Skip to content

Manchester city centre and the wider city

Tall residential towers now define the Manchester skyline and the mills and warehouses around them are being converted. We write the fire strategies that get both approved.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Manchester buildings

Tall residential towers now define the Manchester city centre skyline. Beyond them, neighbourhoods such as Ancoats, Castlefield and the Northern Quarter hold Victorian mills and warehouses that have been converted to homes and offices.

The two kinds of building need very different strategies. A new tower sits inside the Building Safety Act regime from its planning application onwards. A converted mill has to reconcile cast iron frames, timber floors and open stairs with guidance written for modern buildings. We write both in-house. The strategy then follows the building from the planning fire statement to the handover pack.

Who decides

Who approves a fire strategy in Manchester

Planning
Manchester City Council (official source, opens in a new tab)
Decides planning applications in the city. The fire statement for a relevant tall residential or educational building is reviewed by the Building Safety Regulator at Gateway 1.
Building control
The council or a registered building control approver (official source, opens in a new tab)
Gateway 2 and Gateway 3 for a higher-risk building are decided by the Building Safety Regulator and not by the council.
Fire and rescue
Greater Manchester Fire and Rescue Service (official source, opens in a new tab)
Building control consults the service on buildings the Fire Safety Order will apply to once they are occupied.
Joint plan
Places for Everyone (official source, opens in a new tab)
The joint development plan for nine Greater Manchester districts including Manchester. It has been in force since 21st March 2024.

Local issues

What a Manchester fire strategy has to deal with.

01

Residential towers

The towers that shape the skyline are mostly residential. Any with two or more homes and a height of 18 metres or seven storeys is a higher-risk building. Its strategy has to hold up at each of the three gateways.

02

Mill and warehouse conversions

Cast iron columns, timber floors and open stairs rarely match the guidance. Ancoats and Castlefield are both conservation areas. A mill there is judged against its heritage setting as well as the Building Regulations. We survey the building then engineer a case that keeps its character and still protects the people in it.

03

Mixed use at street level

Flats above bars, restaurants and shops are common in the city centre. The strategy has to separate the uses and decide how they share cores and basements.

04

Car parking below and within

Tower schemes often have enclosed car parking in a basement or a podium. That needs smoke control and a clear firefighting approach.

Building types

The building types we see in Manchester

Where we are

Our address in Manchester

Manchester is where our address is. We still write most strategies from the drawings and survey the building on site where the work needs it.

Our registered address is First Floor, Swan Buildings, 20 Swan Street, Manchester, M4 5JW.

Common questions

Fire strategy questions in Manchester, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

It depends on the building. Manchester City Council is the planning authority and reviews the planning fire statement. Building control is either the council or a registered building control approver. For a higher-risk building the Building Safety Regulator is the building control body instead. Building control consults Greater Manchester Fire and Rescue Service where the Fire Safety Order will apply to the finished building.

Guides

Guides worth reading first.

Other locations

All locations

Fire strategy in Manchester

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.