Is there an official template or example?
We could find no official template or worked example of a complete safety case report on GOV.UK or the Building Safety Regulator's (BSR) own site at 23rd November 2026. The government's response to its consultation (opens in a new tab), published on 17th August 2023, says "there will be no set template for a safety case report". The report must still meet minimum content requirements. Respondents had asked for a template or an example report to be published.
What does exist is a checklist. BSR's GOV.UK guidance Preparing a safety case report (opens in a new tab), last updated on 6th December 2024, lists what each section should cover. Its safety case toolkit (opens in a new tab) of February 2024 gives worked examples of reasonable steps for specific problems such as fire doors that do not close, damage to structural fire protection and new cracking. Neither is a template. The contents page further down follows the guidance headings and is the closest thing to an example the official sources support.
Copying another building's report is a poor starting point. The consultation response says the content and level of detail are a matter for the PAP and APs, taking into account the hazards, risk assessments, safety arrangements and specifics of each building. BSR says the detail should be proportionate to the risks in the building and to the size and complexity of the AP or PAP organisation. It adds that a one size fits all approach is neither possible nor appropriate.
If you are new to the duties, start with what a building safety case is. If you want the report written from the building's own evidence, our building safety case reports service does that with the fire evidence produced in-house.
What the law says the report must contain
Section 85 (opens in a new tab) of the Building Safety Act 2022 says the report contains each Accountable Person's section 83 risk assessment and a brief description of the steps taken under section 84. Regulation 5 (opens in a new tab) of the Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023 sets the minimum content. A Principal Accountable Person (PAP) must include the following.
- The registration number given to the building on the register.
- A brief description of the building and its wider environment.
- The building safety risk scenarios each AP has identified, the likelihood of each and the likely consequences.
- How the steps taken by each AP demonstrate compliance with section 84.
- A summary of the safety management system, including how safety measures are tested and maintained and how works are managed. That covers the competence of designers and contractors, the quality of materials and risk management while works are in progress.
- The emergency plans, including equipment for the emergency services, information given to them for response planning and what residents are expected to do in an emergency.
The report must be kept in electronic form. All of this applies to England only. The guidance page carries the label "Applies to England" and the 2023 Regulations apply to England only.
The law uses the word brief twice. Neither the Act nor the 2023 Regulations sets a page count or word count. BSR's guidance gives none either. Length should follow from the building. Take a hypothetical single block with one AP and a recent fire strategy. It will need far less than a mixed-use building with several APs and a history of remediation.
Wales is creating its own version. Section 37 of the Building Safety (Wales) Act 2026 (opens in a new tab), which received Royal Assent on 27th April 2026, provides for a safety case report for occupied category 1 buildings of at least 18 metres or at least seven storeys. It goes to the local authority acting as building safety authority. Its content will be set by regulations made by the Welsh Ministers. Section 37 (opens in a new tab) was not in force at Royal Assent and those regulations had not been made by 23rd November 2026.
An example contents page
The contents page below follows the headings in BSR's guidance in its order. Treat it as a skeleton. The detail under each heading has to come from the building itself.
| Part | Section | What BSR's guidance expects |
|---|---|---|
| Front | Cover and document control | Building name, address and registration number, with a date, a version number or both |
| 1 | Basic building information | Build date, height, storeys, floor plans, units, common parts, resident profile, other uses, surroundings, services and gas supply |
| 2 | People responsible for the building | PAP, owner, other APs, Fire Safety Order responsible persons, managing agents and any building safety director, with how APs share information |
| 3 | Construction methods and materials | Materials and where they are used, construction method, load-bearing system, stability, cladding supports, foundations and ground conditions |
| 4 | Structural condition | History of structural problems, surveys and inspections, findings and the status of each recommended action |
| 5 | Building work, refurbishment and remediation | Work since construction that could affect risk, large panel system remediation and work in progress or planned |
| 6 | Fire safety measures | Basis of the fire safety standard, external walls, balconies, compartmentation, fire doors, smoke control, escape, stairs, detection and suppression |
| 7 | Building safety risk assessments | Method, people and competence, scenarios with likelihood and consequences, findings and how each AP is taking all reasonable steps |
| 8 | Emergency plan | Evacuation strategy, communication with residents, facilities and information for the fire and rescue service and review |
| 9 | Safety management systems | Commitment to improve, roles, maintenance and inspection, managing change, monitoring performance and review |
| 10 | Updates and revision history | Date, brief description and reason for each update |
| Appendix | Action or improvement plan | Optional in the guidance but listed in BSR's assessment criteria |
The order is not fixed by law. Following BSR's headings still helps. BSR's assessment criteria cover the same ground in four groups: description and basic information, risk assessment and steps taken, the safety management system and emergency arrangements. The sections below explain what goes under each heading.
The building, the people and the structure
Basic building information covers the name, full postal address, registration number (which begins with HRB), build date, height, number of storeys above ground and floor plans for each type of storey layout, with a map or photo. It also describes the residential units, common parts such as a bin store or underground parking, the resident profile, other non-residential uses and the surrounding area. Services and utilities are listed with their isolation points. Where gas is supplied, the report says whether it reaches individual flats and how the pipes are routed.
Three details in the guidance are easy to overlook. The resident profile, including residents who need help to evacuate, should match the residents' engagement strategy. Each change of use needs to be described with when it happened, how it affects risk, the loading design limits and how overloading is prevented. Where information cannot be found, BSR asks you to explain in the report what you did to try and find it.
The people section names the PAP, the owner if different, any other APs, any responsible persons under the Regulatory Reform (Fire Safety) Order 2005 and any managing agents, with contact details. It also explains how APs share information with each other and with the PAP.
Construction methods and materials sets out what the building is made of and where each material is used. It covers the construction method (for example large panel system), the primary load-bearing method, how stability is provided and secondary systems such as cladding supports. It ends with foundations and local ground conditions such as flood risk and underground tunnels.
Structural condition records any history of structural problems and how each was identified, investigated and remedied. It describes the surveys and inspections carried out, their scope, whether they were visual or invasive, who did them and how their competence was checked. Findings are split into actions completed (with dates), actions not yet completed (with timescales and temporary measures) and actions not taken (with reasons).
Building work, refurbishment and remediation summarises work since original construction that could have affected building safety risks, with the year each was completed. Large panel system buildings should say whether remediation has been done since the Ronan Point collapse in 1968 and how structural condition was established. Work in progress or planned needs its expected completion and the steps managing risk until then.
Fire safety measures
This section starts by showing how you know the building's fire safety standard. The guidance gives three ways to show it. You may know the build standards. You may infer them from the build date, height and type. Or the building may rely on a fire-engineered solution based on design and agreement with a fire engineer.
Where no fire strategy survives, a retrospective fire strategy is one way to establish that baseline. The rest of the section then describes the features that matter for fire spread.
- External wall systems, structural fire protection and the main prevention and protection measures.
- Balconies, with their type, attachment, structural and decorative materials and dimensions.
- A history of fire spread incidents and of enforcement action relevant to fire spread.
- Compartmentation between floors, around firefighting shafts and lift shafts, between basements and ground floor and between flats and bin stores, plant rooms and car parks.
- Compartmentation between corridors and flats, between flats, above false ceilings and at service penetrations, with residential and non-residential separation in mixed-use buildings.
- How maintenance or third-party work affecting compartmentation is managed.
- Fire doors where they are needed, the findings of any fire door survey with the surveyor's competence and evidence that doors and closers are regularly inspected.
- Smoke control by natural ventilation, mechanical smoke ventilation or pressure differential systems.
- Escape routes, with travel distances and any dead ends.
- Stairs, with their number, whether they are for firefighting or escape, which floors and blocks they serve and their width.
- Detection and warning systems.
- Sprinklers or other suppression, with coverage, specification, water supply and power supply.
A good fire section reads like a summary of the fire strategy checked against the building as it stands today. Our fire strategy report example shows how a strategy is laid out. The two documents should agree. Where they do not, it is worth saying which one reflects the building as it stands and why.
The risk assessment section
This section summarises the building safety risk assessments carried out by each AP. It explains the process used (such as HAZID or bow tie) and who was involved, with their competence and specialist expertise. It then sets out the significant findings and the possible risk scenarios each AP identified, with the likelihood and consequences of each.
BSR's guide to assessing safety risks (opens in a new tab) lists scenarios to consider. Fire scenarios run from a fire on a single floor to spread between floors, across several floors or the whole building, along with scenarios involving evacuation, the emergency response and safety systems. Structural scenarios include collapse of a unit or common areas, multiple-floor and whole-building collapse, balconies and walkways, attached components, undermined foundations, aggressive chemical or biological conditions, gas explosion and impact damage. The guide says you should include worst-case scenarios.
The management part explains what each AP is doing and how each is taking all reasonable steps. Recommended actions are tracked as completed with dates, not yet completed with dates and interim controls or not acted on with reasons. If you identify further measures but do not think they are reasonable, BSR asks you to explain why. Without that explanation a reader cannot tell a considered decision from an oversight.
The fire risk assessment feeds this section but does not replace it. BSR's guide says APs should refer to the work done by the responsible person under the Fire Safety Order. Existing control measures include the general fire precautions in place under that Order. BSR's advice to applicants is still not to assume the fire risk assessment is all you need for the section 83 duty.
Emergency plan and safety management system
The emergency plan section describes the evacuation strategy, how it has been communicated to residents, how their needs have been considered and how they should respond. If the current strategy differs from the original design intent, the report should explain each change and the reason for it. It also covers firefighting shafts and any firefighting lifts, risers and fire mains, hydrant locations, fire service vehicle access, site drawings and the information shared with the emergency services. It ends with how the arrangements are reviewed, including regular testing and maintenance checks.
The safety management system section opens with a statement confirming a commitment to continual improvement. An action or improvement plan is optional in the guidance. The section names the main roles, who holds them and how their competence is checked and kept up to date. It gives specific examples and schedules for routine maintenance and inspection, including controls that operate only occasionally, such as those triggered by the fire alarm.
It then explains how change is managed, whether to the building, to how it is managed or to the organisation. It gives at least one example of what is monitored and how, what happens when performance drops and how performance is reported to senior managers. It closes with how and when each system is reviewed and how changes are put in place.
How BSR assesses the report
BSR sees the report in full when it directs the PAP to apply for a building assessment certificate. It can also ask for a copy at any time. At a certificate assessment all three members of the multi-disciplinary team assess it: a BSR Regulatory Lead, a fire safety specialist and a structural assessor. The fire specialist looks at basic information, the risk assessment, compartmentation, prevention and protection measures and management arrangements. The structural assessor looks at basic information, the risk assessment and the arrangements for managing structural integrity.
BSR said on 9th July 2026 (opens in a new tab) that 66 percent of building assessment certificate applications had been refused so far that year. The release does not say how that figure was counted. It said refusals often occur because applications "focus on process compliance rather than effective management of safety". Applications from volunteer-led resident management companies, commonhold and right to manage organisations had often been refused because they did not show adequate arrangements for fire spread and structural failure.
In practice that means describing what is done in the building rather than listing policies. A report that says fire doors are inspected is weaker than one that gives the inspection schedule, the latest findings and what was done about them. BSR's building assessment certificate page (opens in a new tab) sets out its tips.
- Do not rely only on the fire risk assessment for the section 83 duty.
- Do not submit large amounts of extra documents. BSR will ask if it needs more.
- Make the residents' engagement strategy specific to the building.
- Start the report now rather than waiting for a direction.
- Read BSR's safety case toolkit.
- Show an equal understanding of structural and fire safety.
- Demonstrate the measures in place rather than just listing them.
BSR says assessments usually take at least six months. If issues can be fixed promptly, BSR may give the PAP a deadline to fix them. Otherwise it refuses the application with a contravention letter or compliance notice. Under the 2026 to 2027 charging scheme (opens in a new tab) a certificate application costs £312 plus £156 per hour of BSR staff time. BSR can also call in a safety case report for review outside an application at the same hourly rate.
In July 2026 BSR also promised simplified assessment criteria, with initial updated resources expected from September 2026. Those criteria had not been found on GOV.UK by 23rd November 2026. The assessment criteria described above may change when they are published.
Keeping the report up to date
Update the report when improvement work is done or when work affects building safety risks. BSR says you must tell it as soon as possible if an update includes new or increased risks or further measures taken to manage them. It will ask for the date, a brief description and the reason. Regulation 5 requires the notification to give an overview of the main revisions and an explanation of why the revision was made.
Put a date, a version number or both on every issue so the latest version is clear. The report is a prescribed golden thread document under Schedule 1 of the 2024 Regulations (opens in a new tab), alongside information that feeds it such as the fire safety measures, the evacuation strategy, maintenance schedules and inspection reports. BSR's golden thread guidance (opens in a new tab) says this information must be kept digitally as the building's single source of truth.
Residents receive a summary of the safety case report under Schedule 2 (opens in a new tab), alongside a summary of the latest fire risk assessment. Write the full report knowing that a plain summary will be drawn from it. For a new building, the fire safety information handed over at completion is often the first evidence the report draws on. Our guide to Regulation 38 explains that handover.
Our building safety case reports service prepares and updates reports to this structure. Where the fire evidence behind a report needs checking first, a fire strategy review is the usual place to start.
Sources
This guide was written from these official sources. Check the current version before relying on any figure.
- Building Safety Act 2022, section 85 (official source, opens in a new tab)
- Higher-Risk Buildings (Management of Safety Risks etc) (England) Regulations 2023, regulation 5 (official source, opens in a new tab)
- Preparing a Safety Case Report (BSR) (official source, opens in a new tab)
- Consultation on the New Safety Regime for Occupied Higher-Risk Buildings: Government Response (official source, opens in a new tab)
- Safety Case Toolkit: Reasonable Steps and Practical Examples (BSR, February 2024) (official source, opens in a new tab)
- Assessing Safety Risks in High-Rise Residential Buildings: A Detailed Guide (BSR) (official source, opens in a new tab)
- Building Assessment Certificates for Higher-Risk Buildings (BSR campaign site) (official source, opens in a new tab)
- Preparing a Building Assessment Certificate Application (BSR) (official source, opens in a new tab)
- BSR to Introduce More Proportionate and Targeted Approach for Higher-Risk Building Assessments (9th July 2026) (official source, opens in a new tab)
- Building Safety Regulator Charging Scheme 2026 to 2027 (official source, opens in a new tab)
- Keeping Information About a Higher-Risk Building: The Golden Thread (BSR) (official source, opens in a new tab)
- Higher-Risk Buildings (Keeping and Provision of Information etc.) (England) Regulations 2024, Schedule 1 (official source, opens in a new tab)
- Building Safety (Wales) Act 2026 (Welsh Government) (official source, opens in a new tab)
- Building Safety (Wales) Act 2026, section 37 (official source, opens in a new tab)