What does Policy D5(B5) say?
Policy D5 Inclusive design sits in Chapter 3 of the London Plan 2021 (opens in a new tab), the statutory spatial development strategy for Greater London prepared by the Mayor and published on 2nd March 2021. Part B says development proposals should achieve the highest standards of accessible and inclusive design. It lists five things they should do and the fifth, known as D5(B5), deals with evacuation.
Part B(5) says development should "be designed to incorporate safe and dignified emergency evacuation for all building users. In all developments where lifts are installed, as a minimum at least one lift per core (or more subject to capacity assessments) should be a suitably sized fire evacuation lift suitable to be used to evacuate people who require level access from the building."
The trigger is the presence of lifts, not height. A hypothetical four storey office with a passenger lift falls within the wording in the same way as a tower. The policy applies in Greater London only. Our planning fire statements service covers D5(B5) alongside D12.
Paragraph 3.12.8 of the Policy D12 supporting text repeats the requirement. Our guide to London Plan Policy D12 covers the D12(A) criteria and the D12(B) Fire Statement.
Why carry-down devices are ruled out
The reasoning sits in paragraph 3.5.10 of the supporting text. All building users, including those who require level access, should be able to evacuate with dignity and by as independent means as possible. The paragraph goes on: "Emergency carry down or carry up mechanical devices or similar interventions that rely on manual handling are not considered to be appropriate, for reasons of user dignity and independence." Its answer is lifts that can be used for evacuation, accompanied by a management plan. Those lifts should be appropriately designed, constructed and include the necessary controls suitable for the purposes intended.
Policy D5(C) says Design and Access Statements should include an inclusive design statement. The supporting text says it should set out how access and inclusion will be maintained and managed, including fire evacuation procedures. Paragraph 3.5.2 asks for inclusive design to be considered at the earliest possible stage.
What is an evacuation lift?
Approved Document B, the national guidance in England, defines an evacuation lift as "A lift that may be used to evacuate people in a fire." The same definition appears in Volume 1 (opens in a new tab) and Volume 2 (opens in a new tab).
The GLA's withdrawn draft guidance went further. It said an evacuation lift is specifically designed to be used in an evacuation situation and is particularly beneficial for people who require level access. In normal use it works as an ordinary passenger lift, with additional functions that let it shift into an emergency state. It can run in automatic mode or under the direction of building management, a trained evacuation assistant or the rescue services.
The draft named three operating methods: driver assisted, automatic and remote assisted evacuation. It listed these features.
- A cause and effect interface between the lift controls and the fire detection and alarm system.
- An emergency intercom or communication system.
- A management plan for trained staff.
- A separate power supply so the lift stays in use.
For evacuation lifts the draft named BS EN 81-76 when published, BS 9991 and BS 9999. Check the current status of any standard before writing it into a specification.
The GLA's withdrawn evacuation lift guidance
The GLA published a pre-consultation guidance sheet on Policy D5(B5) Evacuation Lifts (opens in a new tab), updated 19th March 2021. Its pre-consultation page (opens in a new tab) says these drafts were for information only and that formal consultation took place during 2022. Mayoral Decision MD3515 (opens in a new tab), signed on 9th July 2026, withdrew the draft Fire Safety London Plan Guidance that followed.
The GLA's withdrawn guidance page (opens in a new tab) says the draft is no longer proposed for adoption. It also says the withdrawal does not affect the status of Policies D5 and D12 of the London Plan 2021. The sheet still shows how GLA officers read D5(B5) at the time. None of what follows is adopted guidance.
The draft said D5(B5) applies to all development proposal applications, including residential developments. It asked for a Declaration of Compliance written and signed by the author and signed off by the applicant. For major development it was to sit in the Fire Statement and otherwise in the Inclusive Design Statement. It was to give assurance on four points.
- The design and provision of the evacuation lifts complies with the stated design code.
- A suitable outline evacuation strategy is provided and shows how the lift or lifts support it.
- A suitable outline management plan shows how the lifts are operated in an emergency.
- The outline management plan identifies the main evacuation lift features the building management team should maintain.
The draft also asked for the framework of a Building Management Plan and for contingency arrangements for people who require level access if a lift breaks down or is out of service for maintenance. That applied whether it was an evacuation lift or a firefighting lift.
Its checklist asked for one evacuation lift per core, the declaration, an outline evacuation strategy and a Building Management Plan. Any no answer meant the proposal was not compliant with D5(B5).
How many evacuation lifts does a building need?
The adopted minimum is one evacuation lift per core where lifts are installed. The words "or more subject to capacity assessments" mean the number can go up. The withdrawn draft said the capacity assessment should set out the method for assessing potential building occupants, its assumptions and the justification for the outcome.
A core with a stair and no lift is a different case. The withdrawn draft treated a proposal with no lift core as outside D5(B5). The Draft London Plan 2026 says that where a core is proposed with only a stairway and no lift, no evacuation lift is required to meet its policy.
Take a hypothetical twelve storey mixed use block with two cores, each with passenger lifts. Read against the policy wording, each core needs at least one fire evacuation lift. That affects core size, power supplies and the management plan. It belongs at concept stage.
Can a firefighting lift be the evacuation lift?
The sources point in different directions and the adopted policy text does not address the question. The three positions are set out below with their status.
The withdrawn draft said evacuation lifts should be provided in addition to the Building Regulations requirements for firefighting shafts and lifts. That way they can be used for evacuation while the fire and rescue service is using the firefighting lift. The GLA's equality impact assessment (opens in a new tab) of February 2022 repeated the point.
Approved Document B Volume 2, which covers buildings other than dwellings, takes a different line. Paragraph 5.33 says "Where a firefighting lift is provided, it can be used to evacuate disabled people." Management plans should describe how this would be managed and what will happen when the fire and rescue service arrives.
The 2026 Review of Approved Document B consultation proposes that in new residential buildings above 18 metres a firefighting lift already provided can have a dual function. That is a proposal and its outcome is awaited.
| Source | Status | Position |
|---|---|---|
| GLA guidance sheet on Policy D5(B5), updated 19th March 2021 | Pre-consultation draft, never adopted. The draft Fire Safety London Plan Guidance was withdrawn under MD3515, signed 9th July 2026. | Evacuation lifts should be in addition to firefighting lifts. A firefighting shaft does not remove the D5(B5) requirement. |
| Approved Document B Volume 2, paragraph 5.33 | Current national guidance in England for buildings other than dwellings | Where a firefighting lift is provided, it can be used to evacuate disabled people. Management plans should describe how. |
| Review of Approved Document B consultation, 2026 | A proposal. The consultation closed on 1st July 2026 and the outcome is awaited. | In new residential buildings above 18 metres, a firefighting lift already provided can have a dual function. |
Raise the point with the borough and the fire engineer before the core layout is fixed. Approved Document B Volume 1 paragraph 15.2 says a building with a storey more than 18 metres above fire and rescue service vehicle access level should have one or more firefighting shafts, each containing a firefighting lift.
Evacuation lifts in Approved Document B and the 2026 review
Amendments (opens in a new tab) to Approved Document B took effect in England on 30th September 2026. They added building design provisions to support the use of evacuation lifts in blocks of flats, alongside a new recommendation for more than one common stair in blocks with a storey 18 metres or more in height. The earlier guidance still applies where a building notice, initial notice or full plans application was made before that date and the work is sufficiently progressed before it or within 18 months.
In Volume 1, paragraph 3.29 says that where evacuation lifts are provided they should be located within an evacuation shaft containing a protected stairway, evacuation lift and evacuation lift lobby. The lobby should provide a refuge area and not be directly accessible from any flat, maisonette, storage room or electrical equipment room. Paragraph 3.53 says any smoke control system protecting the stair should give the same protection to the evacuation lift and its lobby.
Volume 2 paragraph 5.32 says lifts should generally not be used in a fire unless their use forms part of a management plan for evacuating people. The lifts should also be appropriately sited and protected and contain safety features so they remain usable during a fire. It points to Annex G of BS 9999 for guidance on the design and use of evacuation lifts.
Volume 1 paragraph 17.7 says the fire safety records should include any provision for evacuating disabled people, including the location and mode of operation of evacuation lifts. That information forms part of the Regulation 38 handover.
In a consultation response (opens in a new tab) page updated on 2nd September 2024, the government said the updated guidance would not call for evacuation lifts as a matter of course.
The Review of Approved Document B (opens in a new tab) consultation by the Building Safety Regulator and MHCLG ran from 25th March to 1st July 2026. Its consultation document (opens in a new tab) proposes a minimum of two stairs and two evacuation lifts in all new residential buildings above 18 metres in England. On 23rd November 2026 GOV.UK said the feedback was being analysed. Treat it as a proposal until the government publishes its response. Our guide to second staircases over 18 metres covers the stair amendment.
The London Plan does not apply in Wales or Scotland. The Welsh Approved Document B Volume 2 (opens in a new tab) says a lift may in some circumstances be provided as part of a management plan for evacuating people.
What the Draft London Plan would change
The Draft London Plan (opens in a new tab) was consulted on from 16th July to 15th October 2026. Evacuation lifts move into draft policy MBUL8, where Part B(3) reads: "in all new buildings of any height where lifts are installed, as a minimum at least one lift per core that includes a lift should be a fire evacuation lift suitable to be used to evacuate people who require level access from the building."
Unlike D5(B5), it refers to new buildings of any height and drops "suitably sized" and "(or more subject to capacity assessments)" from the policy text. Paragraph 2.108 says new buildings include substantial redevelopment of existing buildings requiring planning permission. Part C(4) still asks for the capacity assessment, the evacuation strategy and the lift management plan in the design and access statement where relevant.
Part D is a sunset clause. The Mayor will monitor national requirements for evacuation lifts and publish a formal statement of supersession when Parts B(3) and C(4) are no longer deemed necessary. Paragraph 2.113 says the Building Regulations currently have no equivalent requirement.
All of this is draft. The GLA says the Draft London Plan is a material consideration in planning decisions. Formal publication of the new plan is timetabled for March 2028 and until then D5(B5) of the London Plan 2021 is the adopted policy.
Who checks D5(B5) and the mistakes to avoid
The Building Safety Regulator comments on Gateway 1 fire statements but not on London policy. It says it is not able to confirm compliance (opens in a new tab) with local plan policies, including London Plan requirements on fire safety in tall residential buildings. That is a matter for the local planning authority and/or the Greater London Authority.
The points below come from the adopted plan or the withdrawn draft, as marked.
- Relying on evacuation chairs or other manual handling. The adopted plan says these are not considered appropriate, for reasons of user dignity and independence.
- Assuming trained staff will be on hand in housing. The withdrawn draft accepted that such people may be absent from some residential developments. It said alternative measures should then be set out and that D5(B5) still applies.
- No plan for a lift that is out of service. The withdrawn draft asked for contingency arrangements for breakdown and maintenance.
- A missing declaration, strategy or management plan. Under the withdrawn draft checklist any of these gaps meant the proposal was not compliant.
- Fixing the cores before the evacuation strategy. The withdrawn draft said the evacuation strategy should be determined at the earliest design stage.
Our guide to evacuation strategies explains stay put, simultaneous and phased evacuation. Our London page sets out the work we do in the capital.
To have the D5(B5) material, the D12 statement and any Gateway 1 form prepared together, use our planning fire statements service. Where the lift and evacuation design needs analysis, our fire engineering service can support it.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- The London Plan 2021, Policy D5 Inclusive Design (official source, opens in a new tab)
- London Plan Guidance Sheet: Policy D5(B5) Evacuation Lifts, Pre-Consultation Draft (official source, opens in a new tab)
- Fire Safety Guidance Pre-Consultation Information, GLA (official source, opens in a new tab)
- Draft Fire Safety LPG (Withdrawn), GLA (official source, opens in a new tab)
- Mayoral Decision MD3515, London Plan Publication and Statutory Consultation (official source, opens in a new tab)
- Equality Impact Assessment for the Fire Safety LPG, GLA, February 2022 (official source, opens in a new tab)
- Draft London Plan 2026, Chapter 2 (official source, opens in a new tab)
- Approved Document B Volume 1 (official source, opens in a new tab)
- Approved Document B Volume 2 (official source, opens in a new tab)
- Amendments to Approved Document B Taking Effect 30th September 2026 (official source, opens in a new tab)
- Consultation Response: Amendments to Approved Document B, Second Staircases (official source, opens in a new tab)
- Review of Approved Document B (Fire Safety Guidance), Consultation (official source, opens in a new tab)
- Planning Gateway One: Applications to Discharge Planning Conditions, Building Safety Regulator (official source, opens in a new tab)