Seven steps, one engineer who stays with the project and no surprises at Building Control. Here is exactly what happens after you get in touch.

Step by step
What happens, in order.
The first two steps cost you nothing. From step three the fee is fixed, the programme is agreed and the same engineer carries the strategy through to approval.
What we need from you
- Current architectural drawings, plans and sections
- The intended use, occupancy numbers and management arrangements
- The project programme and the stage you are at
- Any correspondence already exchanged with Building Control or the fire service
- For existing buildings, access to survey the as-built condition
- 01
Send us the drawings
YouCurrent general arrangement plans, a description of the building and its use and the stage you are at. CAD, model or PDF, whatever you have.
- 02
We scope and quote
FreeWe confirm which documents the project needs, the route to compliance we recommend and a fixed fee with a programme. All on the same day.
- 03
Consultation
A conversation with the design team about the goals, the constraints and the sticking points so the strategy shapes the design rather than fights it.
- 04
Design review and analysis
Layouts, materials, use and occupancy analysed floor by floor. Where the building needs it, engineered analysis and modelling in-house.
- 05
Draft for comment
The report and annotated plans issued for the design team to check against the current drawings.
- 06
Issue and approval
The final strategy issued for submission. We engage with Building Control, the Building Safety Regulator and the fire authority on your behalf and answer their questions.
- 07
Keep it current
Revisions as the design develops, the as-built version at handover and the Regulation 38 pack and golden thread that follow the building.
Across the RIBA stages
What fire strategy delivers at each stage.
Fire safety is a thread, not a single deliverable. Join at any stage and we pick up the thread from there.
Strategic definition and preparation
Initial fire safety objectives, site constraints and feasibility input to inform the brief. On a higher-risk scheme, the threshold check for Gateway 1.
Concept design
Concept fire strategy, means of escape, compartmentation approach and fire safety design options. The planning fire statement for Gateway 1 and London Plan D12.
Spatial coordination
Developed fire strategy, updated escape analysis, compartmentation coordination and the design parameters for suppression and detection.
Technical design
Technical fire strategy and specifications, fire strategy plans and the Gateway 2 submission to the Building Safety Regulator. Coordination with structural and services engineers.
Manufacturing and construction
Review of contractor submissions, resolution of fire safety queries and change control on higher-risk buildings.
Handover
As-built fire strategy and plans, the Regulation 38 pack, Gateway 3 completion evidence and the golden thread handed to the Accountable Person.
Use
The strategy becomes the baseline for the fire risk assessment, the safety case and every future change to the building.
Gateway 1, 2 and 3 slot into Stages 2, 4 and 6.
Gateway supportThe standards we work to
Grounded in the recognised UK framework.
Every strategy states which route it takes and why so the approver can follow the reasoning rather than take it on trust.
Approved Document B
The statutory guidance supporting Part B of the Building Regulations in England. One route to compliance, not the only one.
BS 9999:2017
The risk based code of practice for fire safety in the design, management and use of non residential buildings.
BS 9991:2024
The code of practice for residential buildings. An advisory note developed with the Building Safety Regulator says Gateway 2 applications adopting it should use the 2024 edition from 30th September 2026.
BS 7974 and PD 7974
The framework for applying fire safety engineering principles to building design. The basis of every first principles strategy we write.
Building Safety Act 2022
The regime for higher-risk buildings. Three gateways, the golden thread, the safety case and the Building Safety Regulator.
Fire Safety Order 2005
The law for occupied premises. The strategy is the design intent the Responsible Person manages the building against.
Step one
Send us the drawings
Attach what you have or describe the building. We come back the same day with the scope, the route we recommend and a fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK