Smoke, not flame, is what stops people leaving a building in time. Smoke control and evacuation modelling let you prove that the escape routes in your design stay usable for long enough. We carry out that work in-house for clients across the UK.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Approved Document B, BS 9991:2024 and BS 9999:2017, BS 7974 and PD 7974
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
Overview
What is smoke control and evacuation modelling?
Proving the design works rather than assuming it does
Smoke control is the set of systems and openings that keep smoke away from the routes people use to escape and the routes firefighters use to attack a fire. Evacuation modelling calculates how long those people need to get out. Together they answer one question. Do the occupants have more time than they need.
Prescriptive guidance answers by pattern matching. Your building either looks like the example in the guidance or it does not. Modelling answers by calculation, which is what an atrium, a converted mill or a transport interchange needs. This is fire engineering work rather than fire risk assessment work and we hold it in-house.
Standards and legislation
- Approved Document B
- Guidance rather than law. Depart from it and you rely on a documented engineering case that Building Control will test.
- BS 9991:2024 and BS 9999:2017
- Both accommodate performance based design. A Construction Leadership Council advisory note developed with the Building Safety Regulator says Gateway 2 applications adopting BS 9991 should use the 2024 edition from 30th September 2026.
- BS 7974 and PD 7974
- The framework for the qualitative design review that fixes scope, design fires and acceptance criteria before any model is run.
- BS EN 12101 series
- Product and system standards for smoke and heat control, including pressure differential systems for protected stairs.
Who
Who needs smoke control and evacuation modelling
When the building does not fit the guidance
Single stair residential
Residential buildings with a single stair, extended travel distances or a lobby arrangement that departs from Approved Document B.
Atria and large volumes
Atria, malls and other large connected volumes where a smoke reservoir has to be designed rather than assumed.
Enclosed car parks
Basement and enclosed car parks where natural cross ventilation is not achievable.
Phased evacuation
Buildings adopting phased or progressive horizontal evacuation, including hospitals and care settings.
Gateway 2 submissions
Higher-risk buildings preparing an application to the Building Safety Regulator that relies on a performance case.
Constrained refurbishment
Where the stair, shaft or ventilation cannot be enlarged and a performance case is the only route left.
Scope
What smoke control and evacuation modelling covers
From smoke shafts to ASET against RSET
- 01Natural smoke ventilation, including automatic opening vents and reservoir geometry
- 02Mechanical smoke extract, including car park, corridor and jet fan arrangements
- 03Smoke shaft design for residential corridors and lobbies
- 04Stair pressurisation to BS EN 12101-6, including door opening force limits
- 05Computational fluid dynamics where hand calculation cannot resolve the geometry
- 06Evacuation modelling including pre movement time, flow and phased strategies
- 07ASET and RSET comparison against tenability criteria
- 08Sensitivity analysis on the assumptions that move the result
Our process
How the work runs.
- 01
Qualitative design review
We agree scope, fire scenarios, design fires and acceptance criteria with you and with the approving body before modelling starts. This is what stops a model being rejected after it is paid for.
- 02
Method selection
We choose the simplest method that answers the question. Hand calculation and zone models where they are defensible, CFD where the geometry genuinely demands it.
- 03
Modelling and analysis
We run the scenarios, compare available safe egress time against required safe egress time and test how sensitive the margin is.
- 04
Reporting
We issue a fire engineering report stating the assumptions, the limitations and the residual design constraints in plain language.
- 05
Support through approval
We answer the technical queries from the approving body and revise the analysis where the design changes.
What you get
- A fire engineering report ready for a building control application
- A qualitative design review record
- Smoke control design intent for the installer to meet
- Evacuation modelling output with ASET and RSET results scenario by scenario
- A cause and effect narrative the commissioning process can be tested against
- Sheet
- FS-06
- Fee
- Fixed, agreed first
Why us
Engineered in-house, not subcontracted.
Modelling kept in-house
We do not subcontract the modelling and relay the answers. The strategy, the model and the risk assessment agree with each other.
Limitations written down
Where a result rests on an assumption we cannot fully justify, we say so rather than bury it.
Practical, not just compliant
We will tell you when a simpler prescriptive solution is cheaper than the modelling needed to justify a clever one.
UK wide
Projects across the UK, in every sector.
Need smoke control and modelling for a project?
Send us the drawings and we will tell you what the project needs the same day.
Common questions
Smoke control and modelling: your questions, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsWhen the geometry, the ventilation interaction or the design fire cannot be resolved by hand calculation or a zone model. Atria, complex car parks and unusual smoke shaft arrangements are the common cases. Where a simpler calculation gives a defensible answer, CFD adds cost and programme without adding certainty. We will say so.
Smoke control and modelling by sector
All sectorsGuides
Guides on this topic.
Keep reading
Related services

Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read moreStart your smoke control and modelling
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK