Skip to content

Arbroath town centre, Abbey to Harbour and Keptie Pond

Arbroath is one of three Scottish communities receiving £20 million over ten years through the Plan for Neighbourhoods, while a regeneration grant of £2,138,985 is going to its courthouse project. We write fire strategies for Arbroath's listed works, its theatre and High Street buildings and the community projects reusing older property.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Arbroath buildings

The £20 million comes as endowment-style funding and support for the Arbroath Neighbourhood Plan. A Neighbourhood Board will use local input to prepare a ten-year Regeneration Plan and a three-year Investment Plan, with board meetings listed through to 26th October 2026.

The Scottish Government announced its 2025 to 2026 Regeneration Capital Grant Fund awards on 22nd May 2025, including £2,138,985 to Angus Council and the Arbroath Courthouse Community Trust. Three of the 19 conservation areas in Angus are in Arbroath: Abbey to Harbour, Keptie Pond and West Port.

The Angus Local Development Plan was adopted in September 2016. The council is consulting on draft chapters of its Evidence Report and says a new plan is likely to be adopted in 2031. NHS Tayside runs Arbroath Infirmary at the south end of the town, with a minor injuries unit open from 8am to 8pm every day and a renal dialysis unit.

Who decides

Who approves a fire strategy in Arbroath

Planning
Angus Council (official source, opens in a new tab)
Still working to the 2016 plan and consulting on draft Evidence Report chapters for its successor.
Building standards
Angus Council Building Standards (official source, opens in a new tab)
Grants warrants across Angus as verifier, working from Angus House at Orchardbank in Forfar.
Fire station
Arbroath Community Fire Station (official source, opens in a new tab)
Crews at Ponderlaw Street are listed as wholetime and on call. Carnoustie and Montrose are on call stations.
Regeneration
Arbroath Plan for Neighbourhoods (official source, opens in a new tab)
Angus Council's page on the ten-year programme and its Neighbourhood Board.

Local issues

What an Arbroath fire strategy has to deal with.

01

A Category A works building

Baltic Works on Dens Road, formerly Arbroath Warehouse Limited Bond Number 1, is listed Category A (HES reference LB21141). Reusing a large historic industrial building means setting compartment sizes and travel distances on open floors without removing the structure that earned the listing.

02

A High Street theatre

The Webster Memorial Theatre at 64 High Street was listed Category C on 18th December 2009 (LB51409). A theatre needs separation between stage and auditorium and exits sized for a full house.

03

Older buildings in community hands

The courthouse grant and the community centre in the former Drill Hall on Marketgate, listed Category C (LB52386), both bring community uses into older buildings. A new mix of uses changes how many people are inside and how they get out. The fire strategy has to follow that brief as it develops.

04

Patients who move slowly

Arbroath Infirmary runs a renal dialysis unit. NHS Tayside asks that department entrances are kept clear for hospital vehicles, ambulances and fire appliances. Patients connected to treatment cannot always leave quickly, which makes moving them horizontally to a protected area part of the plan.

Building types

The building types we see in Arbroath

Common questions

Fire strategy questions in Arbroath, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Angus Council warns that starting work without a building warrant is an offence and could lead to a fine of up to £5000.

Guides

Guides worth reading first.

More in Scotland

All locations

Fire strategy in Arbroath

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.