Building Safety Act 2022, England

A building safety case is the body of evidence that demonstrates a higher-risk building is safe to occupy. The safety case report submitted to the Building Safety Regulator is the summary of that case. We help Accountable Persons build both, with the fire strategy evidence produced in-house.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Written to
Building Safety Act 2022, Building Safety Regulator, 18 metres or 7 storeys
Signed off by
A Chartered Engineer (CEng)
Scroll

Overview

What is a building safety case report?

The body of evidence that demonstrates your building is safe to occupy

A building safety case is the principal mechanism under the Building Safety Act 2022 by which Accountable Persons demonstrate that a higher-risk building is safe. It encompasses the fire and structural safety risk assessment, the management systems in place to control those risks and evidence that the building meets the required standard of safety.

Higher-risk buildings are buildings in England that are at least 18 metres or seven storeys in height with at least two residential units. All must be registered with the Building Safety Regulator and the Accountable Person must maintain the safety case throughout the life of the building.

The report is the argument. The golden thread is the evidence behind it. A safety case report citing information the thread cannot produce will not withstand scrutiny, which is why we build the two together where a client needs both.

Standards and legislation

Building Safety Act 2022
Establishes the requirement for safety cases and BSR registration for higher-risk buildings.
Building Safety Regulator
Receives and reviews safety case reports and takes enforcement action where required.
18 metres or 7 storeys, 2 or more dwellings
The definition of a higher-risk building in occupation under the Act.
Fire Safety Order 2005
The fire risk assessment the safety case draws on sits under the Order.

Contents

What a building safety case report includes

The information a safety case report must carry

01

Building information

Basic building information, the people responsible for it and the construction methods and materials.

02

Structural condition

The structural condition of the building and a record of building work, refurbishment and remediation.

03

Fire safety measures

The fire strategy, the fire safety measures in place and how they are maintained.

04

Risk assessments

The building safety risk assessments covering fire and structural failure.

05

Emergency plan

The emergency plan and the evacuation strategy for the building.

06

Management systems

The safety management systems that keep everything above working.

Purpose

What a building safety case report achieves

Four things a good safety case achieves

  1. 01Prevent major incidents related to fire and structural failure
  2. 02Ensure a proactive and consistent approach to managing building safety risk
  3. 03Provide the Building Safety Regulator with evidence of safety measures and compliance
  4. 04Give a clear account of the building's safety status and the steps taken to manage risk

Our process

How the work runs.

  1. 01

    Initial set up

    We run through the process with you and give you a clear overview of the documents and evidence you will need.

  2. 02

    Data gathering

    We set up a system for gathering data, identify who provides which evidence and break the report into manageable sections with a schedule.

  3. 03

    Build the report

    We develop the report itself, bringing the evidence into a clear, logical narrative that demonstrates how risks are controlled.

  4. 04

    Review and ongoing support

    We advise on review cycles, on updating the case after any change to the building and on how it fits with your wider fire risk management.

What you get

  • A structured safety case report ready for the Building Safety Regulator
  • A retrospective fire strategy where the building has none
  • An evidence index that resolves to documents in the golden thread
  • A review and update schedule
Sheet
FS-08
Fee
Fixed, agreed first

Why us

Engineered in-house, not subcontracted.

01

In-house fire engineering

The fire safety expertise a safety case rests on, delivered by our own engineer.

02

A structured, defensible report

A clear, logical account that stands up to regulatory scrutiny.

03

An integrated view

Your safety case linked to your fire risk assessments, fire strategy and asset records rather than sitting in isolation.

04

Practical next steps

Recommendations that are realistic, proportionate and prioritised.

Need building safety case reports for a project?

Send us the drawings and we will tell you what the project needs the same day.

Talk to an engineer

Common questions

Building safety case reports: your questions, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Occupied higher-risk buildings, meaning those at least 18 metres tall or with at least seven storeys, containing at least two residential units, in England. Care homes, hospitals, hotels, secure residential institutions and military barracks are excluded from this in-occupation regime.

Building safety case reports by sector

All sectors

Guides

Guides on this topic.

Start your building safety case reports

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.