HTM 05-02 is the Firecode guidance on fire safety in healthcare design, published by NHS England. Its 2015 edition was current in November 2026. It applies in England to new healthcare buildings, extensions, alterations and changes of use. It gives the minimum standards expected to meet Part B of the Building Regulations 2010 and accepts fire engineered alternatives.

Last reviewed
Reading time
13 minutes
Related service
Fire Strategy Reports
A white hospital corridor

What is HTM 05-02 and is it still current?

HTM 05-02 (opens in a new tab) is the Firecode document on fire safety in the design of healthcare premises. Its full title is Health Technical Memorandum 05-02: Firecode. Guidance in support of functional provisions (Fire safety in the design of healthcare premises). The current version is the 2015 edition, dated September 2015. It supersedes all previous versions. It applies in England.

Health Technical Memoranda give advice and guidance on the design, installation and operation of specialised building and engineering technology used in healthcare. HTM 05 is the fire safety series, one of nine core subjects numbered 00 to 08.

HTM 05-02 exists because hospitals cannot be treated like other buildings. Its executive summary says fire safety in healthcare depends on the interaction between physical fire precautions, the dependency of the patient, the fire hazards and the availability of enough trained staff to evacuate patients safely. A hospital fire strategy has to bring all four together. Our fire strategy reports for healthcare buildings are written to HTM 05-02 for that reason.

No newer edition, draft or consultation is listed on the NHS England publication page (opens in a new tab), checked on 23rd November 2026. The page says the document was first published on 2nd January 2007 and last updated on 4th November 2015. The page itself was updated on 26th January 2024. The 2026 edition of HTM 05-01 cites the 2015 edition of HTM 05-02 in its reference list without the "currently under review" note it gives to HTM 02-01.

Some of the 2015 wording has dated. HTM 05-02 refers to the 2006 Approved Document B and keeps its references to BS 5588 until HTM 05-02 itself is next revised. It also uses the older name for private building control bodies, which are now registered building control approvers. Treat those references as historical and check each one against current guidance before relying on it.

The Firecode suite: HTM 05-01, 05-02 and 05-03

NHS England says HTM 05-02 should be read alongside the other two documents in the Firecode suite. Each has a different job. HTM 05-02 deals with design. HTM 05-01 deals with how fire safety is managed. HTM 05-03 deals with operational provisions.

The HTM 05 Firecode documents in England, as listed by NHS England on 23rd November 2026
DocumentWhat it coversCurrent date
HTM 05-01 Managing healthcare fire safetyThe fire safety management system for healthcare organisations, including how the Fire Safety Order is appliedNew edition published 11th February 2026
HTM 05-02 Fire safety in the design of healthcare premisesDesign guidance to meet Part B of the Building Regulations in new and altered healthcare buildings2015 edition, last updated 4th November 2015
HTM 05-03 Operational provisionsA series of parts on training, alarms, furnishings, commercial enterprises, escape lifts, arson, laboratories, fire engineering, fire risk assessment and atriaSeries page updated 30th April 2024

The new HTM 05-01 (opens in a new tab) replaces the 2013 edition. Its own text says guidance on how to comply with Part B is contained in HTM 05-02. It adds the Building Safety Act 2022 as a third foundational legal pillar and introduces site or building fire information manuals. These hold the technical fire safety information needed for Regulation 38 and form part of the golden thread of information.

The HTM 05-03 series (opens in a new tab) changed in 2024. The revised Part B on fire detection and alarm systems now includes the management of false alarms. Part H, which dealt with reducing false alarms, has been withdrawn. Part K, guidance on fire risk assessments in complex healthcare premises, carries a date of 30th April 2024 on the NHS England page and comes with Word templates for primary and secondary fire risk assessments. Part J, guidance on fire engineering of healthcare premises, has a publication date of 8th January 2008 on the NHS England page.

Which buildings and work it covers

HTM 05-02 gives guidance on fire safety in the design of new healthcare premises and major new extensions. Paragraph 1.3 sets out the work it should be used for.

  • New healthcare buildings
  • New extensions to existing healthcare buildings
  • The parts of existing healthcare buildings used as means of escape from a new healthcare extension
  • Alterations to existing healthcare buildings
  • Change of use of an existing building or part of one to healthcare use

The last two apply whether or not the alteration or change of use counts as building work under the Building Regulations 2010. That matters on refurbishment schemes, where a client may assume that work outside building control is also outside Firecode.

HTM 05-02 applies to premises regulated by the Care Quality Commission that provide ten listed types of service, irrespective of ownership. The list runs from acute, hospice and rehabilitation services to diagnostic, urgent care and doctors' treatment services, with full definitions in Appendix H. The guidance should be used for all parts of healthcare buildings classed as Purpose Group 2a, Residential (Institutional), including integral ancillary departments. Where premises on the list are in Purpose Group 5, Assembly and Recreation, it should be limited to the measures needed to keep patients safe for the time it takes to evacuate them.

Construction is outside its scope. HTM 05-02 covers the completed building. Fire risk during the works falls under the Construction (Design and Management) Regulations 2015 and the Fire Safety Order. Where work is carried out in an occupied building, the fire and rescue authority enforces in the occupied parts.

Is HTM 05-02 mandatory?

HTM 05-02 says its purpose is to give guidance on the minimum standards of fire safety expected in healthcare premises to comply with Part B of Schedule 1 of the Building Regulations 2010. It says that, applied correctly, it will satisfy all the requirements of Part B. Approved Document B covers some of the more common building types. HTM 05-02 was prepared to give specific guidance for healthcare premises.

Firecode is guidance rather than law. HTM 05-03 Part J describes itself as best practice guidance with no statutory force. The 2026 HTM 05-01 says it is not mandatory unless specifically stated.

Approved Document B Volume 2 (opens in a new tab) makes the link from its side in paragraph 0.10. It says the Firecode documents take account of the particular characteristics of healthcare buildings and should be followed. It adds that Firecode contains managerial and other provisions outside the scope of the Building Regulations. It says the choice of strategy depends on how the building is designed, furnished, staffed and managed and on the needs of the patients.

Where designers follow BS 9999 instead, HTM 05-02 says they will need to satisfy themselves and the building control body that it adequately addresses Part B. It strongly recommends that they discuss the proposals with the building control body before starting work.

In practice the bar is higher than the word guidance suggests. HTM 05-02 says that where its principles are not followed, organisations should document how expectations are being met by equal and alternative means. It also says adherence to it will be taken into account as evidence towards compliance with the relevant legal requirements and standards. Its compliance evidence also supports the NHS Premises Assurance Model. On an NHS project, departing from it brings the derogation process described below.

The Fire Safety Order still applies once the building is in use. HTM 05-02 says the Order imposes a general duty to take such fire precautions as may be reasonably required. Responsibility rests with the responsible person, which for most healthcare organisations will be the employer. HTM 05-01 explains those requirements in full.

How the document is set out

The 2015 edition was restructured to follow Part B. After two opening chapters on application and principles, each chapter deals with one Part B requirement.

  • Chapter 1. How HTM 05-02 applies, fire safety information, consultation and qualitative design review, alternative solutions and use by competent persons
  • Chapter 2. Principles of fire safety in healthcare, including progressive horizontal evacuation, hospital streets, vertical escape, patient dependency, mental health and learning disability in-patient units and staffing
  • Chapter 3. B1 Means of warning and escape, covering detection and alarm, travel distances, escape widths, assisted evacuation, intensive care, operating departments and lighting
  • Chapter 4. B2 Internal fire spread (linings), covering roof lights and thermoplastic materials
  • Chapter 5. B3 Internal fire spread (structure), covering compartmentation, protected shafts and lobbies, fire stopping, fire hazard rooms, ventilation, cavity barriers and sprinklers
  • Chapter 6. B4 External fire spread
  • Chapter 7. B5 Access and facilities for the fire and rescue service
  • Appendices A to L, including periods of fire resistance, doors and doorsets, fire drawings and qualitative design review

The compartment sizes, sub-compartment triggers, travel distances and stair numbers are set out in our guide to progressive horizontal evacuation. That guide also explains the three stages of evacuation that the layout is designed around.

On sprinklers, HTM 05-02 does not require them in patient care areas except in buildings over 30 m in height. It does expect the design team to consider the advantages of life-safety sprinklers throughout the building or in specific areas. It says they limit the size of a fire, control its spread, give more time to evacuate and limit fire damage.

Consultation, management and the fire safety record

HTM 05-02 says the fire safety measures and the emergency evacuation strategy should be developed and agreed through discussion with four parties. They are the client user group, the design team, a fire service representative and the building control body. The client user group generally involves clinicians, nurses, managers, the fire safety advisor and the local security management specialist. Preparing the emergency evacuation plan starts during design.

The reason is that each clinical service presents its own problems, which HTM 05-02 says will only fully emerge during design. It says the design team and approving authorities should not assume that a compliant design will be safe. It has to be supported by a fully developed emergency plan, which the Fire Safety Order also requires. HTM 05-02 also says a design that relies on an unrealistic or unsustainable management regime cannot be considered to have met the requirements of the Building Regulations.

The output is a record. For all premises HTM 05-02 covers, a detailed record of the fire safety strategy, evacuation procedures, patient dependency and staffing levels will be required, together with operation and maintenance information. The consultation should produce all the information needed for Regulation 38, including the evacuation plan and its assumptions, escape routes, fire safety measures, high-risk areas and as-built plans. Appendix G covers fire drawings. HTM 05-02 is written on the understanding that competent persons will use it.

Departures, fire engineering and qualitative design review

HTM 05-02 describes one way of reaching an acceptable standard. Paragraph 1.21 recognises that the functional requirements may be met in other ways through a fire safety engineering approach. Those promoting the alternative are responsible for demonstrating that it satisfies the functional requirements and fire safety objectives of the document. Paragraph 1.20 expects NHS clients, designers, building control and fire authorities to exercise judgement based on a full understanding of the problem and of patient dependency.

For very large and complex projects, HTM 05-02 recommends a qualitative design review as detailed in PD 7974-0:2002. Appendix J says the team on a major project might include a fire safety engineer as chair, the client user group, the design team, a fire service representative and building control. It lists six main stages.

  • Review the architectural design and occupant characteristics
  • Establish fire safety objectives
  • Identify fire hazards and possible consequences
  • Establish trial fire safety designs
  • Identify acceptance criteria and methods of analysis
  • Establish fire scenarios for analysis

Findings should be recorded so that the philosophy and assumptions are explicit and can be readily checked by a third party. HTM 05-02 says that information should be contained in the fire safety strategy for the premises.

HTM 05-03 Part J (opens in a new tab) is the Firecode guide to fire engineering. It says fire engineering is mainly applied where the design is complex or innovative, where codes restrict design flexibility, where issues beyond life safety arise or where the Firecode-compliant solution is unnecessarily costly. In less complex buildings it may be simpler to apply HTM 05-02 directly. Part J also says no reliance is placed on external rescue by the fire and rescue service in healthcare design. Its assessment methods and report contents are covered in our guide to fire engineered solutions. Our fire engineering service carries out that work.

Derogations and new roles under HTM 05-01

The 2026 edition of HTM 05-01 sets out how NHS projects should treat departures from the standards. The starting point for all NHS healthcare projects at Project Initiation Document or Strategic Outline Case stage is full compliance. Derogations will potentially jeopardise business case approval and will only be considered in exceptional circumstances.

A schedule of derogations will be required for any project needing external business case approval. One may also be requested for projects that have gone through an internal approvals process. Derogations must be properly authorised by the project's senior responsible owner and informed and supported by appropriate technical advice. Departures should provide a degree of safety not less than that achieved by following the guidance.

HTM 05-01 also splits the former Authorising Engineer (Fire) role in two. One is the Independent Expert Adviser (Authorising Engineer). The other is the specialist Fire Engineer, who it says is the appropriate source of technical advice where detailed fire engineering solutions are needed, such as complex designs or fire strategy work. It names the IHEEM, the IFSM and the IFE as example professional bodies.

Existing sites need the same care. An NHS England reminder of 9th November 2022 says that before an area is brought into patient use or capacity is increased, a new fire risk assessment should be written in line with HTM 05-03 Part K and the area should comply with HTM 05-02. Minor variations that the fire safety advisor accepts should be recorded with any compensatory measures in the fire risk assessment.

Wales and Scotland

Wales and Scotland have their own healthcare fire design guidance.

Healthcare fire design guidance by nation
NationDocumentStatus
EnglandHTM 05-02, 2015 edition (NHS England)Guidance to meet Part B of the Building Regulations 2010
WalesWHTM 05-02, first edition (NHS Wales Shared Services Partnership, 2014)Guidance on minimum standards to comply with Part B of the Building Regulations 2010
ScotlandSHTM 81 Part 1, version 5, October 2022 (NHSScotland Assure)Supplementary to the non-domestic Technical Handbook under the Building (Scotland) Regulations 2004

In Wales, the users of WHTM 05-02 (opens in a new tab) include providers of NHS-funded healthcare facilities in Wales. NHS Wales Publication Notice 14/13 (opens in a new tab), dated 24th June 2014, says it covers new healthcare premises, major new extensions and refurbishment schemes and supersedes all previous versions of HTM 05-02. The document says HTMs issued in England are being superseded by Welsh editions. See our Wales page for projects there.

In Scotland, SHTM 81 (opens in a new tab) has three parts. Part 1 covers new premises, Part 2 covers fire engineering (version 1, July 2009) and Part 3 covers atria (version 1, April 2013). Part 1 (opens in a new tab) says local authority building standards will reference it as part of their compliance regime. Any methodology that varies from it should be evidenced to meet or exceed the benchmark standards. If a fire engineered design is proposed, the Health Board should appoint an independent third party assessor. Suppression should be fully considered for all new healthcare premises, extensions and structural refurbishments, with the rationale documented in the fire strategy. See our Scotland page.

Healthcare estates often include older buildings. Where one is listed, our guide to fire upgrades in listed buildings covers consent and historic fabric. For hospital design in any of the three nations, our fire strategy reports set out the evacuation strategy, the departures and the assumptions behind them in a form the estates team can manage.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

HTM 05-02 says it applies irrespective of ownership to premises regulated by the Care Quality Commission that provide the service types it lists, such as acute, hospice, rehabilitation, diagnostic and urgent care services. Ownership does not take a building outside its scope.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.