Skip to content

Fire engineering in-house, UK wide

Smoke, not flame, is what stops people leaving a building in time. Smoke control and evacuation modelling let you prove that the escape routes in your design stay usable for long enough. We carry out that work in-house for clients across the UK.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
Approved Document B, BS 9991:2024 and BS 9999:2017, BS 7974 and PD 7974
Signed off by
A Chartered Engineer (CEng)
Scroll

Overview

What is smoke control and evacuation modelling?

Proving the design works rather than assuming it does

Smoke control is the set of systems and openings that keep smoke away from the routes people use to escape and the routes firefighters use to attack a fire. Evacuation modelling calculates how long those people need to get out. Together they answer one question. Do the occupants have more time than they need.

Prescriptive guidance answers by pattern matching. Your building either looks like the example in the guidance or it does not. Modelling answers by calculation, which is what an atrium, a converted mill or a transport interchange needs. This is fire engineering work rather than fire risk assessment work and we hold it in-house.

Standards and legislation

Approved Document B
Guidance rather than law. Depart from it and you rely on a documented engineering case that Building Control will test.
BS 9991:2024 and BS 9999:2017
Both accommodate performance based design. A Construction Leadership Council advisory note developed with the Building Safety Regulator says Gateway 2 applications adopting BS 9991 should use the 2024 edition from 30th September 2026.
BS 7974 and PD 7974
The framework for the qualitative design review that fixes scope, design fires and acceptance criteria before any model is run.
BS EN 12101 series
Product and system standards for smoke and heat control, including pressure differential systems for protected stairs.

Who

Who needs smoke control and evacuation modelling

When the building does not fit the guidance

01

Single stair residential

Residential buildings with a single stair, extended travel distances or a lobby arrangement that departs from Approved Document B.

02

Atria and large volumes

Atria, malls and other large connected volumes where a smoke reservoir has to be designed rather than assumed.

03

Enclosed car parks

Basement and enclosed car parks where natural cross ventilation is not achievable.

04

Phased evacuation

Buildings adopting phased or progressive horizontal evacuation, including hospitals and care settings.

05

Gateway 2 submissions

Higher-risk buildings preparing an application to the Building Safety Regulator that relies on a performance case.

06

Constrained refurbishment

Where the stair, shaft or ventilation cannot be enlarged and a performance case is the only route left.

Scope

What smoke control and evacuation modelling covers

From smoke shafts to ASET against RSET

  1. 01Natural smoke ventilation, including automatic opening vents and reservoir geometry
  2. 02Mechanical smoke extract, including car park, corridor and jet fan arrangements
  3. 03Smoke shaft design for residential corridors and lobbies
  4. 04Stair pressurisation to BS EN 12101-6, including door opening force limits
  5. 05Computational fluid dynamics where hand calculation cannot resolve the geometry
  6. 06Evacuation modelling including pre movement time, flow and phased strategies
  7. 07ASET and RSET comparison against tenability criteria
  8. 08Sensitivity analysis on the assumptions that move the result

Our process

How the work runs.

  1. 01

    Qualitative design review

    We agree scope, fire scenarios, design fires and acceptance criteria with you and with the approving body before modelling starts. This is what stops a model being rejected after it is paid for.

  2. 02

    Method selection

    We choose the simplest method that answers the question. Hand calculation and zone models where they are defensible, CFD where the geometry genuinely demands it.

  3. 03

    Modelling and analysis

    We run the scenarios, compare available safe egress time against required safe egress time and test how sensitive the margin is.

  4. 04

    Reporting

    We issue a fire engineering report stating the assumptions, the limitations and the residual design constraints in plain language.

  5. 05

    Support through approval

    We answer the technical queries from the approving body and revise the analysis where the design changes.

What you get

  • A fire engineering report ready for a building control application
  • A qualitative design review record
  • Smoke control design intent for the installer to meet
  • Evacuation modelling output with ASET and RSET results scenario by scenario
  • A cause and effect narrative the commissioning process can be tested against
Sheet
FS-06
Fee
Fixed, agreed first

Why us

Engineered in-house, not subcontracted.

01

Modelling kept in-house

We do not subcontract the modelling and relay the answers. The strategy, the model and the risk assessment agree with each other.

02

Limitations written down

Where a result rests on an assumption we cannot fully justify, we say so rather than bury it.

03

Practical, not just compliant

We will tell you when a simpler prescriptive solution is cheaper than the modelling needed to justify a clever one.

04

UK wide

Projects across the UK, in every sector.

Need smoke control and modelling for a project?

Send us the drawings and we will tell you what the project needs the same day.

Talk to an engineer

Common questions

Smoke control and modelling: your questions, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

When the geometry, the ventilation interaction or the design fire cannot be resolved by hand calculation or a zone model. Atria, complex car parks and unusual smoke shaft arrangements are the common cases. Where a simpler calculation gives a defensible answer, CFD adds cost and programme without adding certainty. We will say so.

Smoke control and modelling by sector

All sectors

Guides

Guides on this topic.

Start your smoke control and modelling

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.