Skip to content

The City Cluster, Fleet Street and the Barbican

The City of London Corporation decides its own planning applications, runs its own building control service and has a single fire station at Dowgate, which is also home to London's Fire Investigation Team. We write fire strategies for City Cluster towers, office refurbishments, civic buildings such as Guildhall and the Barbican's listed residential blocks.

Reply
Same-day reply
Fee
Fixed, agreed before we start
Signed off by
A Chartered Engineer (CEng)
Coverage
In-house engineering, UK wide
Scroll

Overview

Fire strategy for City of London buildings

The Inspectors' report on City Plan 2040, published on 14th October 2026, concludes that the plan is sound subject to the main modifications it sets out. The Corporation says the new plan will replace the Local Plan 2015 once adopted, a step not yet confirmed by mid November 2026. The submission draft plans for at least 1,200,000 square metres of extra office floorspace between 2021 and 2040 and at least 1,706 net additional homes from 2025/26 to 2039/40.

The Minister for Housing and Planning wrote to the Planning Inspectorate asking for further consideration of tall buildings and heritage, in a direction tied to the Tower of London World Heritage Site. After an additional hearing on 2nd September 2026 the Inspectorate concluded that the City Cluster contours in Figure 15 of the plan should remain unaltered.

On Fleet Street the Corporation is funding a £600 million justice quarter at Salisbury Square. It comprises a courts building with 18 courtrooms for economic and cyber crime, a new City of London Police headquarters, a commercial building, a public square and a listed building to be transformed into a hospitality venue. The courts building had been topped out by September 2025.

Who decides

Who approves a fire strategy in City of London

Planning
City of London Corporation (official source, opens in a new tab)
The Square Mile's own planning authority, working from the Local Plan 2015 while City Plan 2040 awaits adoption.
Building control
City of London Building Control (official source, opens in a new tab)
An in-house Corporation service with fire engineering specialists on staff. Work on a higher-risk building is approved by the Building Safety Regulator instead.
Fire station
Dowgate Fire Station (official source, opens in a new tab)
The City's only station stands on Upper Thames Street. LFB's risk plan puts 28 watch members there alongside the Fire Investigation Team.
City Plan 2040
City Plan 2040 examination (official source, opens in a new tab)
The Corporation's page for the Inspectors' report and the tall buildings hearing.

Local issues

What a City of London fire strategy has to deal with.

01

Towers inside fixed height contours

The submission draft of City Plan 2040 treats any building over 75m above Ordnance Datum as tall and caps heights at the contour rings around the City Cluster. Towers built up to their contour can hold very large office populations, which means stair widths, phased evacuation and firefighting shafts have to be settled before the massing is fixed. LFB records a drill with the Eastern Cluster high-rise group in which 6,500 occupants of one building were evacuated.

02

Listed market and insurance buildings

Leadenhall Market is listed Grade II* and the Lloyd's Building was listed Grade I in 2011. The draft plan names Leadenhall Market, St Mary Axe, Lime Street and the setting of Bevis Marks Synagogue in its City Cluster policy. Upgrading escape and detection in buildings like these has to work around the fabric and interiors that the listing protects.

03

Courts and police on one site

Salisbury Square puts 18 courtrooms and a police headquarters beside a commercial building and a hospitality venue. Court buildings generally keep the public, the judiciary and those in custody on separate routes, which escape design has to respect. Different uses sharing one site also need clear compartment lines and coordinated fire service access.

04

Homes that another station reaches first

LFB says the Barbican Estate, of about 2,000 flats, primarily receives fire cover from Shoreditch Fire Station in Hackney. Because the Barbican is listed Grade II, any change to compartmentation, doors or detection in its blocks has to respect the listed fabric. A fire strategy for the estate also has to assume crews arriving from outside the Square Mile.

Building types

The building types we see in the City of London

Common questions

Fire strategy questions in City of London, answered.

Cannot see your question? Get in touch and we will answer it directly.

All fire strategy questions

Adoption had not been confirmed by mid November 2026, although the Inspectors found the plan sound on 14th October 2026 subject to main modifications. The Local Plan 2015 stays in force until the Corporation adopts the new plan.

Guides

Guides worth reading first.

More in London

All locations

Fire strategy in City of London

Tell us about the building

Send us the drawings, the building type and the stage you are at. We reply the same day with a clear scope, programme and fixed fee.

  • 01Written in-house by the engineer who will defend it to the approver
  • 02Approved Document B, BS 9999, BS 9991 and BS 7974
  • 03Building Control and fire authority engagement handled for you
  • 04Projects of every size, across the UK

Request a quote

Same-day reply

Only used to reply to this enquiry.

We reply the same day.