Annotated plans for every storey, UK wide
Fire strategy plans are the visual record of every key fire safety decision in your building. They translate the written report into annotated floor plans that planners, Building Control, contractors and the Building Safety Regulator can read at a glance.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Written to
- Approved Document B, BS 9999 and BS 9991, Gateway 1 and London Plan D12
- Signed off by
- A Chartered Engineer (CEng)
- Scroll
Overview
What are fire strategy plans?
The strategy, drawn storey by storey
Fire strategy plans show, floor by floor, how the building design achieves the required fire safety standard: where occupants escape, where fire is contained, where sprinklers or smoke control systems operate and how firefighters access and tackle a fire.
They form part of the fire statement for relevant planning applications, part of the building control package under Approved Document B, BS 9999 and BS 9991 and, during construction, a coordination reference for the architect, the structural engineer, the services consultants and the contractor.
After handover they are the drawings the Responsible Person, the fire risk assessor and the fire service rely on, which is why they must reflect the building as built and not just as designed.
Standards and legislation
- Approved Document B
- Plans support the building control submission and record travel distances and compartmentation against the guidance.
- BS 9999 and BS 9991
- Risk profile and residential benchmarks annotated where those codes are adopted.
- Gateway 1 and London Plan D12
- Plans accompany the fire statement for relevant planning applications.
- Regulation 38
- As-built plans are a core part of the fire safety information handed to the Responsible Person.
FS-03 P02
Contents
What fire strategy plans show
The information captured on every set
Means of escape routes
All escape routes highlighted by floor, including protected corridors, lobbies and final exit discharge points.
Travel distances
Maximum travel distances annotated against the Approved Document B, BS 9999 or BS 9991 benchmark that applies.
Compartment boundaries
Compartment and sub compartment lines marked on plan and section, with fire resistance periods.
Protected stairs and lobbies
Protected shafts, firefighting stairs and lobby arrangements annotated with their ventilation strategy.
Suppression and detection
Sprinkler zone boundaries and detection coverage, coordinated with the mechanical and electrical design.
Firefighting access and facilities
Fire appliance access routes, dry and wet riser locations, bridgehead floors and firefighting lift positions.
Formats
Fire strategy plan formats
Drawn to be read, built and kept
- 01Colour coded plans using a consistent legend across every sheet
- 02Issued as PDF for submission and as CAD or model overlays for the design team
- 03A key sheet explaining every symbol, hatch and line type
- 04Section drawings where vertical compartmentation or stair pressurisation matters
- 05Revision controlled so each issue can be traced to a design change
- 06As-built versions for the Regulation 38 handover and the golden thread
Our process
How the work runs.
- 01
Base drawings
We take the architect's current general arrangement drawings and agree the scale and sheet set.
- 02
Markup
We annotate escape, compartmentation, systems and firefighting provisions in line with the written strategy.
- 03
Coordination
We check the plans against the structural and services information so nothing contradicts the design.
- 04
Issue and revise
We issue with the report and re-issue as the design develops, with a clear change record.
What you get
- A complete set of annotated fire strategy plans, every storey plus key sections
- A legend sheet and drawing register
- Native overlays for the design team where required
- As-built plans at handover
- Sheet
- FS-03
- Fee
- Fixed, agreed first
Why us
Engineered in-house, not subcontracted.
Drawn by the engineer
The person who wrote the strategy marks up the plans so the drawing and the report never disagree.
Built for coordination
Issued in the formats the design team actually uses rather than as a static PDF only.
Kept current
Revision control from first issue to as-built so the golden thread stays intact.
UK wide
Any building, anywhere in the UK.
Need fire strategy plans for a project?
Send us the drawings and we will tell you what the project needs the same day.
Common questions
Fire strategy plans: your questions, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsYes. Where a strategy already exists we can produce or update the plans as a standalone deliverable, for example for coordination during construction or to complete a Regulation 38 pack. We will tell you if the existing strategy itself needs revisiting first.
Fire strategy plans by sector
All sectorsGuides
Guides on this topic.
Keep reading
Related services

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Regulation 38 Fire Safety Information
Building Regulations 2010 regulation 38, England and Wales
Read more
Planning Fire Statements and Gateway 1
Gateway 1 and London Plan D12, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreStart your fire strategy plans
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK