Glasgow is home to over 635,000 people and more than 1,800 listed items, among them the Glasgow School of Art, which burned in 2014 and again in 2018. We write fire strategies for the city's theatres, hospitals, multi storey flats and Category A buildings, prepared for the council's building warrant process.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Glasgow buildings

Glasgow City Council adopted its City Development Plan in March 2017, replacing City Plan 2. National Planning Framework 4 has formed part of the statutory development plan alongside it since 13th February 2023. The representation period on Proposed City Development Plan 2, with 20 policies and 36 Areas of Change, closed at midnight on 18th November 2026 ahead of a Modifications Report and Examination.

City Deal Glasgow is investing £411m in the city, including £123.4m on the Avenues city centre projects and £27m at Collegelands Calton Barras. The Clyde Waterfront and West End Innovation Quarter project carries £113.9m of capital investment along the river from the city centre to Govan, with a proposed cross-river connection between Govan and Partick. The University of Glasgow holds Planning Permission in Principle to expand onto the former Western Infirmary site, which the council expects to bring 20,000 more students over 20 years.

The draft Scottish Fire and Rescue Service plan for Glasgow for 2026 to 2029 counts 11 wholetime stations and about 460 operational roles across 175 square kilometres. The same plan places its fire safety enforcement and auditing officers in offices at Cowcaddens, Yorkhill and Calton. The service describes the cluster of stations in and around the city centre as the highest density of stations and wholetime appliances anywhere in Scotland.

Who decides

Who approves a fire strategy in Glasgow

Planning
Glasgow City Council (official source, opens in a new tab)
Decides planning applications across the city under the 2017 City Development Plan and NPF4.
Building standards
Glasgow City Council Building Standards and Public Safety (official source, opens in a new tab)
Grants building warrants as the city's verifier and also covers raised structures and safety at sports grounds.
Fire station
Cowcaddens Fire Station (official source, opens in a new tab)
The SFRS Board decided in June 2026 to rebuild it on the adjacent Maitland Street site and restore its second wholetime pumping appliance.
City plan
Proposed City Development Plan 2 (official source, opens in a new tab)
Its representation period closed on 18th November 2026, with a Modifications Report and Examination to follow.

Local issues

What a Glasgow fire strategy has to deal with.

01

Concealed voids and old ducts

The Glasgow School of Art on Renfrew Street is listed Category A (HES reference LB33105). A Scottish Parliament committee report of 8th March 2019 recorded the Scottish Fire and Rescue Service finding that timber lined voids and obsolete ventilation ducts were a major contributory factor in the spread of its 2014 fire. The service's report on the 15th June 2018 fire recorded the cause as undetermined and found that an unlimited air supply through the duct system intensified the fire.

02

Category A theatres

The King's Theatre on Bath Street and the Theatre Royal on Hope Street are both listed Category A. An auditorium in a listed theatre needs stage separation, smoke ventilation and enough exit width found within fabric the listing protects.

03

Multi storey flats

The draft fire and rescue plan for Glasgow commits to completing a quarterly inspection programme for high rise domestic buildings and multi storey flats across the city. A retrospective strategy records how an existing tower's stairs, lobbies and alarm arrangements work together. New domestic blocks with a storey above 18 metres need two escape stairs under Scottish guidance.

04

Station changes in June 2026

The SFRS Board decided in June 2026 to close Yorkhill, cut Govan and Springburn to one wholetime appliance each and reinstate a second wholetime appliance at Maryhill. A fire engineered design that relies on fire service intervention should be tested against the station pattern in place when the warrant is sought.

Building types

The building types we see in Glasgow

Common questions

Fire strategy questions in Glasgow, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Glasgow City Council's building standards service assesses applications against the standards set under the Building (Scotland) Act 2003. The same council also decides planning applications in Glasgow.

Guides

Guides worth reading first.

More in Scotland

All locations

Fire strategy in Glasgow

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.