Higher-risk buildings under the Building Safety Act 2022
Buildings of 18 metres or seven storeys with two or more residential units sit inside the Building Safety Act regime. The fire strategy is tested at every gateway and then becomes the foundation of the safety case. We produce strategies written to survive that scrutiny.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Building Safety Act 2022, HRB Procedures Regulations 2023, BS 9991:2024
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
What makes this sector different
What a fire strategy for high-rise residential buildings has to answer.
Three gateways
A fire statement at planning, a full strategy at Gateway 2 and as-built evidence at Gateway 3. The same strategy has to develop through all three without contradicting itself.
The Building Safety Regulator
The regulator is the building control body. Incomplete or inconsistent information is the main cause of refusal and programme delay.
Second staircase
The 2026 amendment to Approved Document B recommends more than one common stair in blocks of flats with a top storey of 18 metres or more in height. It took effect in England on 30th September 2026 and transitional arrangements need careful handling.
Safety case and golden thread
Once occupied, the strategy anchors the safety case report and must resolve to evidence in the golden thread.
Evacuation strategy
How evacuation works in a high-rise residential building
A new high-rise residential building is normally designed for stay put, supported by sprinklers, protected lobbies, smoke control to the corridors and at least one firefighting shaft. Since 2022 new residential buildings over 18 metres have also needed an evacuation alert system. It gives the fire service a way to tell residents on chosen floors to leave if a fire does not behave as the design assumes.
The regulator expects the strategy to show how each of those systems supports the evacuation strategy and how they will be maintained once people move in. A statement that the design follows the guidance is not enough at Gateway 2. Every departure has to be identified and justified.
Our approach
How we write a fire strategy for high-rise residential buildings.
We take a higher-risk building from Gateway 1 to occupation with one developing strategy. The planning fire statement is the first issue of the Gateway 2 strategy and the Gateway 3 as-built strategy is the document the Accountable Person inherits.
For existing high-rise blocks we produce retrospective strategies built from survey and records, structured to feed straight into the safety case report and the Building Safety Regulator registration.
Typical deliverables
- Gateway 1 fire statement
- Gateway 2 fire strategy and compliance narrative
- Gateway 3 as-built strategy and Regulation 38 pack
- Retrospective strategy and safety case support for existing blocks
Standards and guidance
Fire safety guidance for high-rise residential buildings
- Building Safety Act 2022 (official source, opens in a new tab)
- Creates the higher-risk building regime, the three gateways and the Accountable Person duties for occupied buildings.
- HRB Procedures Regulations 2023 (official source, opens in a new tab)
- Set out what a Gateway 2 application must contain, how changes are controlled during construction and what is handed over at completion.
- BS 9991:2024
- The residential code of practice, commonly used where a tall building's layout does not fit Approved Document B.
- Approved Document B 2026 amendment (official source, opens in a new tab)
- Recommends more than one common stair in blocks of flats with a top storey of 18 metres or more in height. It took effect in England on 30th September 2026 with transitional arrangements for schemes already under way.
Common questions
Fire strategy questions on high-rise residential buildings, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsIn England, a building that is at least 18 metres or seven storeys with at least two residential units. Care homes and hospitals meeting the height test are in scope for the construction gateways but not the in-occupation duties.
Guides
Guides for high-rise residential buildings.
What we deliver
Services for high-rise residential buildings.

Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Building Safety Case Reports
Building Safety Act 2022, England
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreOther sectors
All sectorsFire strategy for high-rise residential buildings
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply