Upper Street, Holloway, Clerkenwell and Archway
Islington adopted its Local Plan on 28th September 2023, caps tall buildings site by site above a 30 metre threshold and has the Emirates Stadium, with a capacity of 60,704, within its boundary. We write fire strategies for council homes, Clerkenwell offices, venues and the borough's chapels and town halls.
- Reply
- Same-day reply
- Fee
- Fixed, agreed before we start
- Signed off by
- A Chartered Engineer (CEng)
- Coverage
- In-house engineering, UK wide
- Scroll
Overview
Fire strategy for Islington buildings
The Local Plan has three parts: the Strategic and Development Management Policies, the Site Allocations and the Bunhill and Clerkenwell Area Action Plan. It sets a minimum of 13,175 homes between 2020/21 and 2036/37, which works out at 775 a year. Sites in the Bunhill and Clerkenwell plan are expected to deliver 1,260 homes and 216,900 square metres of office space.
The former Holloway Prison on Parkhurst Road is allocated as site NH7, a 39,791 square metre site owned by Peabody. The allocation is for residential-led development with community uses, including a women's centre building, together with open space and an energy centre. It is guided by the Holloway Prison Site SPD, with an estimated timescale of 2026/27 to 2030/31.
The council says it is building more than 750 new council homes. Islington sits in two opportunity areas, King's Cross with Camden and City Fringe and Tech City with Hackney and Tower Hamlets. The second has capacity for 15,500 homes and 50,500 jobs by 2041.
Who decides
Who approves a fire strategy in Islington
- Planning
- Islington Council (official source, opens in a new tab)
- The London Borough of Islington, using the Local Plan adopted in September 2023.
- Building control
- Islington Council Building Control (official source, opens in a new tab)
- A council service supported by ISO 9001. Higher-risk buildings sit outside it and are approved by the Building Safety Regulator.
- Fire station
- Islington Fire Station (official source, opens in a new tab)
- The Upper Street station, at number 278, was completed in 1993. The borough's second station is Holloway, on Hornsey Road.
- Local Plan
- Islington Local Plan (official source, opens in a new tab)
- The council's page for the three documents adopted in 2023.
Local issues
What an Islington fire strategy has to deal with.
Heights fixed for each site
Policy DH3 treats anything over 30 metres as tall and accepts it only on allocated sites or named sites in spatial strategy areas, up to the maximum in Table 8.1. Tall building sites are identified at King's Cross, Nag's Head, Finsbury and Archway. Because the height is capped in advance, stair numbers, evacuation lifts and firefighting shafts have to fit an envelope that cannot grow.
A stadium crowd
LFB names the Emirates Stadium, with a capacity of 60,704, as one of the most significant risk sites in the borough. Crowds on match days put heavy demands on exit capacity and stewarding. Buildings near the stadium need fire service access that still works when the streets fill with spectators.
Offices becoming homes
An Article 4 Direction in the Central Activities Zone removes the permitted development right to turn Class E premises into homes. Where such a change does go ahead through planning, the fire strategy must add separation between flats and a protected escape route that an office layout may never have needed.
Chapels and halls in use
Union Chapel, the Charterhouse and Wesley's Chapel are listed Grade I. Finsbury Town Hall is Grade II* and the Almeida Theatre Grade II. Upgrading escape and detection for audiences and congregations has to be reconciled with the protected interiors.
Building types
The building types we see in Islington
- Fire Strategy for Blocks of Flats and Apartments
The Holloway Prison site and the council's new homes
- Fire Strategy for Offices and Commercial Buildings
Office space in Bunhill and Clerkenwell
- Fire Strategy for Heritage Buildings and Conversions
Union Chapel, the Charterhouse, Islington Town Hall and the Almeida Theatre
- Fire Strategy for Schools and Education Buildings
City St George's, University of London, at Northampton Square
What we deliver
Fire strategy services in Islington.

Fire Strategy Reports
New build, refurbishment and change of use, UK wide
Read more
Gateway 2 and Gateway 3 Support
Higher-risk buildings, BSR submissions, UK wide
Read more
Retrospective Fire Strategy
Existing buildings, Building Safety Act 2022, UK wide
Read more
Regulation 38 Fire Safety Information
Building Regulations 2010 regulation 38, England and Wales
Read moreCommon questions
Fire strategy questions in Islington, answered.
Cannot see your question? Get in touch and we will answer it directly.
All fire strategy questionsPolicy DH3 of the 2023 Local Plan defines a tall building as one over 30 metres. Each allocated site has its own maximum height.
Guides
Guides worth reading first.
More in London
All locationsFire strategy in Islington
Tell us about the building
Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.
- 01Written in-house by the engineer who will defend it to the approver
- 02Approved Document B, BS 9999, BS 9991 and BS 7974
- 03Building Control and fire authority engagement handled for you
- 04Projects of every size, across the UK
Request a quote
Same-day reply