Licensed and unlicensed HMOs, conversions
An HMO is a house being asked to behave like a block of flats. The fire strategy has to reconcile domestic construction with shared escape routes, sleeping occupants who may not know each other and licensing conditions that vary by council.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Approved Document B Volume 1, LACORS housing fire safety guidance, Housing Act 2004
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
What makes this sector different
What a fire strategy for HMOs has to answer.
Conversions
A house converted to bedsits or a shop with flats above rarely has the compartmentation or protected route the guidance assumes.
Licensing conditions
Local housing authorities impose fire precautions as licence conditions. The strategy has to meet them and the Fire Safety Order at the same time.
Detection and alarm grades
Choosing the right grade and category of alarm for the layout and the number of occupants.
Change of use
Converting to an HMO is a material change of use and triggers Regulation 38 as well as Building Regulations approval.
Evacuation strategy
How evacuation works in an HMO
An HMO relies on early warning and a protected route. Every bedroom door opens onto an escape route that leads to a final exit. The route is kept free of fire load and enclosed in fire resisting construction. The alarm sounds throughout the house and occupants leave together when it does.
Larger and higher risk HMOs add to that. Bedsits with cooking in the room, houses of three storeys or more and layouts with inner rooms usually need a higher grade of alarm system, fire doors with self closers and sometimes a second way out. The strategy explains which measures apply to the layout and why. That gives the landlord and the licensing officer the same reference.
Our approach
How we write a fire strategy for HMOs.
We produce proportionate strategies for HMOs that landlords can act on and licensing officers can accept. For conversions we set out the compartmentation, the protected route and the alarm provision the Building Regulations require and we coordinate with the housing authority's conditions.
Typical deliverables
- Fire strategy report and plans
- Alarm and detection specification
- Regulation 38 pack on completion
- Support with licensing conditions
Standards and guidance
Fire safety guidance for HMOs
- Approved Document B Volume 1 (official source, opens in a new tab)
- Applies when a house is converted. A change to an HMO is a material change of use and the work has to meet the Building Regulations.
- LACORS housing fire safety guidance
- The national guide most councils use to judge fire precautions in existing HMOs, with worked examples for common layouts.
- Housing Act 2004 (official source, opens in a new tab)
- Brings in HMO licensing and the housing health and safety rating system, under which the council can require fire safety works.
- Fire Safety Order 2005 (official source, opens in a new tab)
- Applies to the shared parts of an HMO, including the escape route. It requires a fire risk assessment of those parts.
Common questions
Fire strategy questions on HMOs, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsAny conversion needs Building Regulations approval and the fire safety design should be set out. For a licensed HMO the licence conditions and the Fire Safety Order both apply. A short, clear strategy settles both and gives the fire risk assessor the design intent.
Guides
Guides for HMOs.
What we deliver
Services for HMOs.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Regulation 38 Fire Safety Information
Building Regulations 2010 regulation 38, England and Wales
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreOther sectors
All sectorsFire strategy for HMOs
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply