV.UK) (official source, opens in a new tab)
- HSE: Grid-scale battery energy storage systems (official source, opens in a new tab)
- Health and safety in grid scale electrical energy storage systems (DESNZ) (official source, opens in a new tab)
- The Infrastructure Planning (Electricity Storage Facilities) Order 2020 (SI 2020/1218) (official source, opens in a new tab)
- Industrial emissions: modernising environmental permitting, government response (Defra) (official source, opens in a new tab)
- Battery Energy Storage Systems: planning guidance (Scottish Government, 19th March 2026) (official source, opens in a new tab)
- Fire and Rescue Authorities as Statutory Consultees: Welsh Government guidance (official source, opens in a new tab)
- House of Commons Library briefing CBP-7621 on battery energy storage systems (UK Parliament) (official source, opens in a new tab)
- Hansard, House of Lords, 26th February 2026: Fire and Rescue Services: Clean Energy Projects (UK Parliament) (official source, opens in a new tab)
- Battery Energy Storage Systems (Fire Safety) Bill (UK Parliament) (official source, opens in a new tab)
- Approved Document B: Fire safety, Volume 2 (England) (official source, opens in a new tab)