A material change of use, such as offices converted to flats, brings the Building Regulations 2010 into play. In England and Wales the work must make the building meet requirements B1, B2, B3, B4(2) and B5, with B4(1) on external walls above eleven metres. A fire strategy is the usual way to show how the existing building will meet them.

Last reviewed
Reading time
13 minutes
Related service
Fire Strategy Reports
A large brick mill building with many windows

What counts as a material change of use

A change of use brings the Building Regulations into play even where little new construction is planned. Regulation 3 of the Building Regulations 2010 (opens in a new tab) treats work required by regulation 6 on a material change of use as building work. Under regulation 5 (opens in a new tab), which applies in England and Wales, there is a material change of use where a change in the purposes for which or the circumstances in which a building is used means that afterwards it meets one of these descriptions.

  • It is used as a dwelling, a hotel or boarding house, an institution, a public building or a shop where previously it was not
  • It contains a flat where previously it did not
  • It contains a room for residential purposes where previously it did not
  • It already contains dwellings or rooms for residential purposes and the number of them changes
  • It is no longer a building described in classes 1 to 6 of Schedule 2 where previously it was
  • It is a building described in regulation 7(4)(a) where previously it was not

The definitions in regulation 2 (opens in a new tab) matter. A room for residential purposes is a room or suite used to live and sleep that is not a dwelling-house or a flat, such as a room in a hostel, hotel, boarding house, hall of residence or residential home. Hospital patient accommodation is excluded.

Where a house is to become shared accommodation, confirm early with the building control body how the change will be classed, since the answer sets which requirements apply. Our fire strategy reports service can help settle that question at the outset.

Which Part B requirements apply

Regulation 6 (opens in a new tab) sets the requirements the converted building must meet. On a material change of use of the whole building in England, such work as is necessary must be carried out to make the building comply with the listed requirements of Schedule 1. For fire safety that covers every Part B requirement. Only B4(1) on external walls depends on height.

Fire and structural requirements on a material change of use in England
RequirementWhen it applies
B1 Means of warning and escapeIn all cases
B2 Internal fire spread (linings)In all cases
B3 Internal fire spread (structure)In all cases
B4(2) External fire spread (roofs)In all cases
B5 Access and facilities for the fire serviceIn all cases
B4(1) External fire spread (walls)Where the building is over eleven metres in height. If only part changes use, the whole building must comply
A1 to A3 StructureWhere the change is one in regulation 5(c) to (f), meaning the building becomes a hotel or boarding house, an institution or a public building or leaves classes 1 to 6 of Schedule 2
External wall materials under regulation 6(3)Where the building becomes a relevant building under regulation 7(4). External walls and specified attachments may then only contain materials of class A2-s1, d0 or A1, other than the items exempted by regulation 7(3)

Where only part of a building changes use, regulation 6(2) requires that part to meet the requirements that apply in all cases. The Manual to the Building Regulations (opens in a new tab), a code of practice for England, warns that the change may still adversely affect other parts of the building, for example in relation to fire safety. A new flat over a shop, for instance, may share a structure or an escape route with the shop below.

The eleven metre figure for B4(1) has applied in England since 1st December 2022 and in Wales since 20th December 2025. The July 2020 Manual predates the England change. A relevant building under regulation 7(4) (opens in a new tab) in England has a storey at least 18 metres above ground level and contains dwellings, an institution or a room for residential purposes. Our guide to the combustible materials ban covers the exemptions.

What Approved Document B says about conversions

Approved Document B Volume 1 (opens in a new tab) has specific guidance for converting a house or other building into flats. It says the existing construction should be reviewed and warns that retained timber floors may make it difficult to meet the fire resistance provisions. In a converted building of up to three storeys, REI 30 fire resistance for elements of structure could be accepted if the means of escape conform to Section 3. With four or more storeys, the full standard in Appendix B is necessary.

Where a change of use makes a building a relevant building, Approved Document B says the external walls and specified attachments must be investigated and, where necessary, brought up to the required classes. For buildings of special architectural or historic interest, where its provisions might prove too restrictive, it says some variation may be appropriate after assessing the hazard and risk in the particular case. Our guide to fire upgrades in listed buildings covers that route.

It also warns that guidance written for assessing existing buildings is often less onerous and unlikely to be appropriate for building work the regulations control. A conversion is such work.

Why a change of use needs a fire strategy

The existing building was designed for different occupants. The fire strategy is where the design team records what the building already has, what the new use needs and how the gap is closed. Our guide to whether you need a fire strategy covers other project types.

It is also the document others will read. In England, regulation 15A (opens in a new tab) requires the relevant authority to consult the enforcing authority under the Fire Safety Order before deciding a full plans application to change the use of a building the Order applies to or will apply to. Regulation 38 then applies to work in connection with a relevant change of use where Part B imposes a requirement. The fire safety information has to reach the Responsible Person by completion, as our guide to Regulation 38 explains.

After a conversion to flats the Fire Safety Order covers the structure, external walls, common parts and flat entrance doors. The Fire Safety (England) Regulations 2022 (opens in a new tab) apply to blocks of flats whether purpose-built or converted from another type of building. The Responsible Person must also review the fire risk assessment when the premises undergo conversions.

Office to residential under permitted development

In England, Class MA of Part 3 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (opens in a new tab) permits a change of use from Class E (commercial, business and service) to Class C3 (dwellinghouses), subject to prior approval. The use must have been within the specified classes for at least 2 continuous years before the application. It does not apply to listed buildings, scheduled monuments and certain protected areas. The development must be completed within 3 years of the prior approval date.

Since 1st August 2021 the local planning authority considers the fire safety impacts on the intended occupants where the development meets the fire risk condition. The condition is met where the building will contain two or more dwellinghouses and is 18 metres or more in height or has 7 or more storeys. The application must then include a statement about the fire safety design principles, concepts and standards applied to the development.

The local planning authority must consult the Building Safety Regulator, which the Order has named since 27th January 2026. Planning Practice Guidance (opens in a new tab) paragraph 018, last updated on 20th August 2021, still names the Health and Safety Executive. The Order is the current law. The Planning Portal's Planning Gateway One pages (opens in a new tab) say no fire statement form is needed with a prior approval application but that Class MA applications should include floor plans for each storey changing to residential use.

Permitted development to homes and fire safety in England
RouteWhat it allowsFire safety prior approval
Part 3 Class MAClass E commercial, business and service uses to Class C3 dwellinghousesFire safety impacts on the intended occupants where the building will have two or more homes and is 18 metres or more or 7 or more storeys (from 1st August 2021)
Part 3 Class OOffices to dwellinghousesNo fire safety matter. Applications had to be made on or before 31st July 2021
Part 20 Classes A and AANew dwellinghouses on detached blocks of flats and on detached buildings in commercial or mixed useExternal wall fire safety of the existing building where it is 18 metres or more (from 30th December 2020). Fire safety impacts on occupants where the fire risk condition is met (from 1st August 2021)

Where the external wall matter applies, an application under Part 20 (opens in a new tab) must include a report from a chartered engineer or other competent professional confirming that the external wall construction of the existing building complies with B4(1). The local planning authority must refuse prior approval if the report is missing. Since 21st October 2026 the Order has named the Building Safety Regulator as the Part 20 consultee as well. Class AA is not available where the building's use as homes was granted only under Class MA.

Prior approval deals with planning only. The conversion is still a material change of use under the Building Regulations. For tall residential schemes needing a full planning application, our planning fire statements service prepares the fire statement.

Change of use in a higher-risk building

In England a change of use can bring a building into the higher-risk regime or take it out. The Building Safety Regulator's guidance on building control approval (opens in a new tab) says its approval is needed before building work to an existing building that either makes it a higher-risk building or stops it being one, as well as before most work to an existing higher-risk building. Our guide to what a higher-risk building is explains the 18 metre and 7 storey test.

Where the use of any part of an existing higher-risk building is changing, the application must give the intended use of each storey. Work that changes the number of flats or residential rooms is category A work, which needs a fire and emergency file among other documents. Our guide to keeping a fire strategy up to date sets out the two categories.

A change of use made during a higher-risk building project is a major change under regulation 26 (opens in a new tab) of the Higher-Risk Buildings Procedures Regulations. The Regulator gives changing units from commercial to residential use as an example. Work on the change must not start until a change control application is granted and the Regulator has up to 6 weeks to decide unless an extension is agreed.

Converting to a house in multiple occupation

An HMO is defined in section 254 of the Housing Act 2004 (opens in a new tab), which extends to England and Wales. Under the standard test, living accommodation is an HMO where it is occupied as their only or main residence by people who do not form a single household. At least one of them must pay rent and two or more households must share one or more basic amenities or lack them. The Act also has a self-contained flat test and a converted building test.

Part 2 of the Act requires HMOs of a prescribed description to be licensed by the local housing authority and councils may designate areas for additional licensing. GOV.UK says on its HMO licence page (opens in a new tab) that a licence lasts up to 5 years, that conditions include installing and maintaining smoke alarms and that renting out an unlicensed HMO can lead to an unlimited fine.

Mandatory HMO licensing and definitions by nation
NationRuleThreshold
EnglandLicensing of Houses in Multiple Occupation (Prescribed Description) (England) Order 2018, from 1st October 2018Five or more people in two or more separate households, meeting the standard test, the converted building test or the self-contained flat test (unless a purpose-built flat in a block of three or more)
WalesLicensing of Houses in Multiple Occupation (Prescribed Descriptions) (Wales) Order 2006Three storeys or more, five or more people and two or more single households
ScotlandHousing (Scotland) Act 2006, section 125 (definition of an HMO)Living accommodation occupied by 3 or more people who are not all members of the same family or of one or other of two families, sharing basic amenities

Managers in England have fire duties under regulation 4 of the Management of Houses in Multiple Occupation (England) Regulations 2006 (opens in a new tab). Means of escape must be kept free from obstruction and in good repair and fire fighting equipment and fire alarms must be maintained in good working order. Fire escape notices must be clearly visible unless the HMO has four or fewer occupiers.

The Home Office fire safety guidance collection (opens in a new tab) lists the non-statutory LACORS guide on fire safety in certain types of existing housing, dated August 2008. That guide says it does not apply to properties built or converted to the Building Regulations 1991 or later that still comply, unless they are occupied in a way other than intended. Approved Document B separately warns that guidance written for existing buildings is unlikely to suit building work the regulations control. Our HMO sector page covers the fire work these projects usually involve.

Wales and Scotland

Wales uses the same list of material changes of use in regulation 5. Its own version of regulation 6 applies B1, B2, B3, B4(2) and B5 in all cases and B4(1) to buildings over eleven metres, a figure substituted for Wales on 20th December 2025. The permitted development order described above applies to land in England only. Class MA and its fire safety prior approval therefore do not apply in Wales.

In Scotland a conversion needs a building warrant. Regulation 12 of the Building (Scotland) Regulations 2004 (opens in a new tab) requires a conversion to be carried out so that the converted building meets the applicable requirements of Schedule 6. The conversions listed in Schedule 2 include changes that create dwellings, alter the number of dwellings, change a domestic or residential building to another type or allow public access.

The non-domestic Technical Handbook (opens in a new tab) of April 2026 says conversions must meet standards 2.1, 2.3, 2.5, 2.9, 2.10, 2.11, 2.13, 2.14 and 2.15 in full. Standards 2.2, 2.4, 2.6, 2.7, 2.8 and 2.12 must be met so far as is reasonably practicable and in no case be worse than before the conversion. Our Wales and Scotland pages cover projects in each nation.

Common mistakes on conversions

Official guidance and the legislation point to several mistakes that cost time. Each one below comes from an official source.

  • Treating the change as affecting only the converted part, which the Manual warns against
  • Assuming retained timber floors will achieve the fire resistance needed
  • Leaving out the external wall report on a Part 20 upward extension. The authority must refuse prior approval without it and the Planning Portal says the Regulator will raise a concern if it lacks detail
  • Changing the use of part of a higher-risk building during the work without a granted change control application
  • Relying on out of date figures. The B4(1) threshold is now eleven metres in England and Wales and the prior approval consultee is the Building Safety Regulator

A conversion strategy usually starts with a survey of the structure and its fire resistance, the stairs, the compartment lines and the external walls. It then sets out what the new use needs and the upgrades that close the gap. Where the building has no record of its original design, our retrospective fire strategy work provides that baseline.

For mills, warehouses and historic buildings see our heritage and conversion page. When you have drawings, our fire strategy reports team can quote for the change of use strategy.

Sources

This guide was written from these official sources. Check the current version before relying on any figure.

Common questions

More on this topic.

All fire strategy questions

Work required on a material change of use is building work and the converted building must meet the Part B requirements in regulation 6. No law names a fire strategy as such. It is the usual way to show building control how the existing building will meet those requirements.

Keep reading

Related guides.

Talk to an engineer

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.