What is London Plan Policy D12?
Policy D12 Fire safety is part of the London Plan 2021 (opens in a new tab), the statutory spatial development strategy for Greater London prepared by the Mayor. The plan was published on 2nd March 2021. The GLA describes D12 as the first London Plan policy to address fire safety at the planning application stage.
The policy has two parts. Part A sets six fire safety criteria that all development proposals must meet. Part B says all major development proposals should be submitted with a Fire Statement. Our planning fire statements service prepares D12 material alongside the national Gateway 1 form where a scheme needs both.
D12 applies in Greater London only. It sits on top of the national planning rules that apply across England. Outside London it has no effect.
D12 does not replace the Building Regulations. The supporting text says fire safety compliance is covered by Part B of the Building Regulations. It asks applicants to consider fire safety before the building control application stage so that the highest standards of fire safety are designed in from the start. In practice that means the site layout, the cores and the fire service access are settled with fire safety in mind before the planning drawings are fixed.
What D12(A) asks of every development
Part A applies to all development proposals, whatever their size. It opens: "In the interests of fire safety and to ensure the safety of all building users, all development proposals must achieve the highest standards of fire safety and ensure that they:". The six criteria, A1 to A6, follow in the policy's order and close to its wording.
- A1: identify suitably positioned unobstructed outside space for fire appliances to be positioned on and appropriate for use as an evacuation assembly point.
- A2: are designed to incorporate appropriate features which reduce the risk to life and the risk of serious injury in the event of a fire, including appropriate fire alarm systems and passive and active fire safety measures.
- A3: are constructed in an appropriate way to minimise the risk of fire spread.
- A4: provide suitable and convenient means of escape and associated evacuation strategy for all building users.
- A5: develop a strategy for evacuation which can be periodically updated and published and which all building users can have confidence in.
- A6: provide suitable access and equipment for firefighting which is appropriate for the size and use of the development.
The supporting text adds detail. Applicants should show on a site plan where fire appliances will be positioned and keep those spaces clear of obstructions and conflicting uses. The site plan should also show evacuation assembly points. Floor layouts and cores should be planned around fire safety and evacuation from the outset, which the plan says is of particular importance in blocks of flats.
The plan asks for suppression systems such as sprinklers to be explored at an early stage of design. Stair cores that are suitably sized, provided in sufficient numbers and designed to allow simultaneous evacuation should also be explored early and provided wherever possible. Fire safety and security measures should be considered together so that security does not conflict with means of escape or fire service access.
Refurbishment that requires planning permission is subject to London Plan policy. Where refurbishment does not need permission, the Mayor still expects steps to be taken to make sure existing buildings are safe.
What a D12(B) Fire Statement should cover
Part B reads: "All major development proposals should be submitted with a Fire Statement, which is an independent fire strategy, produced by a third party, suitably qualified assessor." It goes on: "The statement should detail how the development proposal will function in terms of:". The six matters, B1 to B6, follow in the policy's order and close to its wording.
- B1: the building's construction: methods, products and materials used, including manufacturers' details.
- B2: the means of escape for all building users: suitably designed stair cores, escape for building users who are disabled or require level access and associated evacuation strategy approach.
- B3: features which reduce the risk to life: fire alarm systems, passive and active fire safety measures and associated management and maintenance plans.
- B4: access for fire service personnel and equipment: how this will be achieved in an evacuation situation, water supplies, provision and positioning of equipment, firefighting lifts, stairs and lobbies, any fire suppression and smoke ventilation systems proposed and the ongoing maintenance and monitoring of these.
- B5: how provision will be made within the curtilage of the site to enable fire appliances to gain access to the building.
- B6: ensuring that any potential future modifications to the building will take into account and not compromise the base build fire safety/protection measures.
Major development has the meaning given in Part 1 of the Town and Country Planning (Development Management Procedure) (England) Order 2015. The London Plan glossary summarises it as 10 or more dwellings or a residential site of 0.5 hectares or more. For other uses it means 1,000 square metres of floor space or more or a site of 1 hectare or more.
There is no height test in Part B. Take a hypothetical four storey block of 12 flats in a London borough. It is major development and needs a D12(B) Fire Statement. It is well below the height at which the national Gateway 1 form applies.
Who can write and assess a D12 Fire Statement?
Paragraph 3.12.9 of the London Plan says Fire Statements should be produced by a third-party independent, suitably-qualified assessor. This should be a qualified engineer with relevant experience in fire safety, such as a chartered engineer registered with the Engineering Council by the Institution of Fire Engineers. It may instead be a suitably qualified and competent professional with the demonstrable experience to address the complexity of the design. The author's competence should be evidenced in the Fire Statement itself.
The GLA's draft guidance sheet on D12(B) Fire Statements (opens in a new tab) went further. It asked authors to show Engineering Council registration as IEng or CEng and registration with the Institution of Fire Engineers, with evidence of training, skills, experience, knowledge and behaviours placed at the start of the statement. That sheet was a draft and was never adopted. The adopted test is the wording of paragraph 3.12.9.
The same paragraph says planning departments could work with suitably qualified and experienced officers in borough building control departments and/or the London Fire Brigade when they evaluate statements. The London Fire Brigade says on its fire engineering consultations page (opens in a new tab) that it might also be consulted at the planning stage where fire service access is limited or where the project is a major development scheme.
D12(A), D12(B) and the Gateway 1 form side by side
D12 is a London policy. The Gateway 1 fire statement is a national requirement in England set by article 9A of the Development Management Procedure Order 2015 (opens in a new tab) for applications made on or after 1st August 2021. In February 2022 the GLA said its draft fire safety guidance was in addition to the government's fire safety considerations, which apply only to a limited number of buildings at the planning application stage.
| Point | D12(A) | D12(B) Fire Statement | Gateway 1 fire statement |
|---|---|---|---|
| Source | London Plan 2021, Policy D12 Part A | London Plan 2021, Policy D12 Part B | Article 9A of the Development Management Procedure Order 2015 |
| Where it applies | Greater London | Greater London | England |
| Which schemes | All development proposals | All major development, whatever the height | Applications involving a building of 18 metres or more or 7 or more storeys with two or more dwellings or educational accommodation. Outline and section 73 applications are exempt. |
| What is submitted | The policy names no document. The supporting text asks for site plans showing fire appliance positions and evacuation assembly points. | A Fire Statement, which the policy describes as an independent fire strategy | A fire statement on the form published by the Secretary of State or a form substantially to the same effect |
| Author | Not set by the policy | A third party, independent, suitably qualified assessor, with competence evidenced in the statement | Not set by law. The form guidance recommends a suitably qualified engineer with relevant experience in fire safety or a suitably qualified and competent professional. |
| Who reviews it | The planning authority as part of its decision | Planning departments, which the plan says could be assisted by borough building control and/or the London Fire Brigade | The planning authority decides, with the Building Safety Regulator as statutory consultee |
Every London scheme is caught by D12(A). A scheme may also be caught by D12(B), by Gateway 1, by both or by neither. A tall block of flats that is also major development falls under both. Each requirement applies in its own right. Plan to provide a D12(B) Fire Statement and the national form. No official source says that one document can serve as both.
The Building Safety Regulator, which comments on the national form, says it assesses against national standards and does not use local planning policy or local standards. Judging compliance with D12 is a matter for the planning authority.
Evacuation lifts under Policy D5
D12 works alongside Policy D5 Inclusive design. Part B(5) of D5 asks development to incorporate safe and dignified emergency evacuation for all building users. In all developments where lifts are installed, at least one lift per core should be a suitably sized fire evacuation lift for people who require level access. Capacity assessments may show that more are needed. The D12 supporting text repeats this requirement. It adds that fire evacuation lifts and associated provisions should be appropriately designed and constructed and should include the necessary controls suitable for the purposes intended.
The plan rejects emergency carry down or carry up devices that rely on manual handling, for reasons of user dignity and independence. It prefers lifts that can be used for evacuation, backed by a management plan. Evacuation lifts affect core sizes and lift specifications. They are a concept stage decision.
Is the Fire Safety London Plan Guidance in force?
The guidance never came into force. The GLA published pre-consultation drafts (opens in a new tab) in March 2021, including draft guidance on D12(A) and a guidance sheet on D12(B) Fire Statements. A consultation draft of the Fire Safety London Plan Guidance was then consulted on from 11th February to 20th June 2022. It set out how applicants should show compliance with Policies D12 and D5(B5) and included template forms.
The March 2021 draft for D12(A) proposed a Planning Fire Safety Strategy (PFSS), which major development would incorporate into its Fire Statement. Where an applicant considered that parts of the policy did not apply, the draft asked for a Reasonable Exception Statement. Both terms come from the draft guidance and not from the adopted policy.
Mayoral Decision MD3515 (opens in a new tab), signed on 9th July 2026 and published on 16th July 2026, withdrew the draft guidance from the date the Draft London Plan was published. It records that the guidance was never formally adopted. It cites significant regulatory changes to fire safety since the 2022 consultation and says the content is addressed in the Draft London Plan.
The GLA's page on the withdrawn guidance (opens in a new tab) confirms that the withdrawal does not affect the status of Policies D5 and D12 of the London Plan 2021. Those policies still apply. The older consultation page still says the GLA is considering responses. That text is out of date.
What the Draft London Plan proposes
A new London Plan is being prepared. The Draft London Plan (opens in a new tab) was consulted on from 16th July to 15th October 2026. The timetable in MD3515 shows submission to the Secretary of State in spring or summer 2027, examination in public in autumn or winter 2027 and the Inspector's report in winter or spring 2028. Formal publication of the new plan is shown for March 2028. The GLA notes that the examination, the report and the Secretary of State's sign-off are outside its direct control.
MD3515 says the current London Plan remains in place until a new London Plan replaces it. The draft's fire policy is MBUL10 Part C. Under it, major developments of any height that provide residential accommodation and/or uses in purpose groups 1 and 2 of Approved Document B should be designed to reduce the risk to life and of serious injury in a fire. They should minimise the risk of fire spread and not incorporate combustible materials in their external wall. A competent fire engineer should confirm in the design and access statement that the proposal meets those two requirements. The online draft text does not use the term Fire Statement.
The draft defines a competent fire engineer as one registered with the Engineering Council as an Incorporated Engineer or Chartered Engineer who is a member of the Institution of Fire Engineers or another fire relevant professional engineering institution. It treats materials rated Class A2-s1,d0 and above as non-combustible. It also says the Mayor will monitor national fire safety requirements and publish a formal statement of supersession when Part C is no longer deemed necessary.
Evacuation lifts move to draft policy MBUL8 B(3). In all new buildings of any height where lifts are installed, at least one lift per core that includes a lift should be a fire evacuation lift. A core with only a stair and no lift needs no evacuation lift. The draft notes that the Building Regulations currently contain no equivalent requirement.
All of this is draft and is not yet policy. The GLA says the Draft London Plan is a material consideration in planning decisions. Its weight can change as it goes through examination. Until a new plan is adopted, D12 and D5 of the London Plan 2021 are the policies to meet.
Mistakes that hold up a D12 submission
The withdrawn draft guidance carries no status. It still shows what GLA officers were checking for when it was written. The points below are drawn from the adopted plan or from that draft, as marked.
- Copying Approved Document B. The draft D12(B) sheet said excerpts from Approved Document B without specific context and references to the proposal do not demonstrate compliance.
- Missing Part A headings. The draft checklist expected a declaration of compliance with D12(A) and information under each criterion A1 to A6 that is specific to the development.
- No lift declaration. Where lifts are proposed, the draft checklist expected a declaration against D5(B5).
- No stated design codes. The draft checklist asked for the fire safety design codes or standards used. Any 'no' answer was to trigger resubmission of the Fire Statement.
- No evidence of competence. The adopted plan asks for the author's competence to be evidenced in the statement.
- Fire safety added late. The adopted plan warns that applying features or products to pre-determined developments can produce less successful schemes that fail to achieve the highest standards of fire safety.
- Forgetting the statement is public. The draft guidance said information submitted with a planning application is generally public. Security sensitive content was to be redacted or restricted in line with the rest of the application.
A planning stage fire strategy written for the specific scheme avoids most of these problems. It also becomes the base for the full strategy at building control stage, which means less has to be rewritten later. Our fire strategy report example shows how such a document is set out.
For schemes in the capital, our London page sets out the work we do there. To have the D12 material and any Gateway 1 form prepared together, use our planning fire statements service.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- The London Plan 2021, Policies D5 and D12 (official source, opens in a new tab)
- Fire Safety Guidance Pre-Consultation Information, GLA (official source, opens in a new tab)
- Fire Safety D12(A) LPG Pre-Consultation Draft, March 2021 (official source, opens in a new tab)
- Draft Guidance Sheet: Fire Statements, Policy D12(B) (official source, opens in a new tab)
- Mayor Leads the Way on Improving Fire Safety, GLA Press Release, February 2022 (official source, opens in a new tab)
- Fire Safety London Plan Guidance Consultation (official source, opens in a new tab)
- Mayoral Decision MD3515, London Plan Publication and Statutory Consultation (official source, opens in a new tab)
- Draft Fire Safety LPG (Withdrawn), GLA (official source, opens in a new tab)
- Draft London Plan 2026, Chapter 2 (official source, opens in a new tab)
- Draft London Plan Consultation (official source, opens in a new tab)
- Fire Engineering Consultations, London Fire Brigade (official source, opens in a new tab)
- Town and Country Planning (Development Management Procedure) (England) Order 2015, article 9A (official source, opens in a new tab)