Progressive horizontal evacuation and vulnerable occupants
In a care home the occupants cannot be relied on to evacuate themselves. The strategy is built around progressive horizontal evacuation, sub compartmentation and the staffing the design assumes will be there at three in the morning.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Approved Document B Volume 2, BS 9999:2017, HTM 05 guidance where adopted
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
What makes this sector different
What a fire strategy for care homes has to answer.
Progressive horizontal evacuation
Moving residents to an adjoining compartment rather than out of the building, which drives the compartmentation and the door provision.
Staffing assumptions
The design relies on staff numbers. The strategy has to state them so the operator can deliver them.
Sprinklers and detection
Suppression and the highest category of detection are common and need to be coordinated with the evacuation strategy.
Retirement living
Extra care and sheltered housing sit between flats and care homes and need a strategy that reflects what the occupants can actually do.
Evacuation strategy
How evacuation works in a care home
Care homes use progressive horizontal evacuation. Each floor is divided into protected areas by fire resisting walls and doors. If a fire starts, staff move the residents nearest to it through a set of fire doors into the adjoining protected area on the same floor. They are safe there for long enough to be moved again or taken out of the building if the fire grows.
The whole approach depends on numbers. The size of each protected area is limited by how many residents the staff on duty can move in the time available, usually at night when staffing is lowest. Approved Document B limits a protected area to ten beds and says every bedroom should be enclosed in fire resisting construction. The strategy records the staffing the design assumes.
Our approach
How we write a fire strategy for care homes.
We write care home strategies that an operator can run and an inspector can test. The evacuation strategy, the compartmentation and the staffing assumptions are stated together so none of them can quietly drift. For extra care and retirement living we set out which parts behave as flats and which need care home provisions.
Typical deliverables
- Fire strategy report and plans
- Progressive horizontal evacuation strategy
- Management and staffing assumptions schedule
- Retrospective strategies for existing homes
Standards and guidance
Fire safety guidance for care homes
- Approved Document B Volume 2 (official source, opens in a new tab)
- Sets the rules for residential care homes. Since 2nd March 2025 it has called for sprinklers in all new care homes.
- BS 9999:2017
- A risk based alternative to Approved Document B, used with care in buildings where occupants need help to escape.
- HTM 05 guidance where adopted
- Healthcare fire safety guidance, sometimes adopted for nursing homes and schemes with a clinical element.
- Fire Safety Order 2005 (official source, opens in a new tab)
- Applies to every care home in use. The fire risk assessment and the emergency plan have to match the evacuation strategy the building was designed for.
Common questions
Fire strategy questions on care homes, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsFor the design and construction gateways, yes, where they meet the 18 metre or seven storey test. They are excluded from the in-occupation regime so no safety case report or registration is required.
Guides
Guides for care homes.
What we deliver
Services for care homes.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Smoke Control and Evacuation Modelling
Fire engineering in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreOther sectors
All sectorsFire strategy for care homes
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply