Wales and Scotland

In Scotland a fire strategy is used to show the council verifier how a design meets Section 2 (Fire) of the Technical Handbooks before a building warrant is granted. No provision specific to domestic buildings mandates a strategy. A Fire Safety Design Summary must accompany the completion certificate for a new non-domestic building or a conversion to one.

Last reviewed
Reading time
13 minutes
Related service
Fire Strategy Reports
The Old Town of Edinburgh seen across Princes Street Gardens

How the Scottish building standards system works

Scotland runs its own building standards system under the Building (Scotland) Act 2003 (opens in a new tab). The Scottish Government describes the Act as the primary legislation under which the system operates. All of it except sections 6 and 53 came into force on 1st May 2005. The Building (Scotland) Regulations 2004, which set the mandatory functional standards, came into force on the same day.

Section 8 (opens in a new tab) of the Act requires a building warrant for construction or demolition, for the provision of services, fittings or equipment and for any conversion. The Scottish Government's response to the Grenfell Tower Inquiry says a building warrant is required before work can begin on site.

The Scottish Government says verifiers are responsible for granting permission for work to be done and for a completed building to be occupied. The first permission is the building warrant and the second is acceptance of the completion certificate. A fire strategy serves both stages. Our fire strategy reports for Scottish buildings are written to the Technical Handbooks rather than to Approved Document B.

The Procedural Handbook (opens in a new tab) says that at present the only bodies appointed as verifiers are the 32 Scottish local authorities, each for all work in its own area. The Scottish Government's annual report for 2024 to 2025 says all 32 are appointed until 30th April 2029. The Grenfell response says the commercial issues identified in the delivery of building control in England and Wales are not relevant in Scotland. Our Scotland page covers projects across the 32 council areas.

Which Technical Handbook applies to your warrant?

Guidance on meeting the standards is in two Technical Handbooks, one Domestic and one Non-domestic. Each is guidance issued under section 4(2) of the 2003 Act. The current editions are the April 2026 Domestic Technical Handbook (opens in a new tab) and its Non-domestic equivalent, both Version 1.0 dated 9th March 2026.

The handbooks apply by date. The Scottish Government (opens in a new tab) says the regulations, standards and guidance apply based on the date a building warrant application is submitted. For work that needs no warrant, the date the work starts governs. The April 2026 edition applies to warrant applications submitted on or after 6th April 2026.

The Scottish Government's summary of changes calls the March 2026 documents interim. It said the full handbooks would be published in summer 2026. As at 26th November 2026 the Scottish Government still lists the April 2026 editions as current. Check which handbook was in force on the date your warrant application was submitted and quote that edition in the fire strategy.

Section 2 (Fire) of each handbook covers 15 fire standards, numbered 2.1 to 2.15. The Scottish Government describes Section 2 of the domestic handbook as the Scottish equivalent of Approved Document B in England. Our guide to Scottish Building Standards Section 2 explains each standard and the dates of the main changes.

Is a fire strategy required in Scotland?

The Scottish Government's call for evidence on fire safety (opens in a new tab) says that at present there are no provisions specific to domestic buildings which mandate the production of a fire safety strategy. It adds that a simple fire safety design summary is sought for new non-domestic buildings, whether or not fire engineering principles are applied.

The handbooks do say what a strategy should do. Clause 2.0.7 says the objectives of any fire safety strategy should be established first and that designers and verifiers should be aware of the importance of the design assumptions. It gives the example that the strategy should include an assessment of system reliability. It also says the fire strategy should preferably support any fire safety risk assessment required under Part 3 of the Fire (Scotland) Act 2005.

In practice a written strategy is the clearest way to show a verifier how a design meets Section 2. It sets out which standards follow the guidance and where an alternative approach is used. It gives the fire and rescue service one document to comment on when it is consulted. For a non-domestic building it is also the natural source for the Fire Safety Design Summary at completion.

Where a design departs from the guidance, clause 2.0.7 says the fire engineer, the verifier and the fire and rescue service should be consulted early in the design process. For holistic designs the verifier and the fire and rescue service should be consulted as part of the Qualitative Design Review. A comparative study should aim to show that the design as a whole presents no greater risk to occupants than a similar building designed to the handbook guidance.

Clause 2.0.7 also says not all cases of variance from the guidance will require the appointment of a fire engineer. It refers to the Scottish Government's 2010 document A simplified approach to alternative fire safety strategies for additional advice. Our fire engineering service covers the cases that do need one. Our guide to fire engineered solutions explains the method.

The Fire Safety Design Summary

The Building (Miscellaneous Amendments) (Scotland) Regulations 2013 (opens in a new tab), SSI 2013/143, came into force on 1st October 2013. They inserted regulation 41(bd) into the Building (Procedure) (Scotland) Regulations 2004, the regulation on submitting completion certificates. Paragraph (bd) requires a fire safety design summary where the completion certificate relates to the construction of a new non-domestic building or a conversion to one.

The same regulations define a fire safety design summary as information on the design and construction of the building and on the services, fittings and equipment provided in or in connection with it, which will assist in the operation and maintenance of the building for fire safety purposes. They also add fire safety design summaries to the records verifiers keep.

The Procedural Handbook restates the rule at paragraph 5.2.3. Paragraph 5.2.2 says guidance on a fire design summary is available on the Building Standards Division website. Neither the regulations nor the Procedural Handbook list headings for the summary. Check the Division's guidance and agree the content with the verifier early.

Domestic buildings are outside regulation 41(bd) at present. The call for evidence says the Scottish Government will explore introducing a Fire Safety Design Summary process for certain domestic buildings at both the design and completion stage. That is a proposal and not yet a requirement.

Write the strategy so the summary can be compiled from it at completion. A strategy that already records the design assumptions, the fire safety measures and the management the building relies on makes the summary a short task.

Fire and rescue service consultation

Regulation 11 of the Building (Procedure) (Scotland) Regulations 2004 (opens in a new tab) says the verifier shall consult the relevant fire authority on a warrant application in four cases.

  • A non-domestic residential building.
  • A non-domestic, non-residential building where the design is not in accordance with the guidance issued by the Scottish Ministers.
  • A domestic building with a storey height over 18 metres.
  • A domestic building with a storey height over 7.5 metres up to 18 metres where the design is not in accordance with the guidance.

The Procedural Handbook says verifiers take account of the opinions of consultees but are not bound to follow them. It also says the consultation should not be confused with the Scottish Fire and Rescue Service's acceptance or rejection of the fire risk assessment required by the Fire (Scotland) Act 2005. The warrant and the risk assessment of the occupied building are separate processes.

Some applications must also be notified to the Scottish Government's Building Standards Division. A letter to council verifiers (opens in a new tab) published on 1st November 2023 lists six kinds. They are developments with any storey more than 60 metres high, dwellings with a floor area over 200 square metres, non-domestic buildings whose design does not follow the guidance, domestic buildings over 7.5 metres whose design does not follow it, applications referring to an external wall cladding system assessed to BR 135 when tested to BS 8414 and any conversion of a traditional building to a residential building, hotels included. The letter says the determination of the application rests with the local authority.

The fire and rescue service publishes its own water planning and building warrant information (opens in a new tab). It says that when a proposed property is over 7.5 metres in height the drawings submitted must clearly indicate a suitable parking space for a fire emergency vehicle. That space must be within 18 metres of the relevant dry riser inlet.

Completion certificates and occupation

Section 17(1) (opens in a new tab) of the 2003 Act says that after the work is complete the relevant person must submit a completion certificate to the verifier. The Grenfell response says the relevant person certifies that the work was carried out in accordance with the approved building warrant plans and details and constructed in compliance with building regulations. Occupying the building before the certificate is accepted needs the verifier's permission under section 21.

The Procedural Handbook has a table of information to accompany a completion certificate submission. Under fire it lists these items.

  • Fire detection and alarm certificate.
  • Automatic fire suppression system commissioning certificate.
  • Emergency lighting certificate.
  • Fire and smoke dampers commissioning certificate.
  • Smoke ventilation system commissioning certificate.
  • Smoke curtain drop test commissioning certificate.
  • Intumescent paint or cladding certificate.
  • Fire door installation inspection report.
  • Fire rated glazing and framing certificate.
  • Fire stopping inspection report.
  • Dry fire main commissioning certificate.
  • Fire safety design summary.

In blocks of flats the completion certificate for an individual flat cannot be accepted until the common areas affecting that flat are complete. The Procedural Handbook gives the common stairs or landings and the access and facilities for fire-fighting as examples. Where flats are to be handed over in phases, programme the fire-fighting facilities in the common parts early.

The Building Safety Act and Scotland

Section 169(1) (opens in a new tab) of the Building Safety Act 2022 says that, subject to the provisions that follow it, the Act extends to England and Wales only. The Scottish Government's response to the Grenfell Tower Inquiry Phase 2 report (opens in a new tab), published on 25th March 2025, says the 2022 Act is relevant to buildings in England that are within scope of the new regime. It describes those higher-risk buildings as at least 18 metres or seven storeys high with two or more residential units.

For a Scottish project the approval route is the building warrant and completion certificate process described above, whatever the height of the building. The gateway applications to the Building Safety Regulator used for higher-risk buildings in England are not part of it. Our guide to Building Safety Act gateways explains the English process for comparison.

Scotland has its own term, the high-risk building. The Grenfell response says the Scottish definition has a lower height limit for residential buildings of 11 metres. It also includes public, community, health and residential care buildings regardless of storey height.

Fire safety approvals in England and Scotland
ItemEnglandScotland
Fire guidanceApproved Document BSection 2 (Fire) of the Domestic and Non-domestic Technical Handbooks
Who checks the designA building control body, with the Building Safety Regulator for higher-risk buildingsThe council as verifier for all work in its area
Tall residential buildingsBuilding Safety Act 2022 regime for buildings at least 18 metres or seven storeys with two or more residential unitsNo Building Safety Act regime. Compliance Plan Approach guidance for high-risk buildings
Occupied premisesRegulatory Reform (Fire Safety) Order 2005Part 3 of the Fire (Scotland) Act 2005

Planning in Scotland carries no fire statement. The Development Management Procedure (Scotland) Regulations 2013 (opens in a new tab) contain no reference to fire. The Scottish Fire and Rescue Service is not a statutory planning consultee. National Planning Framework 4 contains no fire policy.

Wales differs again. Our guide to fire strategy in Wales sets out how the rules there compare with England.

High-risk buildings and buildings in use

Scotland's own work on high-risk buildings is the Compliance Plan Approach (opens in a new tab). Guidance was published on 5th January 2026 and verifiers have been expected to use it from 1st April 2026. It covers these high-risk buildings.

  • Domestic or residential buildings higher than 11 metres
  • Educational, community and sport buildings
  • Non-domestic public buildings under local authority control
  • Hospitals
  • Residential care buildings

The industry guidance (opens in a new tab), dated 28th May 2026, phases the approach in. New-build high-risk buildings and major cladding remediation works come first, from 1st April 2026. All other major works to high-risk buildings follow from 1st January 2027. The guidance anticipates legislative change between 2026 and 2031 to mandate the approach and introduce the Compliance Plan Manager role.

Two points in the industry guidance bear directly on the fire strategy. It sets pre-warrant engagement at least 12 weeks before the first building warrant submission. It also says the use of staging to introduce a separate stage for the fire strategy must be agreed in advance with the building standards verifier.

The Compliance Plan Manager will become a mandatory role only after legislation is amended. The guidance says the relevant person, normally the building owner, appoints the Compliance Plan Manager rather than the builder or developer. A consultation also proposed raising the maximum penalty for offences from £5000 to £50,000 with a custodial sentence of up to two years. That proposal is not yet law.

Once a building is in use, Part 3 of the Fire (Scotland) Act 2005 (opens in a new tab) requires dutyholders to carry out a fire safety risk assessment. The Scottish Fire and Rescue Service enforces it for most premises. Domestic premises are excluded. The Act treats common stairs and passages used by more than one dwelling as domestic premises. The Regulatory Reform (Fire Safety) Order 2005 used in England extends to England and Wales only.

For existing tall blocks the Scottish Government published practical guidance, Fire safety: existing high rise domestic buildings, on 28th February 2022. It is for multi-storey blocks and tenemental buildings with a storey over 18 metres above the ground but none above 60 metres, of all tenures. It applies to buildings with a stay put policy.

Mistakes that cost time on Scottish projects

  • The strategy uses English terms. A Scottish strategy should refer to the building warrant, the verifier, the completion certificate and the relevant person instead of Approved Document B, gateways or a registered building control approver.
  • Work starts before the warrant is granted. The Grenfell response is clear that a building warrant is required before work can begin on site.
  • The fire engineer is engaged late. Clause 2.0.7 says it is common for fire engineers and regulators to be engaged relatively late in the design process to resolve fire safety issues and calls this unhelpful.
  • The design is compared with a worst case. The same clause says using unrealistic worse case scenarios of a code compliant design to justify deviations is not the intent of the guidance. It also warns against computational fluid dynamics where the deviations would not merit such an exercise.
  • The pre-warrant meeting is skipped. The Procedural Handbook says such a meeting allows initial discussion of key aspects of design such as fire safety and the means of escape strategy.
  • Temporary occupation is allowed to lapse. The Procedural Handbook says continued occupation after the permitted period means the building is deemed to be occupied illegally and an offence is committed.

Our fire strategy review service checks an existing Scottish strategy against the handbook that applies to its warrant date.

To discuss a building warrant project, see our fire strategy reports service or contact us with the drawings and the date the warrant application will be submitted.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

The Scottish Government says no provision specific to domestic buildings mandates a fire safety strategy. A new non-domestic building needs a Fire Safety Design Summary with its completion certificate. In practice a strategy is the clearest way to show the verifier how the design meets Section 2.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.