Redbridge's 2018 Local Plan steers tall buildings to zones in Ilford, Seven Kings, Goodmayes and Gants Hill, while its 16 conservation areas include Wanstead Village and Woodford Broadway. We write fire strategies for Ilford's towers, schemes along the Crossrail corridor and the borough's listed mansions and chapels.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for Redbridge buildings

Full Council adopted the Redbridge Local Plan 2015 to 2030 on 15th March 2018. The GLA's 2025 pen portrait lists work on its successor as not started. The 55 hectare Ilford Opportunity Area, first designated as an intensification area in 2004, has London Plan capacity for 6,000 homes.

The council says Ilford's Housing Zone could bring over £500 million of development investment. Horizon's 122 units were completed in July 2018 and The Paragon's 141 in December 2019. Ilford Western Gateway is planned for approximately 1,000 homes and 30,000 square feet of commercial and community space, with Countryside selected in September 2022.

Ilford station's new northern entrance building opened in September 2022. Sainsbury's Chapel Place gained permission in September 2024 for 837 units. Article 4 directions in the borough include the Bungalow Estate from 2017 and Aldersbrook and Lake House from 2020.

Who decides

Who approves a fire strategy in Redbridge

Planning
London Borough of Redbridge (official source, opens in a new tab)
Applications are decided under the Local Plan adopted in March 2018.
Building control
Redbridge Building Control (official source, opens in a new tab)
An in-house team at Lynton House on Ilford High Road, with same day inspections if booked before 10am. Work on higher-risk buildings goes to the Building Safety Regulator for approval.
Fire station
Ilford Fire Station (official source, opens in a new tab)
At 460 High Road, Ilford. LFB's borough page adds Hainault and Woodford.
Regeneration
Ilford regeneration (official source, opens in a new tab)
The council's page for the Housing Zone, Ilford Western Gateway and The Spark Ilford.

Local issues

What a Redbridge fire strategy has to deal with.

01

A 42 storey consent at One Station Road

One Station Road was approved in September 2020 for 370 units in buildings up to 42 storeys. The 2025 pen portrait recorded no start on site. A tower of that height falls under the higher-risk building regime. Its evacuation approach and firefighting shafts have to be fixed before the design moves on.

02

Zoned tall building clusters

Policy LP27 supports tall and large buildings in Ilford town centre, East Ilford, Seven Kings, Goodmayes and Gants Hill. Where several tall blocks rise close together, appliance routes and water supplies have to be planned across neighbouring sites.

03

Stepped heights at Gants Hill

At Gants Hill the plan holds street frontages to 3 storeys and set back development to 5, with taller heights at the edge. Set back upper floors raise questions about escape from terraces and fire spread across the lower roofs.

04

Listed hospital buildings

The former Merchant Seamen's Orphan Asylum at Wanstead Hospital and the chapel of the Ilford Hospital of St Mary and St Thomas of Canterbury are both listed Grade II*. Reusing them means fitting compartmentation and detection into historic fabric with listed building consent.

Building types

The building types we see in Redbridge

Common questions

Fire strategy questions in Redbridge, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Redbridge, the GLA and TfL consulted until 30th October 2026 on a plan proposing around 6,000 homes, 1,200 jobs and a new civic heart around the Town Hall. Adoption is expected in 2027.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in Redbridge

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.