Irvine town centre, the harbourside and Montgomerie Park
Irvine is home to Scotland's first housing Simplified Planning Zone at Montgomerie Park, the £14 million Great Harbour project and the i3 Enterprise Area. We write fire strategies for Irvine's new homes, industrial units, harbour buildings and listed churches.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Irvine buildings
North Ayrshire Council adopted the Montgomerie Park Simplified Planning Zone in December 2019, giving planning consent upfront on a site with capacity for around 950 new homes. The council calls it the first of its kind in Scotland. Any flats built there come under the Scottish rule that has required sprinklers in every new flat since 1st March 2021.
Phase One of the £14 million Great Harbour project, the Coastal Hub with its Sea Monster Park and Pilot House Plaza, was marked complete in September 2026. The Scottish Government put in £9 million and the council £5m, with future phases to be delivered over the following two years. At the i3 Enterprise Area the first phase of i3 Flexible, an 18,000 square feet unit costing £5m, was completed in February 2026 under a £15 million Ayrshire Growth Deal programme.
North Ayrshire sent its LDP3 Evidence Report to Scottish Ministers on 20th January 2026. On 1st July 2026 the Reporter gave notice that it contained sufficient information. On the former Fullarton high flats site, cleared of five tower blocks in late 2023, the council said in April 2026 that work on 43 homes was scheduled to begin in early 2027.
Who decides
Who approves a fire strategy in Irvine
- Planning
- North Ayrshire Council (official source, opens in a new tab)
- Based at Cunninghame House on Friars Croft in Irvine, with LDP2 adopted on 28th November 2019.
- Building standards
- North Ayrshire Council Building Standards (official source, opens in a new tab)
- Issues building warrants as verifier for North Ayrshire and publishes its own fire safety design summary form.
- Fire and rescue
- Scottish Fire and Rescue Service (official source, opens in a new tab)
- Its 2017 local plan for North Ayrshire counts fourteen station locations, three of them wholetime.
- Simplified Planning Zone
- Montgomerie Park SPZ (official source, opens in a new tab)
- The council's page on the zone scheme adopted in December 2019.
Local issues
What an Irvine fire strategy has to deal with.
Consent first, fire design later
The zone scheme gives planning consent at Montgomerie Park before designs are drawn, yet each building still needs a building warrant. With around 950 homes in prospect, a fire approach that works across the house and flat types avoids solving the same escape and separation questions plot by plot.
The council's design summary form
North Ayrshire Building Standards publishes a Fire Safety Design Summary form alongside its warrant guidance. It asks whether evacuation is simultaneous, phased or progressive horizontal, along with inner rooms, suppression, risers, firefighting lifts and any measures that rely on management actions. A fire strategy set out under those headings makes the form simple to complete.
A harbour tower in a new plaza
The Harbour Pilot House of 1906 is a four storey square tower built as a monitoring station, listed Category B as LB35449. It stands within the Great Harbour Coastal Hub, which includes Pilot House Plaza. Any public use of a tower of that kind depends on how its stair is protected and how many people it can take.
Flexible industrial space
i3 Flexible is an 18,000 square feet unit within the i3 Advanced Manufacturing Flexible Space Programme. Flexible space is often let to occupiers not known at design stage. A strategy for space like this sets limits on storage height, process risk and compartment size that later tenants have to stay within.
Building types
The building types we see in Irvine
- Fire Strategy for Blocks of Flats and Apartments
Montgomerie Park and the former Fullarton high flats site
- Fire Strategy for Warehouses and Industrial Units
i3 Flexible in the i3 Enterprise Area
- Fire Strategy for Heritage Buildings and Conversions
Trinity Church by Frederick Thomas Pilkington, the 1859 Court House and the Harbour Pilot House
- Fire Strategy for Hospitals and Healthcare Buildings
Ayrshire Central Hospital and Woodland View, a £55 million mental health hospital with 206 inpatient beds
What we deliver
Fire strategy services in Irvine.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read moreCommon questions
Fire strategy questions in Irvine, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsNorth Ayrshire Council Building Standards, as verifier for the council area. The council's headquarters is in the town at Cunninghame House.
Guides
Guides worth reading first.
More in Scotland
All locationsFire strategy in Irvine
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply