Arbroath town centre, Abbey to Harbour and Keptie Pond
Arbroath is one of three Scottish communities receiving £20 million over ten years through the Plan for Neighbourhoods, while a regeneration grant of £2,138,985 is going to its courthouse project. We write fire strategies for Arbroath's listed works, its theatre and High Street buildings and the community projects reusing older property.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Arbroath buildings
The £20 million comes as endowment-style funding and support for the Arbroath Neighbourhood Plan. A Neighbourhood Board will use local input to prepare a ten-year Regeneration Plan and a three-year Investment Plan, with board meetings listed through to 26th October 2026.
The Scottish Government announced its 2025 to 2026 Regeneration Capital Grant Fund awards on 22nd May 2025, including £2,138,985 to Angus Council and the Arbroath Courthouse Community Trust. Three of the 19 conservation areas in Angus are in Arbroath: Abbey to Harbour, Keptie Pond and West Port.
The Angus Local Development Plan was adopted in September 2016. The council is consulting on draft chapters of its Evidence Report and says a new plan is likely to be adopted in 2031. NHS Tayside runs Arbroath Infirmary at the south end of the town, with a minor injuries unit open from 8am to 8pm every day and a renal dialysis unit.
Who decides
Who approves a fire strategy in Arbroath
- Planning
- Angus Council (official source, opens in a new tab)
- Still working to the 2016 plan and consulting on draft Evidence Report chapters for its successor.
- Building standards
- Angus Council Building Standards (official source, opens in a new tab)
- Grants warrants across Angus as verifier, working from Angus House at Orchardbank in Forfar.
- Fire station
- Arbroath Community Fire Station (official source, opens in a new tab)
- Crews at Ponderlaw Street are listed as wholetime and on call. Carnoustie and Montrose are on call stations.
- Regeneration
- Arbroath Plan for Neighbourhoods (official source, opens in a new tab)
- Angus Council's page on the ten-year programme and its Neighbourhood Board.
Local issues
What an Arbroath fire strategy has to deal with.
A Category A works building
Baltic Works on Dens Road, formerly Arbroath Warehouse Limited Bond Number 1, is listed Category A (HES reference LB21141). Reusing a large historic industrial building means setting compartment sizes and travel distances on open floors without removing the structure that earned the listing.
A High Street theatre
The Webster Memorial Theatre at 64 High Street was listed Category C on 18th December 2009 (LB51409). A theatre needs separation between stage and auditorium and exits sized for a full house.
Older buildings in community hands
The courthouse grant and the community centre in the former Drill Hall on Marketgate, listed Category C (LB52386), both bring community uses into older buildings. A new mix of uses changes how many people are inside and how they get out. The fire strategy has to follow that brief as it develops.
Patients who move slowly
Arbroath Infirmary runs a renal dialysis unit. NHS Tayside asks that department entrances are kept clear for hospital vehicles, ambulances and fire appliances. Patients connected to treatment cannot always leave quickly, which makes moving them horizontally to a protected area part of the plan.
Building types
The building types we see in Arbroath
- Fire Strategy for Heritage Buildings and Conversions
Baltic Works, the Old Corn Exchange, the former Town House at 88 High Street and the Old Church on Kirk Square
- Fire Strategy for Hotels and Hospitality
The Royal Hotel on High Street, listed Category B
- Fire Strategy for Retail and Leisure Buildings
The Webster Memorial Theatre and the community centre in the former Drill Hall on Marketgate
- Fire Strategy for Hospitals and Healthcare Buildings
Arbroath Infirmary on Rosemount Road
What we deliver
Fire strategy services in Arbroath.

Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Fire Strategy Review and Peer Review
Independent second opinion, UK wide
Read more
Fire Strategy Plans and Drawings
Annotated plans for every storey, UK wide
Read moreCommon questions
Fire strategy questions in Arbroath, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsAngus Council warns that starting work without a building warrant is an offence and could lead to a fine of up to £5000.
Guides
Guides worth reading first.
More in Scotland
All locationsFire strategy in Arbroath
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply