In England, an application needs a Gateway 1 fire statement if it involves a building of 18 metres or more or seven or more storeys with two or more dwellings or educational accommodation. Outline and section 73 applications are exempt. London major development should have a D12(B) Fire Statement, whatever its height. Wales and Scotland have no planning fire statement.

Last reviewed
Reading time
13 minutes
A street of brick terraced houses in Kensington

Two fire statements in England

England has two separate planning documents called a fire statement. The first is the national Gateway 1 fire statement required by article 9A of the Development Management Procedure Order 2015 (opens in a new tab). SI 2021/746 (opens in a new tab) applied it to applications for planning permission made on or after 1st August 2021, in England only. The second applies in Greater London only. It is the Fire Statement that London Plan Policy D12(B) asks major development to submit.

Wales and Scotland have neither. The decision in England turns on four checks: the building, the type of application, whether it is permitted development and whether the site is in London. Our guide to the Gateway 1 fire statement explains what the form contains. Our planning fire statements service prepares both documents.

Which fire statement a full planning application in England needs
SchemeGateway 1 formLondon Plan D12(B) Fire Statement
Involves a relevant building, outside LondonRequiredNot applicable
No relevant building involved, outside LondonNot requiredNot applicable
London major development involving a relevant buildingRequiredShould be submitted
London major development with no relevant building involvedNot requiredShould be submitted
London scheme below the major development thresholdRequired only if it involves a relevant buildingNot asked for. D12(A) still applies.

The two columns apply in their own right. A tall block of flats in London that is also major development needs both. The next section explains what makes a building a relevant building.

Step 1: does the scheme involve a relevant building?

Article 9A applies to an application for planning permission for three kinds of development. The first is development that provides one or more relevant buildings. The second is development of an existing relevant building. The third is development within the curtilage of a relevant building. The last two can catch work that does not create a tall building itself.

A relevant building is one that is 18 metres or more in height or contains 7 or more storeys and contains two or more dwellings or educational accommodation. A dwelling includes a flat. Educational accommodation means residential accommodation for boarders at school or for students on higher education, further education or 16 to 19 Academy courses.

The Building Safety Regulator's Planning Gateway One summary (opens in a new tab) says care homes, hotel accommodation and short-term holiday lets are not dwellings for this test. For sheltered or supported housing the deciding factor is whether residents would be expected to escape independently. Height is measured from ground level to the top floor surface of the top storey, ignoring roof-top plant storeys. The Gateway 1 guide sets out the measuring rules in full.

Hospitals and care homes fall outside Gateway 1. They can still be higher-risk buildings at Gateways 2 and 3. The government criteria (opens in a new tab) for those stages cover buildings with at least two residential units, care homes and hospitals that are at least 18 metres in height or have at least 7 storeys.

Step 2: which type of application is it?

If there is a relevant building, the type of application decides the rest. Article 9A(6) exempts outline applications and section 73 applications to develop land without complying with conditions previously attached. It also exempts a change of use that means a relevant building stops being one and a change of use within the curtilage that does not create a relevant building. The Building Safety Regulator publishes its approach to each type on the Planning Portal.

Gateway 1 fire statement position by application type in England
ApplicationPosition
Full planning permissionA fire statement form is required where article 9A applies. The Regulator declines to assess a full application that has no form because it lacks the required information.
Outline planning permissionNot a statutory requirement. Information can be given voluntarily. If there is not enough detail, the Regulator can ask for a condition requiring a fire statement form with a reserved matters application.
Reserved mattersThe Regulator usually asks the planning authority to attach a condition to the outline or hybrid permission requiring a fire statement form with the reserved matters application. It also asks to be consulted at that stage.
HybridA fire statement is needed for any part applied for in full that contains a relevant building or is within the curtilage of one. A reserved matters fire statement should include a fire service access plan of the whole site.
Section 73 (vary or remove conditions)No fire statement form is required. The authority can choose to consult the Regulator and this is usually appropriate where approved plans change.
Section 96A (non-material amendment)No fire statement form is required. The authority can choose to consult the Regulator. Changes to stairs and lifts may affect fire safety.
Material change of use by planning applicationA fire statement is required unless one of the two change of use exemptions applies.
Discharge of conditionsThe authority can choose to consult the Regulator. For schemes validated before 1st August 2021 the Regulator will usually return a no comment response.
Listed building and conservation area consentThe authority should decide whether a listed building consent application raises fire safety matters relevant to planning. Conservation area consent is unlikely to raise them unless the works affect fire service access.

Section 73 does not mean the scheme escapes scrutiny. The Regulator's page on section 73 applications (opens in a new tab) says that where the change makes a building a relevant building, it may comment on the whole development. The Planning Practice Guidance says the authority must consult on a section 73 application if it considers it appropriate to do so.

Outline does not mean no fire information later either. The Regulator's outline applications page (opens in a new tab) explains the condition route. Its guidance on the level of detail (opens in a new tab) it needs describes the reserved matters condition. Its hybrid applications page (opens in a new tab) covers mixed full and outline schemes.

Step 3: permitted development and prior approval

Some conversions and upward extensions in England go through prior approval under the General Permitted Development Order 2015 rather than a planning application. The Building Safety Regulator's prior approval page (opens in a new tab) says "There is no requirement to submit a fire statement form with an application for prior approval." A written fire safety statement is still needed where the fire risk condition is met. The government form is not.

The fire risk condition is met where the building will contain two or more dwellinghouses and satisfy the article 9A height condition of 18 metres or 7 storeys. The fire safety prior approval matters below apply from 1st August 2021.

  • Part 3 (opens in a new tab) Class MA, change of use from commercial, business and service uses to dwellinghouses. Prior approval covers the fire safety impacts on the intended occupants.
  • Part 20 (opens in a new tab) Classes A and AA, up to two additional storeys. Prior approval covers the fire safety impacts on the intended occupants. Where the existing building is 18 metres or more in height it also covers the fire safety of the external wall construction.

For these applications the Order requires a statement about the fire safety design principles, concepts and standards that have been applied to the development. The planning authority must consult the Building Safety Regulator on the fire safety impacts.

The Class MA provisions have named the Regulator in place of the Health and Safety Executive since 27th January 2026, under SI 2026/20 (opens in a new tab). The Part 20 provisions for Classes A and AA were changed to name it from 21st October 2026, under SI 2026/1056. The Planning Practice Guidance still names HSE.

For Part 20 the external wall matter needs a report from a chartered engineer or other competent professional. It must confirm that the external wall construction of the existing building complies with paragraph B4(1) of Schedule 1 to the Building Regulations 2010. The Regulator says it will raise a concern if the report is missing or lacks enough information about the external walls.

Class O, the older office to dwellinghouse right, has closed. Applications under it had to be made on or before 31st July 2021. Class AA is not permitted where the building's use as a dwellinghouse was granted only by Class MA.

The revised text of Part 20 on legislation.gov.uk, as at 23rd November 2026, contains the fire risk condition only in Classes A and AA and not in Classes AB, AC, AD and ZA. Our guide to fire strategy for a change of use covers conversions in more depth.

Step 4: is the site in Greater London?

In Greater London the London Plan 2021 (opens in a new tab) adds its own layer. Policy D12(A) applies to all development proposals and sets six fire safety criteria. Policy D12(B) says all major development proposals should be submitted with a Fire Statement, which it describes as an independent fire strategy produced by a third party, suitably qualified assessor. Part B has no height test.

The London Plan glossary summarises major development as 10 or more dwellings or a site of 0.5 hectares or more. For other uses it means 1,000 square metres of floor space or a site of 1 hectare. The full definition is in Part 1 of the Development Management Procedure Order 2015.

Both regimes can apply to one scheme. A tall residential major scheme in London needs the Gateway 1 form and a D12(B) Fire Statement. In a press release of 14th February 2022 (opens in a new tab) the GLA described its guidance as in addition to the government's fire safety considerations, which apply only to a limited number of buildings at the planning application stage.

Where lifts are installed, Policy D5(B5) also asks for at least one evacuation lift per core. The Building Safety Regulator says it is not able to confirm compliance with London Plan policy. That is a matter for the planning authority and/or the GLA.

For London applications other than full planning permission, check the borough's local validation list. Councils publish their own validation requirements. The GLA's withdrawn 2021 draft guidance included a table of application types. That table was never adopted and is not a rule.

The Draft London Plan, consulted on from 16th July to 15th October 2026, would replace the D12(B) Fire Statement under draft policy MBUL10. Major developments with residential accommodation or uses in purpose groups 1 and 2 of Approved Document B would instead need a competent fire engineer's confirmation in the design and access statement. Formal publication of the new plan is timetabled for March 2028. The D12 guide covers the draft in detail.

Wales: the fire and rescue authority as consultee

There is no planning fire statement in Wales. A search of Welsh statutory instruments on legislation.gov.uk for "fire statement" returned no results on 23rd November 2026. Fire and rescue authorities are statutory planning consultees instead. The Development Procedure (Consultees) (Wales) (Miscellaneous Amendments) Order 2021, SI 2021/1189 (W. 297) (opens in a new tab), added "The Fire and Rescue Authority concerned" to Schedule 4 of the Development Management Procedure (Wales) Order 2012 (opens in a new tab). Those provisions came into force on 24th January 2022.

A Welsh Government Chief Planner letter of 1st November 2021 (opens in a new tab) explains the change. For applications validated on or after 25th April 2022, it lists the development on which planning authorities must consult the fire and rescue authority. The letter calls the 2012 Order the DMPWO.

  • (a) waste development (as defined in Article 2 of DMPWO)
  • (b) the provision of dwellinghouses where either the number of dwellinghouses to be provided is 10 or more or the development is to be carried out on a site having an area of 0.5 hectares or more and it is not known whether the number of dwellinghouses to be provided is 10 or more
  • (c) the provision of a building or buildings where the floor space to be created by the development is 1,000 square metres or more
  • (d) development on a site having an area of 1 hectare or more
  • (e) development which provides ten or more flats (whether by increasing the number of flats within an existing building or otherwise)
  • (f) development which provides residential accommodation of ten or more rooms, not contained in dwellinghouses or flats, which are not solely used for cooking purposes and are not toilet facilities, service rooms, corridors, laundry rooms, hallways or utility rooms
  • (g) development which provides residential accommodation of ten or more rooms contained in a dwellinghouse or flat used as a house in multiple occupation, which are not solely used for cooking purposes and are not toilet facilities, service rooms, corridors, laundry rooms, hallways or utility rooms

The letter says points (f) and (g) are intended to cover other forms of residential development, including but not limited to hotels, care homes, student accommodation and HMOs. Responses focus on two things. Access means adequate access to a site for appropriate numbers and types of fire appliance. Water means an adequate supply of water for firefighting. For other development, consultation is at the planning authority's discretion and fire and rescue authorities are not required to give a substantive response.

Developers must also consult the fire and rescue authority before applying for waste development, 10 or more dwellinghouses (or a site of 0.5 hectares where the number is unknown), 1,000 square metres of floor space or a site of 1 hectare. The consultation must be shown in the pre-application consultation report for applications submitted on or after 25th April 2022.

The Planning (Wales) Act 2026 received Royal Assent on 27th April 2026. Most of its provisions await commencement. Our guide to fire strategy in Wales covers the building regulations side. Our Wales page sets out the work we do there.

Scotland: fire is dealt with at building warrant stage

Scotland has no planning fire statement. The revised Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 (opens in a new tab) contain no occurrence of the word fire. The consultees in Schedule 5 do not include the fire and rescue service. Fire safety is handled at building warrant stage.

A search of Scottish statutory instruments on legislation.gov.uk for "fire statement" also returned no results on 23rd November 2026. Our guide to fire strategy in Scotland covers building warrants. Our Scotland page sets out the work we do there.

Mistakes that slow a planning decision

The official sources flag these points. Each one is avoidable if the threshold check is done before the application is drawn up.

  • Leaving out the form on a full application. The Building Safety Regulator declines to assess until the planning authority obtains one.
  • Assuming outline means no fire information later. A condition can require the form at reserved matters.
  • Assuming a section 73 or section 96A change escapes scrutiny. The authority can still consult the Regulator.
  • Confusing the two London statements. The Gateway 1 form and the D12(B) Fire Statement are separate requirements.
  • Leaving out the external wall report on a Part 20 prior approval. The Regulator will raise this as a concern.
  • Applying for Class AA on a building converted under Class MA. Class AA is not permitted in that case.
  • Describing fire safety features as indicative. The Regulator asks applicants to avoid that word and other ambiguous terms.
  • Treating the fire statement as a building regulations check. The Planning Practice Guidance says it will not duplicate or require compliance with the Building Regulations or the Fire Safety Order.

Planning is only the first stage. Gateways 2 and 3 apply to a wider set of buildings, including care homes and hospitals. Our guide to the Building Safety Act gateways shows how the three stages fit together.

Our planning fire statements service confirms which statements a scheme needs and prepares them. Our building safety gateway support carries the work into Gateway 2.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

The Gateway 1 form still applies if the building has 7 or more storeys and contains two or more dwellings or educational accommodation. In London, major development should be submitted with a D12(B) Fire Statement whatever its height.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.