All 32 council areas, Loch Lomond and The Trossachs and the Cairngorms
Scotland runs its own building standards system, with building warrants granted by the 32 councils, fire guidance in Section 2 of the Technical Handbooks and sprinklers in every new flat since 1st March 2021. We write fire strategies for Scottish buildings that show the verifier and the Scottish Fire and Rescue Service how a design meets Section 2 (Fire).
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy across Scotland
Building work in Scotland is governed by the Building (Scotland) Act 2003 and the Building (Scotland) Regulations 2004, both in force since 1st May 2005. A building warrant must be granted before work starts. At the end the relevant person submits a completion certificate for the verifier to accept. The 32 councils are the only verifiers, each appointed for its own area until 30th April 2029, with no private building control route. Guidance sits in the Domestic and Non-domestic Technical Handbooks. The Scottish Government describes Section 2 (Fire) of the domestic handbook as the Scottish equivalent of Approved Document B in England. The April 2026 edition applies to warrant applications submitted on or after 6th April 2026. The Scottish Government says no provisions specific to domestic buildings mandate a fire safety strategy. A fire safety design summary has been required with the completion certificate for new non-domestic buildings and conversions to them since October 2013.
The higher-risk building regime of the Building Safety Act 2022 does not extend to Scotland, which therefore has no Building Safety Regulator gateways and no safety case reports. Guidance on a Compliance Plan Approach for high-risk buildings was published on 5th January 2026 instead. It covers major works to residential buildings over 11 metres along with education, community and sport buildings, council public buildings, hospitals and residential care buildings. That approach remains guidance until legislation is amended. Sprinklers have been required in every new building containing a flat or maisonette, whatever its height, since 1st March 2021. Combustible cladding has been banned on relevant buildings of 11 metres or more since 1st June 2022. Highly combustible metal composite material is banned on buildings of any height. Handbook guidance since 1st October 2019 has called for two escape stairs in domestic buildings with a storey more than 18 metres above the ground. SSI 2025/312 came into force on 6th April 2026, bringing hotels, guest houses, boarding houses and hostels into the cladding ban and traditionally constructed residential buildings with 15 or more rooms used for sleeping accommodation into the sprinkler standard.
Planning follows National Planning Framework 4, adopted on 13th February 2023 as part of the statutory development plan alongside the Local Development Plan for each area. NPF4 contains no fire safety policy. Scottish planning applications carry no fire statement. Fire is handled at building warrant stage instead, where the procedure regulations require the verifier to consult the Scottish Fire and Rescue Service on certain buildings. Once a building is occupied, Part 3 of the Fire (Scotland) Act 2005 and the Fire Safety (Scotland) Regulations 2006 apply to non-domestic premises, with the service as the enforcing authority for most of them. The Housing (Cladding Remediation) (Scotland) Act 2024 has been fully in force since 6th January 2025 for flatted buildings of 11 metres or more with external wall cladding built or developed between 1st June 1992 and 1st June 2022. The Building Safety Levy (Scotland) Act 2026 received Royal Assent on 13th May 2026. The Act ties a levy on new residential units to the completion certificate stage, with Revenue Scotland as collector. Its regulation making powers come into force on 1st December 2026, although the charge itself was not yet in force in November 2026.
Who decides
Who approves a fire strategy in Scotland
- Technical Handbooks
- Scottish Government Building Standards Division (official source, opens in a new tab)
- Publishes the Domestic and Non-domestic Technical Handbooks, with the edition for use from 6th April 2026.
- Verifiers
- Building Standards Procedural Handbook (official source, opens in a new tab)
- Version 1.9 confirms the 32 councils as the only verifiers, each for work in its own area.
- Fire and rescue
- Scottish Fire and Rescue Service (official source, opens in a new tab)
- Its Water Planning Department receives building warrant submissions, with a focus on standards 2.12 on access and 2.13 on water supply.
- High-risk buildings
- Compliance Plan Approach (official source, opens in a new tab)
- Scottish Government background to the guidance on verifying high-risk buildings during construction, published on 5th January 2026.
Local issues
What a Scottish fire strategy has to deal with.
Sprinklers at any height
Standard 2.15 has applied to every new building containing a flat or maisonette since 1st March 2021, with no height threshold. Social housing dwellings and shared multi-occupancy residential buildings for more than six people are covered too. The handbook cites BS 9251: 2014 for flats. A low rise block therefore needs a sprinkler design from the outset.
Cladding rules from 11 metres
Cladding on a relevant building with a storey of 11 metres or more must be class A1 or A2-s1, d0. The definition takes in buildings containing a dwelling, places of assembly or entertainment, hospitals, residential care buildings, sheltered housing and shared multi-occupancy residential buildings, with hotels, guest houses, boarding houses and hostels added from 6th April 2026. Putting on or replacing an external wall cladding system needs a building warrant, apart from minor repairs.
Above 18 metres
Clause 2.9.9 of the domestic handbook calls for at least two escape stairs once a storey is more than 18 metres above the ground. An evacuation alert system to BS 8629 is expected at that height as well. Clause 2.14.10, new from 6th April 2026, adds yellow external premises information plates on new, converted and some existing high rise domestic buildings.
Fire engineering through the warrant
Clause 2.0.7 asks for the fire engineer, the verifier and the Scottish Fire and Rescue Service to be consulted early on a fire engineered design, with a qualitative design review for holistic schemes. The verifier must consult the service on non-domestic residential buildings and domestic buildings with a storey over 18 metres. Verifiers take its views into account but are not bound to follow them.
Building types
The building types we see across Scotland
- Fire Strategy for High-Rise Residential Buildings
Domestic blocks with a storey over 18 metres, where the handbook calls for two escape stairs and an evacuation alert system and the verifier must consult the fire service on the warrant
- Fire Strategy for Blocks of Flats and Apartments
New flats of any height, which have needed sprinklers since 1st March 2021
- Fire Strategy for Hotels and Hospitality
Hotels, guest houses and hostels of 11 metres or more within the cladding ban since 6th April 2026, plus traditionally constructed buildings with 15 or more rooms used for sleeping accommodation converted to hotel use, which now fall under the sprinkler standard
- Fire Strategy for Care Homes and Retirement Living
Residential care buildings and sheltered housing within the sprinkler standard, with care buildings also named in the Compliance Plan Approach guidance
Places
Fire strategy across Scotland.
Each of these has its own page, with the council, the plans and the buildings of that place.
What we deliver
Fire strategy services in Scotland.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Scotland, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsThe higher-risk building regime of the Building Safety Act 2022 extends to England and Wales only. In Scotland a building warrant from the council as verifier remains the approval route, with the Compliance Plan Approach applied to high-risk buildings as guidance.
Guides
Guides worth reading first.
Other locations
All locationsFire strategy in Scotland
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply