What Section 2 is
Section 2 (Fire) is part of Schedule 5 (opens in a new tab) to the Building (Scotland) Regulations 2004, which sets out the mandatory functional standards. The Regulations have been in force since 1st May 2005. Regulation 9 requires building work to meet Schedule 5. Section 2 holds 15 standards, numbered 2.1 to 2.15, each stating what the building must achieve rather than how.
The guidance on meeting the standards is in two Technical Handbooks issued under section 4(2) of the Building (Scotland) Act 2003. They are the Domestic Technical Handbook (opens in a new tab) and the Non-domestic Technical Handbook. Clause 2.0.7 says the guidance indicates one or sometimes more than one means of complying with standards 2.1 to 2.15. It envisages that in the majority of projects meeting the guidance will be the usual means of showing compliance.
The Scottish Government's Grenfell response (opens in a new tab) says Section 2 (Fire) of the domestic handbook is the Scottish equivalent of Approved Document B in England. Under section 169(1) (opens in a new tab) the Building Safety Act 2022 extends to England and Wales only, subject to the provisions that follow it.
Our guide to fire strategy in Scotland covers building warrants, verifiers and the Fire Safety Design Summary. Our fire strategy reports for Scottish buildings work through each of the 15 standards and say where the design follows the guidance.
The fifteen standards at a glance
The standard titles are the same in both April 2026 handbooks. The table paraphrases what each mandatory standard asks for.
| Standard | Title | What it asks for |
|---|---|---|
| 2.1 | Compartmentation | Fire and smoke are inhibited from spreading beyond the compartment of origin until occupants have had time to leave it. Does not apply to domestic buildings |
| 2.2 | Separation | In a building divided into more than one area of different occupation, fire and smoke are inhibited from spreading beyond the area where the fire started |
| 2.3 | Structural protection | The load-bearing capacity of the building continues to function until all occupants have escaped or been assisted to escape |
| 2.4 | Cavities | The spread of fire and smoke within cavities in the structure and fabric is inhibited |
| 2.5 | Internal linings | The development of fire and smoke from the surfaces of walls and ceilings in the area of origin is inhibited |
| 2.6 | Spread to neighbouring buildings | The spread of fire to neighbouring buildings is inhibited |
| 2.7 | Spread on external walls | Having regard to the height, use and position of the building, the spread of fire on its external walls is inhibited |
| 2.8 | Spread from neighbouring buildings | The spread of fire to the building from a fire in a neighbouring building is inhibited, with guidance focused on roof coverings |
| 2.9 | Escape | Occupants, once alerted, have the opportunity to escape before being affected by fire or smoke |
| 2.10 | Escape lighting | Illumination is provided to assist in escape |
| 2.11 | Communication | Occupants are alerted to the outbreak of fire |
| 2.12 | Fire and rescue service access | Every building must be accessible to the fire and rescue service |
| 2.13 | Fire and rescue service water supply | Every building must have a water supply for use by the fire and rescue service |
| 2.14 | Fire and rescue service facilities | Facilities are provided to assist fire-fighting or rescue operations |
| 2.15 | Automatic fire suppression systems | Fire growth is inhibited by an automatic fire suppression system in the buildings listed in the standard |
Standard 2.1 carries a limitation stating that it does not apply to domestic buildings. Flats rely instead on standard 2.2, which in domestic buildings means fire separation between dwellings and between dwellings and any common spaces.
Clause 2.10.0 of the domestic handbook says dedicated escape lighting is not necessary within dwellings. In buildings containing flats and maisonettes the common escape routes should be illuminated.
Both handbooks have annexes on resistance to fire, reaction to fire and vulnerability of roof coverings. These are 2.A to 2.C in the domestic handbook and 2.D to 2.F in the non-domestic handbook, where 2.A to 2.C give additional guidance for residential care buildings, hospitals and enclosed shopping centres.
Domestic or non-domestic handbook?
Clause 2.0.8 of the domestic handbook covers multi-occupancy dwellings for not more than six individuals. Larger shared residential buildings, including traditional halls of residence, fall under the Non-domestic Technical Handbook (opens in a new tab). Clause 2.0.3 says mixed-use buildings should refer to both handbooks.
Clause 2.0.6 of the domestic handbook says a flat or maisonette entered only from the open air at ground level, with no storey at a height of more than 4.5 metres, should be regarded as a house. The exception is the guidance to standard 2.15. For sprinklers such a flat is still treated as a flat.
Clause 2.0.4 says height should be measured from the fire and rescue service access level and not necessarily the lowest ground level. Appendix A of the domestic handbook defines a high rise domestic building as a domestic building with any storey at a height of more than 18 metres above the ground.
Clause 2.0.3 lists buildings for which the guidance may not be appropriate and the alternative approach in clause 2.0.7 should be used. The domestic list is below.
- A dwelling with a storey over 200 square metres.
- A house with a storey at a height of more than 18 metres.
- A basement more than 4.5 metres deep.
- A communal room over 60 square metres.
- Catwalks, openwork floors or escalators.
- Places of special fire risk.
- Escape over a flat roof or access deck.
- A domestic building with a storey at a height of more than 60 metres.
The non-domestic list is shorter. It covers buildings with a storey at a height of more than 60 metres, enclosed shopping centres with malls on three or more storeys and air supported structures.
What changed on 6th April 2026
The Building (Scotland) Amendment Regulations 2025 (opens in a new tab), SSI 2025/312, were made on 30th October 2025 and came into force on 6th April 2026. The April 2026 handbooks, Version 1.0 dated 9th March 2026, were issued in support of the revision of Regulation 8 and Standard 2.15.
The summary of changes (opens in a new tab) says the changes relate to Simon and Richard's Law, which mandates automatic fire suppression in traditionally constructed buildings converted to hotel use. It links them to the 2024 to 2025 consultation on the Cameron House Hotel recommendations.
Two regulatory changes matter most for fire design. Regulation 8 now treats a hotel, guest house, boarding house or hostel with a storey at a height of 11 metres or more as a relevant building for the cladding ban. It also adds exceptions for solar shading device components and the balcony floor layer. Standard 2.15 gained limb (i), covering a traditionally constructed residential building with 15 or more rooms used for sleeping accommodation.
Clause 2.0.5 of the domestic handbook lists these guidance changes.
- Clause 2.4.0 includes additional guidance when converting existing older buildings.
- Clause 2.4.3 includes additional guidance on fire resisting ceilings as an alternative to cavity barriers.
- Clause 2.7.1 clarifies the guidance on sheathing and backing boards.
- New clause 2.14.10 covers premises information plates.
- Annex 2.B amends the list of exemptions that form part of an external wall cladding system.
The non-domestic handbook makes similar changes, with fire resisting ceilings at clause 2.4.5 and the exemptions in Annex 2.E. It also changes clauses 2.0.7 on hotel conversions, 2.9.7 on exits and 2.10.3 on low level way finding. New clause 2.15.7 covers Simon and Richard's Law and the former clauses 2.15.7 to 2.15.9 become 2.15.8 to 2.15.10.
For work that needs a warrant, the date the application is submitted decides which rules apply. For work that needs no warrant, regulation 3 of SSI 2025/312 says the changes do not apply to work completed before 6th April 2026. Nor do they apply to work contracted before that date and completed on or before 6th October 2026.
The summary of changes calls the March 2026 documents interim. Check which handbook was in force on the date your warrant application was submitted before relying on any clause number given here.
Sprinklers under standard 2.15
The Building (Scotland) Amendment Regulations 2020 (opens in a new tab), SSI 2020/275, came into force on 1st March 2021. They extended standard 2.15 to buildings containing flats or maisonettes, social housing dwellings and shared multi-occupancy residential buildings. There is no height threshold.
The limitation now says standard 2.15 applies only to a building in one of these categories. Limb (c) is blank because its text was deleted without changing the letters of the categories that follow.
- An enclosed shopping centre.
- A residential care building.
- A building forming the whole or part of a sheltered housing complex.
- A school building, other than a building forming part of an existing school or an extension to a school building where it is not reasonably practicable to install an automatic fire suppression system in that building or extension.
- A building containing a flat or maisonette.
- A social housing dwelling.
- A shared multi-occupancy residential building.
- A traditionally constructed residential building with 15 or more rooms used for sleeping accommodation.
Clause 2.15.3 of the domestic handbook says every flat and maisonette and any ancillary room should be provided with an automatic fire suppression system. A fire sprinkler system in a flat or maisonette should be designed and installed in accordance with BS 9251: 2014. Clause 2.15.4 says every social housing house, flat and maisonette should also have one to the same standard.
The 2020 regulations define a shared multi-occupancy residential building as one occupied as a sole or main residence by more than six individuals who share sanitary facilities or facilities for preparing cooked food. A social housing dwelling is one occupied by virtue of a Scottish secure tenancy.
New non-domestic clause 2.15.7 says traditionally constructed buildings converted to hotels with 15 or more rooms used for sleeping accommodation must have an automatic fire suppression system installed in accordance with clause 2.15.1. Hotels include guest houses, boarding houses, hostels and boutique and apart hotels. Bedrooms, suite living rooms with bed settees and staff bedrooms all count as rooms used for sleeping. A conversion with not more than 14 such rooms does not need suppression.
Traditionally constructed means built by traditional construction methods using permeable components that promote the dissipation of moisture from the building fabric. The clause follows the Cameron House Hotel fire in December 2017 and the short life working group report on the Fatal Accident Inquiry, which clause 2.0.7 says was published on 2nd October 2023.
Our guide to sprinklers in blocks of flats explains the separate 11 metre rule in England.
External walls and the 11 metre ban
The Building (Scotland) Amendment Regulations 2022 (opens in a new tab), SSI 2022/136, were made on 20th April 2022. Parts 1 and 2 came into force on 1st June 2022. Regulation 8(3) now requires the materials in an external wall cladding system or specified attachment of a relevant building to be of European Classification A2-s1, d0 or A1.
A relevant building has a storey at a height of 11 metres or more above the ground and contains one of these uses.
- A dwelling.
- A place of assembly, entertainment or recreation.
- A hospital.
- A residential care building or sheltered housing complex.
- A shared multi-occupancy residential building.
- A hotel, guest house, boarding house or hostel, added from 6th April 2026.
Regulation 8(5) bans highly combustible metal composite material on any building, whatever its height. The ban sits in regulation 8 (opens in a new tab) on durability, workmanship and fitness of materials rather than in Section 2. Annex 2.B of the domestic handbook and Annex 2.E of the non-domestic handbook list the exemptions.
The 2022 regulations also added the words having regard to the height, use and position of the building to standard 2.7. The guidance had moved earlier. The 2019 domestic handbook (opens in a new tab), for warrants from 1st October 2019, called for external wall cladding of European Classification A1 or A2 where a storey is more than 11 metres high.
Our guide to external walls and the combustible materials ban covers the rules in England.
Buildings over 18 metres: stairs, alert systems and plates
Two escape stairs in tall domestic buildings are handbook guidance, not a regulation. The 2019 domestic handbook, for warrants from 1st October 2019, recorded that the option of a single escape stair had been removed for a high rise domestic building. April 2026 clause 2.9.9 says that in order to improve redundancy and escape route options in tall buildings, at least two escape stairs should be provided to every domestic building with a storey height more than 18 metres above the ground level.
Table 2.6 calls for at least two escape routes from flats where the topmost storey is more than 18 metres. A design that departs from clause 2.9.9 goes through the alternative approach in clause 2.0.7, with the fire and rescue service consulted as regulation 11 of the procedure regulations requires for any domestic building over 18 metres.
The 2019 changes also brought in clause 2.14.8 on evacuation alert systems for use by the fire and rescue service. The April 2026 clause says one should be provided in domestic buildings with a storey more than 18 metres above ground level. It adds that an evacuation alert system is not a fire alarm system and should not be confused with one.
New domestic clause 2.14.10 says external premises information plates should be fitted to all new and converted high rise domestic buildings. They should also be fitted to existing high rise domestic buildings where work to common areas or to the envelope is subject to any of the Section 2 standards. Each plate should be yellow and at least 600 mm by 600 mm. It should be fitted above the main entrance no less than 3.5 metres above the adjoining ground.
Departing from the guidance
Clause 2.0.7 in both handbooks sets out the alternative approach. The fire engineer, the building standards verifier and the fire and rescue service should be consulted early in the design process. The handbooks cite BS 7974: 2019 and the International Fire Engineering Guidelines 2005. Not all cases of variance from the guidance will require the appointment of a fire engineer.
The clause warns against fire engineers being commissioned to resolve specific issues where the design does not follow the guidance rather than assessing the building holistically. It also notes the inappropriate use of computational fluid dynamics where the deviations from the handbooks would not merit such an exercise. Where modelling is justified, our smoke control and evacuation modelling service covers it.
Where a full engineered approach is needed, our fire engineering service can help. Our guide to fire engineered solutions explains the method. Clause 2.0.8 recommends consulting those responsible for fire safety legislation on the occupied building before the application for building warrant is finalised.
Common mistakes with Section 2
- Compartmentation under standard 2.1 is applied to dwellings. The standard does not apply to domestic buildings, which rely on separation under standard 2.2.
- Dates are taken from secondary sources. Even the call for evidence gives April 2021 for sprinklers and June 2021 for the cladding ban, where the regulations say 1st March 2021 and 1st June 2022.
- Sprinklers are treated as a high rise rule. Since 1st March 2021 standard 2.15 has applied to every building containing a flat or maisonette, whatever its height.
- The 18 metre stair provision is treated as a regulation. It is handbook guidance in clause 2.9.9.
Section 2 itself is under review. In its Grenfell response the Scottish Government committed to a fundamental review of Section 2 (Fire) of the domestic handbooks, starting with a call for evidence (opens in a new tab). That call ran from 16th January 2026 to 10th April 2026. The current intent is that any regulatory changes will be confirmed and implemented by 2030.
To check a design against Section 2 before the warrant application goes in, see our fire strategy reports service. Our Scotland page covers projects across the country.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Building (Scotland) Regulations 2004, Schedule 5 (official source, opens in a new tab)
- Building (Scotland) Regulations 2004, regulation 8 (official source, opens in a new tab)
- Building Standards Technical Handbook, Domestic, April 2026 (Scottish Government) (official source, opens in a new tab)
- Building Standards Technical Handbook, Non-domestic, April 2026 (Scottish Government) (official source, opens in a new tab)
- Summary of Changes to Building Standards Technical Handbooks for 6th April 2026 (Scottish Government) (official source, opens in a new tab)
- Building (Scotland) Amendment Regulations 2025 (SSI 2025/312) (official source, opens in a new tab)
- Building (Scotland) Amendment Regulations 2020 (SSI 2020/275) (official source, opens in a new tab)
- Building (Scotland) Amendment Regulations 2022 (SSI 2022/136) (official source, opens in a new tab)
- Building Standards Technical Handbook 2019 Domestic, Section 2 Introduction (Scottish Government) (official source, opens in a new tab)
- Scottish Government Response to the Grenfell Tower Inquiry Phase 2 Report (official source, opens in a new tab)
- Building Safety Act 2022, section 169 (official source, opens in a new tab)
- Scottish Building Regulations Fire Safety Review: Call for Evidence (Scottish Government) (official source, opens in a new tab)