Skip to content

Building Safety Act and higher-risk buildings

A Gateway 1 fire statement must accompany a planning application in England for a building of 18 metres or more or seven or more storeys with two or more dwellings or educational accommodation. Required since 1st August 2021, it sets out the fire safety principles and standards applied. Since 27th January 2026 the Building Safety Regulator has been statutory consultee.

Last reviewed
Reading time
13 minutes
A building under construction with scaffolding and a crane

Where the fire statement comes from

A Gateway 1 fire statement is a statement about the fire safety design principles, concepts and standards that have been applied to a development. The duty is in article 9A of the Development Management Procedure Order 2015 (opens in a new tab), inserted by SI 2021/746 (opens in a new tab). That Order was made on 22nd June 2021 and came into force on 16th July 2021. Its fire statement provisions apply to applications for planning permission made on or after 1st August 2021.

The Planning Practice Guidance (opens in a new tab) says planning gateway one has two key elements. The first is the fire statement the developer submits with a relevant application. The second is a statutory consultee for those applications, which is now the Building Safety Regulator.

The Order applies in England only. The guidance asks for information that is focused and concise, specific and relevant to the development and proportionate to its scale, type and complexity. Our planning fire statements service prepares the form and the planning stage fire strategy behind it.

Gateway 1 is about land use planning. The guidance says a fire statement should not contain the breadth and depth of fire safety information submitted at building control stage. It does not duplicate or require compliance with the Building Regulations or the Fire Safety Order. Local planning authorities are not responsible for building regulation matters through it.

Which buildings need a fire statement?

The duty attaches to a relevant building. Article 9A defines it as a building that meets the height condition and contains two or more dwellings or educational accommodation. The height condition is met if the building is 18 metres or more in height or contains 7 or more storeys.

A dwelling includes a flat. Educational accommodation means residential accommodation for boarders at school. It also means residential accommodation for students attending higher education courses, further education courses or courses at 16 to 19 Academies. Tall student accommodation for those students falls within that definition.

The Building Safety Regulator says care homes, hotel accommodation and short-term holiday lets are not dwellings for this test. For sheltered housing or supported living, the deciding factor is whether residents would be expected to escape independently. A mixed use building is a relevant building only if it includes at least two units that meet the definition of dwelling or it includes educational accommodation.

Hospitals and care homes are not in the Gateway 1 test. Article 9A covers only dwellings and educational accommodation. They can still be higher-risk buildings at Gateways 2 and 3. The government criteria for those gateways (opens in a new tab) cover buildings with at least two residential units, care homes and hospitals that are at least 18 metres in height or have at least 7 storeys.

The form's list of proposed uses includes hospital, care home and hotel. Listing a use on the form does not make a building a relevant building. The test therefore catches high-rise residential blocks of flats, tall student residences and boarding accommodation at schools.

How height and storeys are measured

Get the height test right before anything else. A building just over or just under the line changes what the application must contain. The rules come from article 9A and the Planning Practice Guidance.

  • Height is measured from ground level to the top floor surface of the top storey of the building.
  • A roof-top storey that is a machinery or plant area or consists only of plant rooms is ignored.
  • The guidance says height is measured from ground level on the lowest side of the building.
  • Storeys below ground level are not counted. A storey is below ground if any part of the finished surface of its ceiling is below the ground level immediately next to it.
  • A mezzanine counts as a storey if its internal floor area is at least 50 percent of the largest storey that is not below ground level.
  • Storeys are counted from ground level on the lowest side, at the position that gives the greatest number.

Take a hypothetical block of flats on a sloping site with six storeys on the high side and seven on the low side. Counted where the number is greatest, it has seven storeys. It meets the height condition whatever its height in metres.

Applications that need one and those that do not

Article 9A applies to applications for development that provides one or more relevant buildings, development of an existing relevant building and development within the curtilage of a relevant building. The fire statement then becomes part of a valid application. The local planning authority must place it on Part 2 of the planning register.

Four kinds of application are exempt.

  • Applications for outline planning permission are exempt.
  • Section 73 applications to develop land without complying with conditions previously attached are exempt.
  • A material change of use of a relevant building that means it is no longer a relevant building is exempt.
  • A material change of use within the curtilage of a relevant building that does not result in a relevant building is exempt.

Outline applications are exempt because layout and scale can be reserved. The guidance says a developer may still provide fire statement information voluntarily. The Building Safety Regulator says it will usually ask the authority to attach a condition to an outline or hybrid permission. The condition requires a fire statement form with the reserved matters application and asks for the Regulator to be consulted at that stage.

The authority may also consult the Regulator on a section 73 application where it considers it appropriate. Prior approval under Class MA of Part 3 and Classes A and AA of Part 20 of the General Permitted Development Order needs a fire safety statement where the height condition is met. For prior approval of residential extensions of up to two storeys, the Regulator expects a report from a chartered engineer or other competent professional confirming the existing external wall complies with requirement B4(1). It will raise a concern if that report is missing.

What the form asks for

Article 9A requires the statement to be on a form published by the Secretary of State or a form substantially to the same effect. It must include the particulars the form specifies. GOV.UK publishes the fire statement form (opens in a new tab) as an editable document and a print version with a separate guidance note (opens in a new tab). The statement must cover the whole development within the red line boundary and not just the tall building.

  • Sections 1 and 2 give the site address and a description of the development, including any change of use.
  • Section 3 gives the name, qualifications and experience of the person completing the statement, in no more than 200 words.
  • Section 4 records fire safety consultation undertaken and what account was taken of it, in no more than 200 words.
  • Section 5 is a site layout plan with block numbering.
  • Section 6 is a building schedule covering site information, building information and resident safety information for each block.
  • Section 7 covers specific technical complexities and departures from standards, in no more than 500 words.
  • Section 8 covers issues that might affect the fire safety of the development, in no more than 500 words.
  • Section 9 covers local development document policies on fire safety, in no more than 500 words. It is left blank if there are none.
  • Sections 10 to 13 explain the fire service site plan, emergency road vehicle access, the siting of fire appliances and the suitability of the water supply, each in no more than 200 words.
  • Section 14 is the fire service site plan and sections 15 and 16 are the signature and date.

The building schedule asks for each block's height in metres, its number of storeys excluding and including those below ground level, its uses and where they sit. It asks which fire safety standards or approach have been applied, including to external wall systems. It asks whether external walls and balconies are class A2-s1, d0 or better under BS EN 13501-1:2018, with the exception of the materials listed in Regulation 7(3) of the Building Regulations 2010. It also covers the approach to evacuation, automatic suppression and accessible housing.

The standards list offers Approved Document B volumes 1 and 2, BS 9991, BS 9999, BS 7974, BB100, HTM 05-02 and a fire engineered approach. The guidance says any departure from the chosen standard should be justified in section 7. The guidance dates from June 2021 and cites the editions current at that time.

The evacuation options are simultaneous, phased, staged, stay put, progressive horizontal and delayed. Section 13 asks for the nature of the water supply, such as open water, a public or private hydrant or a tank. It also asks whether existing hydrants are usable.

The fire service site plan should show emergency vehicle routes and tracking, appliance siting, main firefighter access points, dry and wet risers, evacuation assembly points and cores with firefighting or evacuation lifts. It should also show the hydrants the proposals rely on and their distances.

Who should complete the fire statement?

The Order does not name a qualification. The form guidance recommends that fire statements are completed by a suitably qualified engineer with relevant experience in fire safety, such as a chartered engineer registered with the Engineering Council by the Institution of Fire Engineers. It also allows for a suitably qualified and competent professional with the demonstrable experience to address the complexity of the design. That is a recommendation and not a legal requirement.

Section 3 asks for the author's name, qualifications and experience. Whoever completes the form puts their competence on the record there. Section 4 asks what fire safety consultation has taken place and how the design has responded to it.

The answers the form records are engineering decisions about stair numbers, firefighting shafts, appliance access and water supply. They also fix the massing of the building. A wrong answer at planning tends to surface as redesign at Gateway 2, when the fire strategy is developed in full.

Who assesses it: the Building Safety Regulator

The statutory consultee for relevant applications has been the Building Safety Regulator since 27th January 2026. SI 2026/20 (opens in a new tab) set the Regulator up as a standalone body on that date and substituted it for the Health and Safety Executive in Schedule 4 of the Development Management Procedure Order (opens in a new tab). The Planning Gateway One team moved across from HSE with it.

Older official guidance has not caught up. The Planning Practice Guidance was last updated on 20th August 2021 and still names HSE. So does the HSE land use planning page. Where those pages name HSE, the consultee is now the Building Safety Regulator.

The local planning authority must consult the Regulator before granting permission for development involving a relevant building. The Regulator has 21 calendar days from receiving the request to respond unless the authority agrees a longer period. Cases go to Fire Safety Information Assessors, whom the Regulator describes as qualified fire specialists. The team covers the whole of England.

Advice comes in two parts. Part 1 is formal advice to the authority, including whether there are concerns about fire safety matters relevant to land use planning. Part 2 is supplementary information that is not formal advice. The Regulator assesses against national standards and does not use local planning policy or local standards. The authority decides what weight to give the advice.

If the Regulator is asked to comment on a full application with no fire statement form, it declines to assess it because the application lacks the required information. It offers pre-application advice (opens in a new tab) on Gateway 1 and says the service is currently free of charge. Its guidance asks applicants to annotate drawings clearly and to avoid describing fire safety features as 'indicative' or in other ambiguous terms.

Common concerns the Regulator raises

The Building Safety Regulator publishes a list of common concerns (opens in a new tab) in its Planning Gateway One guidance on the Planning Portal. The Regulator provides that content. It says the list is not exhaustive but identifies concerns it commonly raises in substantive responses.

  • Stairs and lift shafts, including firefighting stairs, that connect with a basement in a single stair building.
  • Single stairs made vulnerable by connection to higher-risk ancillary accommodation such as covered car parks, bin stores and plant rooms.
  • Firefighter safety, including excessive travel distances into and within buildings.
  • The need for two or more firefighting shafts where a floor above 18 metres is greater than 900 square metres.
  • Basements served by two or more stairs where none terminates at ground floor level.
  • Access to firefighting water, including long horizontal fire mains, missing information on working hydrants and poorly located rising main inlets and outlets.
  • No sprinkler system in a relevant building where additional storeys are proposed, given the space needed for tanks and pipework.
  • External wall systems and attachments such as balconies that include combustible materials.
  • Green roofs close to ignition sources such as solar panels and wiring.
  • External fire spread to neighbouring buildings from proximity and from heat radiating from vents and openings.
  • Poor access for fire appliances.
  • Excessively long corridors to reach a firefighting shaft at fire service access level.
  • Residential stairs in mixed use buildings that also serve retail, hotel or office areas.
  • A lack of proportionate evidence to support performance-based solutions.

Most of these concern the number and position of stairs, firefighting shafts, appliance access and water. Those are fixed at concept stage and are costly to change later. The Regulator states that a building with a storey over 900 square metres gross internal floor area that is 18 metres or more above fire service access will need at least two firefighting shafts.

The Regulator adds that identifying these matters is not a full review of building regulation matters. Addressing them will not necessarily satisfy the requirements of later regulatory stages.

Gateways 2 and 3, London, Wales and Scotland

Gateway 1 is the first of three points of control. Gateways 2 and 3 are run under the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023 (opens in a new tab), in force from 1st October 2023. The three differ in stage, decision maker and scope.

Gateways 1, 2 and 3 in England
GatewayStageWho decidesBuildings in scopeTime limit
Gateway 1Planning applicationThe local planning authority, with the Building Safety Regulator as statutory consultee18 metres or 7 storeys with two or more dwellings or educational accommodation21 calendar days for the consultee response unless extended
Gateway 2Building control applicationThe Building Safety Regulator18 metres or 7 storeys with at least two residential units, care homes and hospitals12 weeks for a new higher-risk building and 8 weeks for work to an existing one
Gateway 3Completion certificate applicationThe Building Safety RegulatorAs Gateway 28 weeks

For a new higher-risk building the 12 week period can be extended if the Regulator and the applicant agree in writing. A GOV.UK page on planning gateway one, withdrawn on 31st August 2021, described Gateways 2 and 3 as they were planned at the time. It called Gateway 2 a hard stop where construction could not begin until the Regulator had approved the building control application. It called Gateway 3 a hard stop at which the Regulator would carry out final inspections and issue a completion certificate. Treat that page as history only. Our building safety gateway support covers those stages. Our guide to the building safety case covers what follows once a higher-risk building is occupied.

In Greater London, London Plan Policy D12 applies as well. Part B asks for a Fire Statement with all major development, whatever the height. The two requirements are separate. A tall London block of flats that is also major development needs both.

SI 2021/746 applies in England only. In Wales, a Welsh Government letter of 1st November 2021 (opens in a new tab) explains that fire and rescue authorities became statutory planning consultees under the Development Procedure (Consultees) (Wales) (Miscellaneous Amendments) Order 2021. Planning authorities must consult them on listed types of application validated on or after 25th April 2022, such as 10 or more dwellinghouses. Our Wales and Scotland pages cover projects in those nations.

To have the form and the planning stage strategy prepared together, use our planning fire statements service.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

Only if they contain 7 or more storeys and two or more dwellings or educational accommodation. The height condition is 18 metres or more or 7 or more storeys. A building under 18 metres with fewer than 7 storeys is outside it.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.