Skip to content

Clydebank town centre, Queens Quay and Dalmuir

Clydebank is rebuilding the 98-acre former John Brown's shipyard as Queens Quay, beside a Category A Titan crane and with heat drawn from the River Clyde. We write fire strategies for the new flats, care and health buildings at Queens Quay and for the town's older civic buildings.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Clydebank buildings

West Dunbartonshire Council's Planning Committee decided on 15th March 2023 that the council would not adopt Local Development Plan 2. The West Dunbartonshire Local Plan adopted in March 2010 therefore remains the adopted plan alongside NPF4. The Proposed Plan as modified in 2020 is still given significant weight as the council's most up to date spatial strategy.

Queens Quay already has the West College Scotland Clydebank campus, a leisure centre, a health centre, an 84-bed care home and a District Heating Centre. Its first substantial housing, 146 affordable homes in two blocks of six storeys, was completed in 2022. The council expects around 1,000 more homes there in the coming years.

The heat network runs on two 2.65 MW water source heat pumps taking heat from the River Clyde basin, backed by a £6.1 million grant and completed in October 2021. The Golden Jubilee University National Hospital stands on Beardmore Street. The draft SFRS plan for West Dunbartonshire names the Exolum fuel storage facility in Clydebank among the Control of Major Accident Hazards sites it plans for.

Who decides

Who approves a fire strategy in Clydebank

Planning
West Dunbartonshire Council (official source, opens in a new tab)
Weighs Clydebank applications against the 2010 Local Plan and NPF4, with the unadopted LDP2 as a material consideration.
Building standards
West Dunbartonshire Council Building Standards (official source, opens in a new tab)
The verifier for the area, which warns that starting work before warrant approval is an offence under the Building (Scotland) Act 2003.
Fire station
Clydebank Community Fire Station (official source, opens in a new tab)
One of three community stations in West Dunbartonshire named in the draft SFRS plan for 2026 to 2029.
Development plan
West Dunbartonshire development plan (official source, opens in a new tab)
Sets out the March 2023 decision not to adopt LDP2 and the 2010 Local Plan still in force.

Local issues

What a Clydebank fire strategy has to deal with.

01

Flats on a former shipyard

Queens Quay's 146 affordable homes in two six storey blocks were completed in 2022, with around 1,000 more planned. Scotland has required sprinklers in every new building containing a flat since 1st March 2021. Later phases at Queens Quay will need them designed in from the outset.

02

Sleeping risk in the care home

Queens Quay includes an 84-bed care home. Residents who cannot move without help depend on compartmentation and staff-led horizontal evacuation rather than everyone leaving at once.

03

Heat network plant

The Queens Quay heat network runs on two 2.65 MW water source heat pumps. Plant rooms and pipe routes serving connected blocks need fire separation wherever they pass between buildings or compartments.

04

Category B civic buildings

The Municipal Buildings and Public Library on Dumbarton Road and the former fire station tenement on Hall Street are listed Category B. Changing their use means fitting fire separation and escape within listed fabric.

Building types

The building types we see in Clydebank

Common questions

Fire strategy questions in Clydebank, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

West Dunbartonshire Council decided on 15th March 2023 not to adopt Local Development Plan 2. The adopted plan is still the 2010 Local Plan, read with NPF4 and with the Proposed LDP2 as a material consideration.

Guides

Guides worth reading first.

More in Scotland

All locations

Fire strategy in Clydebank

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.