Listed buildings, mills, churches and adaptive reuse
Heritage buildings were never designed to the guidance and often cannot be altered to meet it. The strategy has to achieve the same level of safety through engineering and management, in a way the conservation officer and the approver can both accept.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- BS 7974 engineered approach, Approved Document B, BS 9999 and BS 9991
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
What makes this sector different
What a fire strategy for heritage buildings has to answer.
Fabric that cannot change
Timber stairs, open wells and historic doors that cannot be replaced or enclosed.
Change of use
A mill becoming flats or a church becoming a venue changes the risk entirely.
Two approvers
Building Control and the conservation officer with different priorities and the same building.
Unknown construction
Hidden voids, altered structure and no drawings.
Evacuation strategy
How evacuation works in a heritage building
The evacuation strategy for a heritage building starts from what cannot be changed. A single open timber staircase, long corridors without doors or a great hall rising through three floors would not be designed today. The strategy accepts them as fixed and works out what else has to be true for people to get out safely.
The usual answer is earlier warning and slower fire growth. Automatic detection throughout gives people more time. Sprinklers or water mist hold the fire back and can be installed with little damage to historic fabric. Limits on occupancy and on how rooms are used close the remaining gap. Each measure is chosen to be reversible where possible, which matters to the conservation officer.
Our approach
How we write a fire strategy for heritage buildings.
This is where in-house fire engineering earns its place. We survey the building, establish what it can and cannot do and build an engineered case for the alternatives, from enhanced detection and suppression to management controls, with modelling where the geometry needs it. We present it to both approvers in language each can use.
Typical deliverables
- Fire strategy report with engineered justification
- Fire strategy plans from survey
- Conservation officer and Building Control liaison
- Management strategy for the residual risks
Standards and guidance
Fire safety guidance for heritage buildings
- BS 7974 engineered approach
- The framework for a fire engineered design. It lets the strategy show equivalent safety by analysis where the guidance cannot be followed.
- Approved Document B (official source, opens in a new tab)
- Accepts that some variation of its provisions may be appropriate for historic buildings and recommends taking advice from conservation officers.
- BS 9999 and BS 9991
- Used as the benchmark the engineered alternative is compared against.
- Historic England fire safety guidance
- Advice on fire safety in historic buildings, with an emphasis on minimum intervention and reversible measures.
Common questions
Fire strategy questions on heritage buildings, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe functional requirements of Part B always apply. The guidance in Approved Document B is one way to meet them and a listed building often cannot follow it. An engineered strategy shows the requirements are met another way, which is exactly what fire engineering is for.
Guides
Guides for heritage buildings.
What we deliver
Services for heritage buildings.

Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreOther sectors
All sectorsFire strategy for heritage buildings
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply