Does Approved Document B apply to data centres?
Part B of the Building Regulations applies to building work on a data centre as it does to any other building. In England the relevant guidance is Approved Document B Volume 2 (opens in a new tab). It does not mention data centres, computer rooms or servers anywhere in its text. The designer works from the general provisions for plant, compartments, escape and fire service access and applies them to data halls, switch rooms and generator rooms.
The gap matters most at the first step. Approved Document B sorts buildings into purpose groups that represent different levels of hazard. Compartment sizes, travel distances and fire resistance all follow from the purpose group. No official source assigns a data centre to one. The designer has to decide which purpose group applies and justify that choice in the fire strategy. Our fire engineering service prepares that justification and the strategy built on it.
Table 0.1 offers three groups a designer could argue for. None of them names a data centre.
- Office (purpose group 3), which includes "communications (including postal, telegraph and radio communications)".
- Industrial (purpose group 6), which includes "generating power".
- Storage and other non-residential (purpose group 7(a)), which covers the storage or deposit of goods or materials and "any building not within purpose groups 1 to 6".
Paragraph 0.20 says a purpose group can apply to a whole building or to a compartment within it and should relate to the main use of the building or compartment. A data centre with an office wing, a data hall and a generator room may justify a different answer for each part. Paragraph 0.22 deals with the borderline case: "Where there is doubt as to which purpose group is appropriate, the more onerous guidance should be applied."
The introduction to the Approved Document also warns that its guidance may not be appropriate where a case "is unusual in terms of its design, setting, use, scale or technology". Paragraph 0.18 says fire safety engineering "may be the only practical way" to achieve a satisfactory standard of fire safety in some complex buildings. Our guide to fire engineered solutions explains how that route works.
How the purpose group changes compartments, escape and fire resistance
The table compares the three candidate groups using Table 8.1 of Approved Document B Volume 2 for compartment size and Table 2.1 for travel distance.
| Purpose group | Largest compartment without sprinklers | Largest compartment with sprinklers | Travel distance in one direction and in more than one direction |
|---|---|---|---|
| Office (3) | No limit | No limit | 18 metres and 45 metres |
| Industrial (6) | Single storey: no limit. Multi-storey: 7,000 square metres (2,000 square metres above 18 metres) | Single storey: no limit. Multi-storey: 14,000 square metres (4,000 square metres above 18 metres) | 25 metres and 45 metres at normal hazard. 12 metres and 25 metres at higher hazard |
| Storage and other non-residential (7(a)) | Single storey: 20,000 square metres and 18 metres high. Multi-storey: 20,000 cubic metres (4,000 cubic metres above 18 metres) | Single storey: no limit. Multi-storey: 40,000 cubic metres (8,000 cubic metres above 18 metres) | 25 metres and 45 metres at normal hazard. 12 metres and 25 metres at higher hazard |
Table 8.1 recommends that where the limits for a building without sprinklers are exceeded, "a sprinkler system in accordance with Appendix E should be provided". Paragraph 8.14 says purpose groups 3 to 7(a) "require sprinklers where there is a top storey above 30m". For a multi-storey data hall the choice between office and storage can therefore decide whether sprinklers are needed at all.
In Table B2 an office without sprinklers whose top floor is up to 5 metres above ground needs 30 minutes. An industrial or storage building of the same height without sprinklers needs 60 minutes. Table 2.1 also limits travel within a plant room to 9 metres in one direction and 35 metres in more than one direction.
Switch rooms, generators and battery rooms
Much of the fire risk in a data centre sits in its electrical and standby plant. Approved Document B Volume 2 deals with this through places of special fire hazard. Appendix A describes one as a room such as an oil-filled transformer room, a switch gear room, a boiler room, a storage space for fuel or other highly flammable substances or a room that houses a fixed internal combustion engine. A standby diesel generator room is a room of the last kind.
Paragraph 8.12 says every place of special fire hazard "should be enclosed with fire resisting construction". Table 2.1 limits travel inside one to 9 metres in one direction and 18 metres in more than one direction. Paragraph 3.35 says a protected lobby should be provided between an escape stair and a place of special fire hazard. Where these rooms are in a basement, paragraph 18.7 says separate smoke outlets should be provided from them.
Table 5.1 lists rooms that need escape lighting in any purpose group. Three of them are relevant to data centres.
- Electricity and generator rooms.
- The switch room or battery room for the emergency lighting system.
- Emergency control rooms.
For office, industrial, storage and other non-residential buildings the same table adds underground or windowless accommodation and open-plan areas of more than 60 square metres. A windowless data hall is likely to fall within that wording.
Battery rooms for uninterruptible power supplies are harder. The Appendix A list does not name them, although it is introduced with the words "such as". As at 23rd November 2026, GOV.UK, HSE and the National Fire Chiefs Council (NFCC) publish no guidance dedicated to lithium-ion battery rooms inside buildings. The NFCC's grid scale battery storage guidance (opens in a new tab) covers open air systems of 1 MWh or more using lithium batteries and does not deal with indoor rooms. How a battery room is separated, detected and ventilated is a design decision the strategy has to set out and justify.
The NFCC's position statement on fire risks in energy technologies (opens in a new tab) asks government to make sure the Approved Documents and their equivalents in the devolved administrations protect against the fire safety risks of energy technology in buildings. That is a recommendation, not a rule. Our guide to battery energy storage fire safety covers outdoor battery sites.
Detection, raised floors and building services
Data halls are large rooms with few people in them for much of the day. Paragraph 1.5 of Approved Document B Volume 2 says automatic fire detection and alarm should be provided in non-residential occupancies "where a fire could break out in an unoccupied part of the premises". Paragraph 1.6 adds that automatic detection will also be necessary where fire protection systems, such as pressure differential systems or door releases, need to operate automatically.
Raised floors are common in data halls. Appendix A defines a platform floor, also called an access or raised floor, as a floor supported by a structural floor with a cavity between the two to house services. Paragraph 7.3 lists a platform floor among the items excluded from the definition of an element of structure. The cavity carries cables and often air. It needs attention in the compartmentation design.
Paragraph 8.17 says that where services could provide a source of ignition, "the risk of fire developing and spreading into adjacent compartments should be controlled". Paragraph 10.10 says plant rooms should have separate and independent extraction systems and that extracted air should not be recirculated. Paragraph 10.11 says ventilation and air-conditioning systems should be compatible with smoke control systems under fire conditions. In a data centre the cause and effect between cooling, smoke control and any suppression system is best settled early in design.
Paragraph 8.11 sets out where compartment walls and floors are needed in purpose groups 3 to 7. They include every wall needed to meet Table 8.1 and every floor where the top storey is more than 30 metres above ground. Our guide to compartmentation and fire stopping covers how compartment lines are built.
What official sources say about suppression
Approved Document B Volume 2 deals with one kind of suppression. Appendix E says sprinklers, where needed, "should be provided throughout the building or separated part, unless acting as a compensatory feature to address a specific risk". For non-residential buildings they should meet BS EN 12845 with the additional reliability measures in its Annex F. A Part B sprinkler system is "to be regarded as a life safety system". The Approved Document does not mention gaseous or water mist systems as alternatives.
The clearest official account of gaseous systems is Defra's December 2022 assessment of the F gas regulation in Great Britain (opens in a new tab). It says fire protection systems using F gases are a small part of the overall market. They are mainly used where water-based protection could damage the contents of a building, with computer centres and art museums given as examples.
The report records that fire protection equipment containing HFC-23 could not be placed on the market from 1st January 2016. After that ban the commonly used HFCs were HFC-227ea and HFC-125. It also says the HFC phasedown "has effectively phased out the use of HFCs in this industry, particularly since 2018". It names the alternatives.
- Fluoroketones such as FK-5-1-12, used as in-kind solutions.
- Inert gas systems, which reduce oxygen levels within safe limits and often use mixtures of argon and nitrogen.
- Water-based systems, which the report calls a viable alternative while noting that gas systems are often preferred where water damage is a concern.
The Environment Agency and Defra guidance on F gas qualifications (opens in a new tab), last updated on 3rd March 2026, says that to work on a fire protection system containing F gas equivalent to 3kg or more you must have a Fire Industry Association F gas certificate for individuals or an equivalent qualification that an EU member state recognises. Technicians need their own qualifications even if they work for someone else.
As at 23rd November 2026, no GOV.UK, HSE or NFCC guidance on the design of gaseous or water mist suppression in data centres is published. The draft National Policy Statement for Data Centres records that HSE "does not provide specific guidance on safety for data centres".
Paragraph 0.7 explains why the distinction matters. The Building Regulations are intended to ensure a reasonable standard of life safety in a fire. Protecting property often requires additional measures and insurers usually set higher standards. A data centre strategy should say what each suppression system is for and whether any life safety provision depends on it.
What critical national infrastructure status means
On 12th September 2024 the government announced in a press release (opens in a new tab) that it had classed UK data centres as Critical National Infrastructure. The release says the status brings a dedicated team of senior government officials to monitor and anticipate potential threats, prioritised access to security agencies including the National Cyber Security Centre and coordinated access to emergency services should an incident occur. It sets out no Building Regulations or fire safety requirements. The fire strategy is still tested against Part B in the usual way.
Can a data centre be a nationally significant infrastructure project?
Since 8th January 2026 a data centre can be brought into the nationally significant infrastructure project (NSIP) regime. The Infrastructure Planning (Business or Commercial Projects) (Amendment) Regulations 2026 (opens in a new tab) (SI 2026/13), made on 7th January 2026, added data centres to the Schedule to the Infrastructure Planning (Business or Commercial Projects) Regulations 2013. The explanatory note says such a project can be authorised under that regime if it meets the other requirements of section 35 of the Planning Act 2008 and the Secretary of State gives a direction. The Secretary of State can only give one if they think the project is of national significance.
Section 35 allows a direction only for development that will be wholly in England or the waters adjacent to England. Where a business or commercial project is wholly or partly in Greater London, a direction also needs the consent of the Mayor of London.
The route is optional. The draft National Policy Statement for Data Centres (opens in a new tab) says the NSIP framework "will offer an alternative to the existing local authority-led process". It says projects that operate at least 100 MW of rated IT load capacity are likely to be considered nationally significant and calls this an indicative minimum. Rated IT load capacity means the maximum electrical power available for the IT equipment housed in the data centre.
The draft was published on 28th October 2026 and applies to England. Its consultation closes at 11:59pm on 8th January 2027. The threshold and the safety points below are draft policy only. The draft says an NSIP application should cover the following.
- Safety of construction and operation should be key considerations included in the application.
- Applicants should consult the Health and Safety Executive and any relevant local authorities on matters relating to safety.
- The Secretary of State must be satisfied that a safety assessment has been conducted and meets the regulatory requirements, with no additional unmitigated safety concerns.
- The EIA Regulations require the implications of major accidents or disasters to be considered.
Schedule 1 to the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 (opens in a new tab) lists the relevant fire and rescue authority against all applications. The Planning and Infrastructure Act 2025 removed the statutory requirement to consult before applying from 24th July 2026. Check how that listing applies to a current application before relying on it.
Planning applications and fire statements
A data centre that is not directed into the NSIP regime goes through an ordinary planning application. In England the Gateway 1 fire statement under the Town and Country Planning (Development Management Procedure and Section 62A Applications) (England) (Amendment) Order 2021 (opens in a new tab) applies only to relevant buildings. Those are buildings of 18 metres or 7 storeys that contain two or more dwellings or educational accommodation. A data centre with neither is outside it.
In London, Policy D12(B) of the London Plan 2021 (opens in a new tab) says all major development proposals should be submitted with a Fire Statement. Major non-residential development is generally floor space of 1,000 square metres or more or a site of 1 hectare or more. A data centre of that size in Greater London should be submitted with one. Our guide to London Plan Policy D12 explains what it contains.
The National Planning Policy Framework (opens in a new tab), published on 17th August 2026 and last updated on 29th September 2026, supports data centres in England. Policy E1 says development plans should allocate sites including, where a need exists or is anticipated, provision for data centres and associated generating capacity.
In Wales, planning authorities must consult the fire and rescue authority on applications validated on or after 25th April 2022 for listed types of development. The Welsh Government guidance (opens in a new tab) says these include buildings creating 1,000 square metres or more of floor space and sites of 1 hectare or more. The draft National Policy Statement may be a material consideration for decisions in Scotland and Wales. Our guide to whether a planning application needs a fire statement covers the tests in each nation.
Data centres in use and in Wales and Scotland
Once the building is occupied the Regulatory Reform (Fire Safety) Order 2005 (opens in a new tab) applies in England and Wales. Article 9(1) says the responsible person "must make a suitable and sufficient assessment of the risks". The fire strategy gives that assessment its starting point. Our guide to fire strategies and fire risk assessments explains how the two documents work together.
Wales has its own Approved Document B (opens in a new tab). The compartment limits in Table 12 of its Volume 2 for office, industrial and storage buildings match the English Table 8.1 figures given above. Scotland uses the non-domestic Technical Handbook (opens in a new tab) (April 2026), which contains no provisions specific to data centres or battery storage. Our guide to fire strategy in Scotland covers the building warrant process.
A data centre strategy works best when it keeps life safety and asset protection clearly apart. Our fire engineering service prepares data centre strategies on that basis across the UK.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Approved Document B: Fire safety, Volume 2 (England) (official source, opens in a new tab)
- Data centres to be given massive boost and protections from cyber criminals and IT blackouts (GOV.UK, 12th September 2024) (official source, opens in a new tab)
- The Infrastructure Planning (Business or Commercial Projects) (Amendment) Regulations 2026 (SI 2026/13) (official source, opens in a new tab)
- Draft National Policy Statement for Data Centres: consultation (official source, opens in a new tab)
- Draft National Policy Statement for Data Centres (PDF) (official source, opens in a new tab)
- F gas regulation in Great Britain: assessment report (Defra, December 2022) (official source, opens in a new tab)
- Qualifications required to work on equipment containing F gas (GOV.UK) (official source, opens in a new tab)
- NFCC Position Statement: Fire Risks in Energy Technologies (official source, opens in a new tab)
- The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, Schedule 1 (official source, opens in a new tab)
- National Planning Policy Framework (official source, opens in a new tab)
- Regulatory Reform (Fire Safety) Order 2005, article 9 (official source, opens in a new tab)