Skip to content

Falkirk town centre, Callendar Park and Camelon

Falkirk Council appointed architects in July 2026 for a £70m town hall on the cleared Callendar Square site while the £148.7m Falkirk and Grangemouth Growth Deal funds projects across the area. We write fire strategies for Falkirk's venues, its listed landmarks and its canal side projects.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Falkirk buildings

Councillors agreed on 23rd May 2023 to buy Callendar Square and the Antonine Hotel for the new town hall. The building will hold a main auditorium of 550 to 600 seats, a studio theatre, Falkirk Central Library, an advice and support hub, a café and bar, workshops and dance spaces. It is due in 2028 to 2029, subject to planning, procurement and construction.

The Growth Deal was signed on 14th November 2024 at the Rosebank Distillery, whose former buildings beside Lock 11 of the Forth and Clyde Canal are listed Category B. Its projects include a new Canal Centre and workshop in Camelon and a Skills Transition Centre at Forth Valley College in Falkirk.

Falkirk Local Development Plan 2 was adopted on 7th August 2020 and runs to 2040. A reporter found the LDP3 Evidence Report sufficient on 17th January 2025 and the council has started on the Proposed Plan. The council area has nine conservation areas, including Falkirk Town Centre and Arnothill and Dollar Park.

Who decides

Who approves a fire strategy in Falkirk

Planning
Falkirk Council Development Management (official source, opens in a new tab)
Decides planning applications and looks after the council area's nine conservation areas.
Building standards
Falkirk Council Building Standards (official source, opens in a new tab)
Takes warrant applications through the eBuilding Standards portal and verifies work across the council area.
Fire station
Falkirk Community Fire Station (official source, opens in a new tab)
Crewed on a wholetime and on call basis at Westfield.
Town hall
New Falkirk Town Hall (official source, opens in a new tab)
The council's announcement of the architects for the £70m venue in July 2026.

Local issues

What a Falkirk fire strategy has to deal with.

01

A theatre, library and hub under one roof

The new town hall will combine a main auditorium, a studio theatre, the central library and an advice hub. The council expects around 300,000 visitors a year. Several assembly uses in one building need their escape capacity, smoke control and fire separation planned together from the first design stage.

02

A Category A steeple

Falkirk Town Steeple was built by David Hamilton in 1813 to 1814 as a classical tower 140 feet high and is listed Category A. Works inside a tower of that height raise questions of escape distance and fire service reach that a strategy has to answer.

03

A long country house frontage

Callendar House in Callendar Park is listed Category A. HES describes a Francois Ier remodelling of an earlier house with a total frontage of 300 feet. Long internal routes in a house of that scale mean travel distances and alarm zoning need checking for any public use.

04

Surplus civic buildings for sale

The council plans to help fund the town hall by selling surplus sites, including the Municipal Buildings. A buyer converting a former council office would need a fresh fire strategy for the new use.

Building types

The building types we see in Falkirk

Common questions

Fire strategy questions in Falkirk, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The council says it is due in 2028 to 2029, subject to planning, procurement and construction. Stallan Brand was appointed as architect in July 2026.

Guides

Guides worth reading first.

More in Scotland

All locations

Fire strategy in Falkirk

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.