Skip to content

Edinburgh's Old and New Towns, Granton and Leith

Edinburgh has two UNESCO World Heritage Sites, 50 conservation areas and a building standards service that received 4,297 building warrant and associated applications in 2025/26. We write fire strategies for the city's theatres, stations, waterfront housing and the listed buildings of the Old and New Towns.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Edinburgh buildings

City of Edinburgh Council's verification report for 2025/26 puts the value of work covered by those 4,297 applications at just under £800 million and calls the service one of the largest building standards services in the UK. Any application with estimated works over £250,000 qualifies for a pre-application meeting, as does any building deemed a High Risk Building. Staging of the warrant and the compliance plan approach can both be raised at that meeting.

City Plan 2030 was adopted on 7th November 2024 and replaced the local development plan of 2016. On 1st October 2026 the Scottish Government confirmed that the Evidence Report for City Plan 2040 was sufficient, which lets the council move on to its Proposed Plan. The Old and New Towns were inscribed as a World Heritage Site in 1995 and the Forth Bridge followed in 2015.

The council reported on 7th October 2026 that construction had started on the next phase of Granton Waterfront, with 847 net zero homes, 387 of them affordable, along with 14 commercial units and a new primary school on former industrial land. That phase belongs to a wider £1.3 billion transformation of the waterfront planned to deliver 3,500 homes and Scotland's largest coastal park.

Who decides

Who approves a fire strategy in Edinburgh

Planning
City of Edinburgh Council (official source, opens in a new tab)
Weighs applications against City Plan 2030 while City Plan 2040 moves towards its Proposed Plan.
Building standards
City of Edinburgh Council Building Standards (official source, opens in a new tab)
The verifier for the city. A fire engineered approach is considered only as supporting information within the general arrangements stage of a staged warrant.
Fire station
Tollcross Fire Station (official source, opens in a new tab)
One of seven wholetime stations covering the city. Its building on West Tollcross, opened in 1986, was listed Category B in December 2023 while still in operational use.
Regeneration
Granton Waterfront (official source, opens in a new tab)
Council news from 7th October 2026 on the phase of 847 homes now under way.

Local issues

What an Edinburgh fire strategy has to deal with.

01

Fire during construction works

The Scottish Fire and Rescue Service was alerted at 2.52am on Thursday 9th July 2026 to a fire in a former retail building on Princes Street that was undergoing construction works. At its height around 50 firefighters, six fire appliances, two high reach appliances and additional specialist resources were mobilised. There were no reported casualties. The service said the building had suffered extensive damage. A building part way through refurbishment can lose compartment walls, fire stopping and detection in stages, which is why the works period needs its own fire plan.

02

Auditoria in Category A fabric

The Usher Hall and the King's Theatre are both listed Category A (HES references LB27780 and LB27656). Auditoria in listed buildings need smoke control and exit routes that work within the fabric the listing protects.

03

A listed railway station

Waverley Station is listed Category A together with Waverley Bridge and the former Parcels Office (HES reference LB30270). A busy station has to clear smoke while passengers reach open air by routes that cope with peak crowds.

04

Phased waterfront housing

The current Granton phase mixes 847 homes with commercial units and a primary school. Scottish standards have required automatic fire suppression in buildings containing new flats since 1st March 2021. A site built block by block also has to keep appliance access and water supplies working for each building as the next one goes up.

Building types

The building types we see in Edinburgh

Common questions

Fire strategy questions in Edinburgh, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

The council's verification report for 2025/26 says it has used the Fire Engineering Hub of the Scottish Building Standards Hub to obtain third party checks on complex fire engineered solutions.

Guides

Guides worth reading first.

More in Scotland

All locations

Fire strategy in Edinburgh

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.