No official source publishes a fire strategy fee. The fee is agreed privately and depends on the building's size, height, use, design stage, route to compliance and any modelling. Statutory fees sit on top: building control charges and, for higher-risk buildings in England, Building Safety Regulator charges such as £195 with a Gateway 2 application plus £156 an hour.

Last reviewed
Reading time
12 minutes
Related service
Fire Strategy Reports
A glazed office building on a Milton Keynes boulevard

Why there is no published price

No price for a fire strategy report is set or published on GOV.UK, by the Building Safety Regulator or in legislation. The fee is a private matter between whoever commissions the strategy and the consultant who writes it. Each one is quoted against a scope for a particular building.

Official sources do publish two things that help with a budget. The first is the set of statutory fees that sit alongside the strategy, for building control and for the Building Safety Regulator. The second is a record of what some public bodies have paid for fire strategy work, in contract award notices. Both are set out below, after a plain explanation of why fees vary.

If you are still deciding whether your project needs a strategy at all, start with our guide on whether you need a fire strategy. Our fire strategy reports page explains what the document covers.

What drives the cost of a fire strategy

No official statement exists on what drives fire engineering fees. What follows is general professional explanation, not an official schedule. Every consultant weighs these points differently. They are still the questions that decide how much engineering time a strategy needs.

  • Size: more floor area usually means more escape routes, compartments and drawings to check and record.
  • Height: taller buildings bring firefighting shafts, smoke control and more demanding structural fire resistance. In England height can also bring a building into the higher-risk building regime.
  • Use: flats, hospitals, schools, offices and warehouses follow different guidance and carry different risks. Sleeping accommodation and vulnerable occupants usually take more analysis.
  • Design stage: an outline strategy at concept stage is shorter than a full technical strategy that has to match coordinated drawings. Many projects need both, written in turn.
  • Route to compliance: a design that follows Approved Document B closely needs less justification than one that uses another code or a fire engineered solution argued from first principles.
  • Modelling: smoke, evacuation or structural fire modelling adds analysis and reporting time.
  • Existing buildings: a retrospective strategy depends on survey work and on how much of the original information survives.
  • Approver and process: a higher-risk building in England needs a fire and emergency file for the Building Safety Regulator, which is more documentation than many full plans applications. Queries and resubmissions add time.
  • Drawings and meetings: many briefs ask for fire strategy drawings, building control meetings and fire service consultation support as well as the report.

Take a hypothetical single storey office extension designed closely to Approved Document B. It needs a short, clear strategy. Now take a hypothetical 20 storey residential tower with an engineered smoke control system. It needs a much longer strategy with modelling, drawings and a fire and emergency file. Both are called a fire strategy. The difference in effort is what the difference in fee reflects.

Our fire strategy report example shows the contents a full strategy carries, which is a useful check on what a quote includes.

What public buyers have published

Public bodies publish contract award notices on Contracts Finder and Find a Tender. The notices below are examples of what public buyers have published for fire strategy and related fire consultancy work. Each is a single record with its own scope. They are not a price list and they are not market rates.

Buyers are described by type. The year is the year of the award unless the table says otherwise. Values are copied exactly as each notice publishes them.

Selected public sector awards for fire strategy and fire consultancy work, as published
Buyer typeYearScope as the notice describes itValue as published
A city council2026Four separate awards, each for the fire strategy, fire strategy drawings and fire and emergency file of one named block£17,446.53, £17,446.53, £17,200 and £17,472.15
An NHS foundation trust2026Fire strategy documents for the wards and basement of a tower building, to support Building Safety Regulator applications£18,775.51
An NHS foundation trust2026Fire strategy surveys and reports. The notice gives no building count£111,507.50
A city council2024Individual fire strategy documents for all of its high-rise blocks. The number of blocks is not stated£30,305
A borough council2024A retrospective fire strategy for its high-rise buildings£49,000
A metropolitan borough council2023 (contract start)A fire engineer for one development from Stage 2 to Stage 5, including the detailed fire strategy report and fire service consultation£35,000
A council2020Review of architectural designs and a fire strategy advice report for a museum project£15,000
A public research body2023Updating an existing fire strategy to reflect changes in the building's structure and occupancy£27,400
A central government department2023Fire strategies for 54 probation service premises£144,210
A central government department2024Fire strategies for up to 199 probation service properties£499,547.55
A university2025A third-party fire strategy and compartmentation review of selected buildings£60,000 excluding VAT, £72,000 including VAT
A borough council2025Fire consultancy services for a depot project£88,500 excluding VAT, £106,200 including VAT

Read these figures with care. A value may include VAT or not depending on the notice. Most Contracts Finder notices do not say either way. The two Find a Tender notices in the table state both figures.

The scope differs from contract to contract. Some cover one building and one covers up to 199 properties. Some include drawings and Gateway 2 material and others are a short advice report. Several notices do not say how many buildings they cover. Dividing a total by a guessed number gives a misleading figure.

Framework notices also appear in the records. A framework total covers every call-off made under it. It is not the price of any one strategy. One social housing procurement consortium's fire engineering lot weighted its award criteria at 70 for quality and 30 for price.

Building control charges in England

Building control is paid for separately from the fire strategy. GOV.UK's guidance on applying for building regulations approval (opens in a new tab) says local authorities base their fees on their costs. It says what you pay depends on the type of work involved, site inspections, the number of dwellings in the building and the total floor area, for example for extensions.

The same page says private registered building control approvers "negotiate their fees directly with you". It also says you might not have to pay a fee for works carried out solely for a person with a disability.

The law behind council charges changed recently. SI 2026/1094 (opens in a new tab), the Building (Local Authority Charges and Amendments Relating to Charging) (England) Regulations 2026, replaced the 2010 charges regulations in England from 6th November 2026. Regulation 5(1) says: "A local authority must ensure that, taking one financial year with another, the charges payable under a charging scheme as far as possible equate to the costs incurred by the local authority in performing their chargeable functions and providing chargeable advice."

Those costs may include a reasonable proportion of the authority's overheads, depreciation and the cost of capital. Each council must publish its charging scheme on its website at least seven days before the scheme takes effect. Regulation 6(1) says the client must pay the charge for the chargeable functions performed on the client's project.

Schemes made under the 2010 regulations continue in force as if made under the new ones. Any free hour provision in an old scheme stopped applying on 6th November 2026. The actual figures for a project are in the published scheme of the council concerned.

Building Safety Regulator fees for higher-risk buildings

For a higher-risk building in England the Building Safety Regulator (BSR) charges under its own scheme. The Building Safety Regulator charging scheme 2026 to 2027 (opens in a new tab) was updated on 8th April 2026 and applies to England. Its chargeable functions are defined in the Building Safety (Regulator's Charges) Regulations 2023. The main charges a fire strategy touches are below.

Selected BSR charges in the 2026 to 2027 scheme
StepCharge with the applicationTime and other costs
Gateway 2 building control approval application£195£156 per hour worked for BSR staff, plus any costs to BSR of relevant authorities and third parties
Gateway 3 completion certificate or partial completion certificate application£234£156 per hour worked for BSR staff, plus any costs to BSR of relevant authorities and third parties
Change control application£195£156 per hour worked for BSR staff, plus any costs to BSR of relevant authorities and third parties
Notifiable change£116 with the notification£156 per hour worked for BSR staff, plus any costs to BSR of relevant authorities and third parties
Inspections during constructionNo fixed charge£156 per hour worked for BSR staff, plus any costs to BSR of relevant authorities and third parties
Higher-risk building registration£251Any costs to BSR of relevant authorities and third parties. No hourly charge is listed

The scheme names the client as the payer for the Gateway 2, Gateway 3, change control, notifiable change and inspection charges. The principal accountable person pays the registration charge. It explains that hourly rates are used where the amount of regulatory effort may vary, as it does for higher-risk buildings. The hourly rate is blended, which means it includes administration and management time. In practice a clear and complete application should take less of that time than one that generates queries.

Charges that must accompany an application are non-refundable if the application is declined, other than as the schedules specify. The application charge is triggered by each submission. A declined application that is later resubmitted is therefore likely to mean a further charge and more hourly time.

These are the figures for 2026 to 2027. Check the current scheme on GOV.UK before budgeting for a later year. Our guide to the Building Safety Act gateways explains where each charge falls in the process.

Fire and rescue service time and decision periods

BSR's own hourly rate is not the only time charge on a higher-risk building. Annex B of the charging scheme explains that relevant authorities assist BSR through a multi-disciplinary team that BSR convenes. Their reimbursement rates are determined independently. The scheme notes that the National Fire Chiefs Council has published hourly rates for fire and rescue services in England.

The NFCC hourly rate page (opens in a new tab) gives £175.00 per hour for fire and rescue service staff chargeable from 1st April 2026 to 31st March 2027. It describes these as rates for work done for the Building Safety Regulator on advice requested under section 13 of the Building Safety Act 2022. The rate for 2025 to 2026 was £151.00 per hour. The NFCC says that in 2025 the rates were aggregated into a single rate for all roles.

Where BSR needs expert or third-party support, the scheme says the cost is charged to the payee at a cost recovery rate that differs from BSR's hourly rate.

Time has a cost of its own. Under the Higher-Risk Buildings Procedures Regulations 2023 (opens in a new tab), BSR must decide an application for a new higher-risk building within 12 weeks and one for work to an existing higher-risk building within 8 weeks. A completion certificate application must be decided within 8 weeks. A programme that waits on a queried application carries costs that no fee table shows. Our guide to the Gateway 2 fire strategy covers what BSR expects to see.

Why the work is still paid for

The government's Grenfell Tower Inquiry progress report (opens in a new tab), updated on 2nd October 2026, states that "a fire safety strategy is not a required document to be submitted as part of an application". That does not remove the work. The same design information is usually still needed under another name or for another purpose.

For a higher-risk building in England, BSR's guidance on preparing a building control approval application (opens in a new tab) says "The fire and emergency file is often known as a 'fire strategy'." The city council awards in the table price the strategy, the drawings and the fire and emergency file together.

The cost of the work may change in future. On 17th December 2025 the government said it will legislate so that "only registered individuals will be legally permitted to use the title 'fire engineer' or carry out restricted fire engineering functions". It said its further work will consider "the potential impacts or costs for residents, contractors, employers and wider society". Our guide on who writes a fire strategy explains that reform.

Wales and Scotland

The BSR charging scheme applies to England only. In Wales the council has been the building control authority for higher-risk buildings since 1st July 2026. BSR's fees therefore do not apply to Welsh projects. SI 2026/1094 also applies to England only. Ask the council concerned about its charges for a Welsh project. Our guide to higher-risk buildings in Wales explains that regime and our Wales page covers projects there.

Scotland uses building warrants rather than the building control system in England and Wales. Its fees are not covered here. Our guide to fire strategy in Scotland explains how the warrant process works.

Getting a quote you can compare

A quote is only as good as the scope behind it. Two quotes for the same building can differ because one includes drawings, meetings and later updates and the other does not. Asking each consultant the same questions makes them comparable.

  • Send current drawings, the RIBA stage reached and a description of the building and its intended use.
  • Name the building control body and say whether the building is likely to be a higher-risk building in England.
  • Ask whether fire strategy drawings are included and how many revisions the fee covers.
  • Ask whether meetings with building control and support with fire service consultation are included.
  • Ask whether any modelling is expected and whether it is priced separately.
  • Ask what updating the strategy at a later stage would involve.

If a strategy already exists and only needs checking, a fire strategy review is a different and usually narrower scope. Designs that rely on modelling or an engineered solution fall under fire engineering.

We quote a fixed fee once we have seen the drawings and we reply the same day. Send your drawings through our fire strategy reports page or the contact page.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

No official source sets or publishes a price. The fee depends on the building, the design stage and the scope of work. Published public sector awards are single records with their own scopes and are not a guide to market rates.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.