Hamilton town centre, Almada Street and the New Cross
Hamilton is home to South Lanarkshire Council, which works from the Category A listed Lanark County Buildings, a 17 storey tower on Almada Street. We write fire strategies for Hamilton's town centre redevelopment, its listed civic buildings and the new homes the masterplan proposes.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Hamilton buildings
South Lanarkshire Council ringfenced £8m in its 2025/26 budget for the Hamilton Town Centre Masterplan. By August 2025 the council reported that the Regent Shopping Centre had been sold and that the New Cross Shopping Centre was moving into design development, demolition and potential disposal.
The masterplan proposals published in April 2025 include new residential blocks, some commercial ground floor uses and car parking. Quarry Place, Quarry Street and Cadzow Street are to remain the commercial spine. In December 2025 the council reported that Hamilton town centre would be among 14 areas in Scotland to receive up to £20m over 10 years from Pride in Place.
In June 2026 the Scottish Fire and Rescue Service Board approved a proposal to reduce the number of wholetime appliances based at Hamilton from two to one. The second appliance at Hamilton Community Fire Station on Bothwell Road was temporarily withdrawn in September 2023.
Who decides
Who approves a fire strategy in Hamilton
- Planning
- South Lanarkshire Council (official source, opens in a new tab)
- Decides planning applications for the town. The council's headquarters is on Almada Street in Hamilton.
- Building standards
- South Lanarkshire Council Building Standards (official source, opens in a new tab)
- Assesses and approves building warrants, inspects work on site and considers completion certificates as the verifier for the district.
- Fire station
- Hamilton Community Fire Station (official source, opens in a new tab)
- A wholetime station on Bothwell Road. In June 2026 the SFRS Board approved reducing the number of wholetime appliances based at Hamilton from two to one.
- Masterplan
- Hamilton Town Centre Masterplan (official source, opens in a new tab)
- The council's August 2025 progress report on the Regent Centre sale, the New Cross site and Quarry Street.
Local issues
What a Hamilton fire strategy has to deal with.
A listed council tower
Lanark County Buildings is a 17 storey tower of 1959 to 1964, listed Category A under HES reference LB34472. Any upgrade to stairs, alarms or fire separation in a tall occupied office of that age has to be weighed against what the listing protects.
Homes above shop units
The masterplan proposes residential blocks with some commercial ground floor uses. Flats over commercial units need fire separation from the space below and a protected route out that never passes through a shop. Every new building containing a flat in Scotland has needed automatic fire suppression since 1st March 2021.
Clearance beside trading streets
The council reported in August 2025 that a dangerous building notice had been served on the former Vogue Bingo site, with approvals to demolish being progressed. Phased demolition next to occupied buildings means checking at each stage that neighbours keep their escape routes and that appliances can still reach them.
Old public buildings in daily use
Hamilton Sheriff Court of 1834 and the Old Parish Church of 1732, designed by William Adam, are both listed Category A. A court mixes public, staff and secure areas while a church gathers a large congregation in one room. Each needs its own escape and alarm approach.
Building types
The building types we see in Hamilton
- Fire Strategy for Heritage Buildings and Conversions
Lanark County Buildings, the Sheriff Court, the Old Parish Church and Low Parks Museum with its house of 1696
- Fire Strategy for Mixed Use Developments
Residential blocks over commercial ground floors in the town centre masterplan
- Fire Strategy for Retail and Leisure Buildings
The Regent and New Cross shopping centres in the town centre masterplan
- Fire Strategy for Schools and Education Buildings
The University of the West of Scotland Lanarkshire Campus at Hamilton International Technology Park
What we deliver
Fire strategy services in Hamilton.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Engineering
Performance based design, in-house, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreCommon questions
Fire strategy questions in Hamilton, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsSouth Lanarkshire Council is the verifier. Its building standards team assesses warrant applications, inspects during construction and considers completion certificates when work is finished.
Guides
Guides worth reading first.
More in Scotland
All locationsFire strategy in Hamilton
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply